Attachment 8 - Consolidated RFI Log - Gov Responses - 10 Jul 26.xlsx

XLSX spreadsheet 38 KB Posted

Attached to
Install New FOC from ITB 910 to ITB 1365
Solicitation number
FA488726R0008
Issued by

About this file

This is a Consolidated Request for Information (RFI) Log with Government Responses documenting 99 questions submitted by contractors and the corresponding Air Force answers provided between June 9 and June 24, 2026 for solicitation FA488726R0008.

The RFI log addresses technical, operational, and administrative requirements for the fiber optic cable (FOC) installation project from ITB 910 to ITB 1365 at Luke Air Force Base, Arizona. Key technical clarifications include: 48-strand fiber is acceptable as an alternative to the specified 36-strand fiber with government approval; LC UPC connectors are required; Corning is the standard for fiber landing termination equipment and Great Lakes is the standard for lockable cabinets; all manholes require confined space procedures; approximately 32 manholes/handholes and one vault exist on the route; and existing conduit has been verified as suitable for the new innerduct and fiber installation. Critical operational requirements clarified include: airfield work outside flying hours (0630-2230 M-Th, 0630-1830 Friday) is encouraged; personnel require radios capable of ATC communication; temporary construction waivers and FAA 7460-1 submission 45 days prior to construction start are mandatory; blue stake notification and private locators are required for trenching; manhole access keys will be provided by the government; and the existing network cabinet in ITB1365 remains in place with government responsible for removing the storage cabinet. Administrative clarifications address wage determination application, confined space safety plan and quality control plan requirements in proposals, CMMC Level 1 certification per SOW 2.1.8, management of quality control manager and superintendent as separate roles, and confirmation that the project is based on calendar days rather than business days.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

REQUEST FOR INFORMATION LOG
CONTRACT #: TBDSOLICITATION #:FA488726R0008Attachment 8 - Luke AFB Input 10 Jul 2026
SUBMITTED BY CONTRACTORTO BE COMPLETED BY GOVERNMENT
RFI #DATEDOCUMENTSHEET / PAGE / PARADISCIPLINEQUESTION / ISSUERESPONSE DATERESPONSEPOCCHANGE TO SOLICITATION REQUIRED (YES OR NO)DOCUMENT REVISEDQUESTION SUBMITTED BY
OFFICE SYMNAME
0019-Jun-26I am assuming we will get all forms necessary when we need to work on the airfield? Is working on the airfield only during certain hours?6/23/26Temporary construction waiver will be required before work can be started on the airfield, as well as FAA 7460-1 submission NLT 45 days prior to the start of construction. Airfield flying hours are 0630-2230 M-Th & 0630-1830 on Fridays, however we highy encourage work to be completed outside of flying.OSAAMSgt Defayette
0029-Jun-26For radios is that something we bring or something Luke AFB supplies us and will there be a procedure we go over on what we need to call out?6/18/26Personnel operating on the airfield will require a radio capable of communicating with ATC, specifically when operating within the controlled movement area. 56 CS will loan the radios needed to fulfill the bonafide requirement.SCXPJohn McHan
0039-Jun-26Does the TGB need to be grounded to earth in building 1365?6/18/26YesSCXPJohn McHan
0049-Jun-26Would you like any ladder rack or sleeves in the IT room of building 1365?6/18/26Yes. Ladder rack is needed between the two cabinets. Sleeves are required if there is none available for entry into the room.SCXPJohn McHan
0059-Jun-26Panel 1 in the utility room looked full is there another panel we can go too or is the back up panel ok? Building 13656/17/26Panel 3 the Emergency Generator panel has a spare phase available for a 120v circuit.CENEarnest Perkins
0069-Jun-26Commscope ok to use for fiber and all compoents?6/18/26Commscope is acceptable for fiber. Corning is the Luke AFB standard for fiber landing components.SCXPJohn McHan
0079-Jun-26You would like the Great Lakes lockable cabinet?6/18/26Per SOW 2.2.1., all new equipment cabinets shall be lockable and compatible with existing lockable cabinets. Coordinate with the 56CS/SCXP to ensure a common lock/key in all cabinets matching existing locks/keys. Equipment cabinets shall have sufficient ventilation, cable pathway access, and space to allow for maintenance and operation of the equipment. Lockable Great Lakes cabinet is the Luke AFB standard.SCXPJohn McHan
0089-Jun-26Will there be an acceptable lay down for my underground sub to put their heavy equipment?6/17/26Provide total space required and duration to enable the government to identify and approve a suitable area.CENEarnest Perkins
0099-Jun-26I saw this job wants a POC on site throughout the whole project can you please confim.6/18/26A contractor designated POC is required throughout the project. Contractor will determine if POC fulfills multiple roles specified in the SOW.SCXPJohn McHan
0109-Jun-26I know standard time is 7:30-4:30 but would we be able to start any earlier for example 6?6/23/26Work on the airfield is encouraged after published flying hours, but can be coordinated in advance with Airfield Management. Requests to perform work outside of normal duty hours shall be IAW SOW 3.3.OSAAMSgt Defayette
0119-Jun-26I am assuming you would like on reel testing of the fiber as well?6/18/26Yes.SCXPJohn McHan
0129-Jun-26Are we allowed to have our own dumpster rental on site untill no longer needed for the project?6/17/26Yes.CENEarnest Perkins
0139-Jun-26It is hard to tell from the SOW but will any roads need to be closed?6/18/26No road closures are required.SCXPJohn McHan
0149-Jun-26Is the contractor responsible for any cut overs from the old cabinet to the new cabinet in 1365 or just demo of the old cabinet?6/18/26Current network cabinet is to remain in place, therefore no cutovers are required. A storage cabinet is required to be removed/relocated. Government is responsible to perform removal/relocation of the storage cabinet to facilitate installation of the new network cabinet.SCXPJohn McHan
0159-Jun-26In the SOW it says approximatley 13,500 feet of fiber and only 6500 feet of maxcell. Wouldn,t you want about 13,500 feet of maxcell as well sice it will be all new all the way through?6/18/26There is existing maxcell available for a sizable portion of the path. The SOW provides details on existing and new maxcell requirements.SCXPJohn McHan
0169-Jun-26I am assuming there will need to be a blue steak number and private locator becasuse there will be some trenching done.6/17/26Yes, call AZ bluestake give them the contractor info and the location of the dig. They may ask for GPS coordinates. Once Bluestake verifies the location they will provide you a bluestake number. Add that number to the AF103 and CE will start coordinating with the shops to do their line location. Bluestake will mark their area and will notify you when they are done.CENEarnest Perkins
0179-Jun-26For the 2 outlest for the cabinet do you want them to be dedicated?6/18/26Yes.SCXPJohn McHan
0189-Jun-26For the cabinet would you like any PDU's and if so do you have a part number?6/18/26Yes. One "Great Lakes GLPDU19-815HV Basic Power Distribution Unit" or equivalent is acceptable.SCXPJohn McHan
0199-Jun-26For the cabinet do you want any vertical wire managers?6/18/26Not required.SCXPJohn McHan
02011-Jun-26Lead times on a 36 strand fiber is 33-35 weeks from order date, would you be ok if we pulled a 48 strand fiber if that only has a 3-5 day lead time?6/18/2648 strand fiber is acceptable. If installing 48 strand fiber due to quicker availability, installation of 48-port FODPs is required; however, government approval is required prior to purchase.SCXPJohn McHan
02112-Jun-26SOWSOW DocumentOptical Fiber Install/SplicingHow many manholes will require a confined space setup?6/18/26All manholes entered require proper confined space procedures.SCXPJohn McHan
02212-Jun-26SOWPage 9 / 2.2.1Optical Fiber Install/SplicingCan a picture of the current cabinet keys and locks be provided?6/18/26Current lockable Great Lakes cabinets use a standard lock and a "1333" key.SCXPJohn McHan
02312-Jun-26SOWSOW DocumentOptical Fiber Install/SplicingIs there a reason for the specific request of 36CT fiber?6/18/26The requirement is to engineer, furnish, install and test (EFI&T) 36 Strands (St) Single Mode (SM) FOC from ITB910 to ITB1365, which is the standard count for this application.SCXPJohn McHan
02412-Jun-26SOWSOW DocumentOptical Fiber Install/SplicingIf justifiable, would approval to use a higher fiber count be granted? Justifiable reasons to consider - lead time for manufacturing and delivery, cost, and use for future expansion.6/18/26Higher fiber count is acceptable. If installing higher fiber count due to quicker availability, installation of appropriate FODPs is required; however, government approval is required prior to purchase.SCXPJohn McHan
02512-Jun-26SOWSOW DocumentOptical Fiber Install/SplicingIs there a preferred manufacturer for fiber optic cable, cabinets, panels, NEMA boxes, and cassettes? NOTE: After reaching out to one of our fiber distributors, I was quoted that it will take approx. 52 weeks to get a reel of Corning 36CT manufactured and delivered in the length needed to complete this project.6/18/26Luke AFB standard for fiber landing termination equipment is Corning and lockable Great Lakes for cabinet. No preferrence for remaining items.SCXPJohn McHan
02612-Jun-26SOWSOW DocumentOptical Fiber Install/SplicingWhat certifications do your fiber technicians and splicers hold?6/18/26SOW defines experience requirements for key personnel.SCXPJohn McHan
02712-Jun-26SOWSOW DocumentOptical Fiber Install/SplicingHow many RU's are open?6/18/26Per the SOW, B910 requires a 19-inch FODP to be installed in a 23-inch existing rack, therefore appropriate hardware is required to securely mount the FODP. There is a maximum of three RU's available with the current configuration of the rack and existing equipment. Additional existing racks are available with more RU's can be used in lieu of the rack identified in the SOW to ease congestion and work required.SCXPJohn McHan
02812-Jun-26SOWSOW DocumentOptical Fiber Install/SplicingPlease confirm whether any Government-specific cybersecurity (CMMC Level 1) or telecommunications certification requirements apply to personnel performing fiber installation and splicing activities.Does this also apply to subcontractors?6/24/26Contractor personnel requirements are identified in SOW 2.1.8 and on page 7, 2.1.3.2 sent in Amendment 2 of the solicitation.SCXP /
56 CONS/PKBJohn McHan /
TSgt Laura NegleyYesSOW
02913-Jun-26SOWSOW DocumentOptical Fiber Install/SplicingAre the existing manholes locked with any specific security bolts/locks? If so, will we be provided the key/security bit?6/18/26Yes. Manholes have locking covers. Key will be provided to access required manholes.SCXPJohn McHan
03014-Jun-26SOWPage 10 / 2.2.2.7.1Optical Fiber Install/SplicingLC UPC or LC APC connectors6/18/26LC UPC.SCXPJohn McHan
03110-Jun-26SOWSOW DocumentConstructiondoes the government know how many of the manholes will require to have any standing water pumped out prior to working in them and also if a quanity is not known how is the contractor to bid this unknown quanity6/18/26Unknown as conditions change.SCXPJohn McHan
03210-Jun-26SOWSOW DocumentConstructionplease confirm that we are not required to remove any items from any of the manholes6/18/26There is not a requirement to remove any items from the manholes beyond pumping water as well as any residue created by this project.SCXPJohn McHan
03310-Jun-26SOWSOW DocumentConstructionplease confirm the work hours that we are to conform to6/23/26Airfield Management urges all work to be conducted on the airfield outside of flying hours, however can accommodate work within the airfield opreating hours if need be. Requests to perform work outside of normal duty hours shall be IAW SOW 3.3.OSAAMSgt Defayette
03410-Jun-26SOWSOW DocumentConstructionare we to perform any type of waterproofing in the manholes6/18/26Ducts used shall be sealed.SCXPJohn McHan
03510-Jun-26SOWSOW DocumentConstructionwill we be required to adhere to any specialized security measures during the workWorking within restricted areas will require escort and must be coordinated through security forces.OSAAMSgt Defayette
03610-Jun-26SOWSOW DocumentConstructionwill there be a requirement for a government overseerer while personnel are in the manholes6/18/26No government overseer is required; however, government may inspect work at any time.SCXPJohn McHan
03710-Jun-26SOWSOW DocumentConstructionis there a wage determination that can be sent to the contractors6/24/26A wage determination was included in the solicitation. Attachment 7 - WD - AZ20260039_AZ20260057 dated 18 May 2656 CONS/PKBTSgt Laura Negley
03810-Jun-26SOWSOW DocumentConstructionwill the inspections be performed at each manhole once the activity in that manhole has been completed6/18/26Coordinate inspections with the PM, 56 CS/SCXP.SCXPJohn McHan
03910-Jun-26SOWSOW DocumentConstructiondoes the government wish to inspect each manhole prior to the strt of work in each6/18/26Inspections shall be coordinated with the PM, 56 CS/SCXP.SCXPJohn McHan
04010-Jun-26SOWSOW DocumentConstructionare there additional requirements that pertain to the anti-terrorisom document that we should be aware of6/18/26No additional requirements exist.SCXPJohn McHan
04110-Jun-26SOWSOW DocumentConstructionis the fiber cable to be shielded or unshielded6/18/26Shielded is not required.SCXPJohn McHan
04215-Jun-26SOWSOW DocumentConstructionin the areas where the new Geo Textile Interduct is to be installed, does the government know if there are existing pull tapes so the new interduct can be pulled in6/18/26Unknown as pull tapes deteriorate over time.SCXPJohn McHan
04315-Jun-26SOWSOW DocumentConstructionLC UPC or LC APC connectors6/18/26LC UPC.SCXPJohn McHan
04415-Jun-26SOWSOW DocumentConstructionare the existing man holes locked with any specific security locks/bolts, if so will we be provided with access hardware or keys6/18/26Yes. Manholes have locking covers. Key will be provided to access required manholes.SCXPJohn McHan
04515-Jun-26SOWSOW DocumentConstructionplease confirm whether any government specific cybersecurity (CMMC Level1) or telecommunications certification requirements apply to personnel performing the fiber installation and splicing activities. Does this also apply to subcontractors6/18/26Relevant contractor requirements are specified in SOW 2.1.8.SCXPJohn McHan
04615-Jun-26SOWSOW DocumentConstructionhow many RU'S are open6/18/26Per the SOW, B910 requires a 19-inch FODP to be installed in a 23-inch existing rack, therefore appropriate hardware is required to securely mount the FODP. There is a maximum of three RU's available with the current configuration of the rack and existing equipment. Additional existing racks are available with more RU's can be used in lieu of the rack identified in the SOW to ease congestion and work required.SCXPJohn McHan
04715-Jun-26SOWSOW DocumentConstructionwhat certifications does the government fiber installers hold6/18/26SOW 2.1.8.4 defines experience requirements for key personnel.SCXPJohn McHan
04815-Jun-26SOWSOW DocumentConstructiondoes the government have a prefered manufacturer for cable, cabinets, panels, NEMA boxes and cassettes. The lead time for cable that was quoted by one supplier for the cable was 52 weeks for the lengths required6/18/26Luke AFB standard for fiber landing termination equipment is Corning and lockable Great Lakes for cabinet. No preferrence for remaining items.SCXPJohn McHan
04915-Jun-26SOWSOW DocumentConstructionif justifiable, could approval be given to use a higher fiber count be given6/18/26Higher fiber count is acceptable. If installing higher fiber count due to quicker availability, installation of appropriate FODPs is required; however, government approval is required prior to purchase.SCXPJohn McHan
05015-Jun-26SOWSOW DocumentConstructionis there a reason for the request of 36CT fiber6/18/26The requirement is to engineer, furnish, install and test (EFI&T) 36 Strands (St) Single Mode (SM) FOC from ITB910 to ITB1365, which is the standard count for this application.SCXPJohn McHan
05115-Jun-26SOWSOW DocumentConstructioncan a photo of the current cabinet keys and locks be provided6/18/26Current lockable Great Lakes cabinets use a standard lock and a "1333" key.SCXPJohn McHan
05215-Jun-26SOWSOW DocumentConstructionhow many of the manholes be required a confined space setup6/18/26All manholes entered require proper confined space procedures.SCXPJohn McHan
05315-Jun-26Attachment 10L.7.2.2.Management and Schedule calls for a comprehensive schedule that includes several items. The section then goes to list that offeror will include a confined space safety plan, a quality control plan, and key personnel listing to ensure OSHA compliance and safety adherence. The page limitation for this factor is 15 pages. Please confirm a full safety plan, QC plan, and personnel listings are NOT required at this stage of the proposal and are to be submitted after award.6/24/26A confined space safety plan, quality control plan and key personnel listing are to be included to ensure OHSA compliance and safety adherence. Page limit will be adjusted to allow for more pages for incorporating the management and schedule.56 CONS/PKBTSgt Laura NegleyYesAttachment 10 - Section L Instructions Conditions and Notices to Offerors
05415-Jun-26Attachment 10L.7.2.3Please confirm the requirement of Attachment 10, L.7.2.3.6/24/26Provide a detailed list of proposed equipment that demonstrates the ability to identify and access the mandatory, calibrated equipment required to safely execute underground fiber optic installation and testing.56 CONS/PKBTSgt Laura Negley
05515-Jun-26Attachment 10L.8.3Paragraph L.8.3 states that an offeror will return completed questionnaires (Attachment 9)/CPARS reports via email or DoD Safe in Volume II – Past Performance directly to the Contracting Officer and Contract Specialist, listed in Section L.3 as part of the proposal. Please confirm if these are to be included in Volume II Past Performance or if they need to be sent separately directly to the CO/CS.6/24/26These are to be included in Volume II Past Performance, do not send separately.56 CONS/PKBTSgt Laura Negley
05615-Jun-26Attachment 7Attachment 7 includes two wage determinations AZ20260039 05/18/2026 Building and AZ20260057 05/18/2026 Heavy. How is the contractor to use wages? For example, each of the wage determinations has ELECTRICIAN rate that is different from the other, so which one must be used?6/24/26Please use the wage rate that best suits what the work is performing. Wage rate will be at the employers discretion but must identified on the payroll through job classification.56 CONS/PKBTSgt Laura Negley
05715-Jun-26Attachment 7Attachment 7 includes two wage determinations AZ20260039 05/18/2026 Building and AZ20260057 05/18/2026 Heavy but none of them has a LOW VOLTAGE ELECTRICIAN rate. Please clarify which minimum rate must be used for Communication workers.6/24/26Please use the wage rate that best suits what the work is performing. Wage rate will be at the employers discretion but must identified on the payroll through job classification.56 CONS/PKBTSgt Laura Negley
05815-Jun-26Attachment 1-SOW27NADuring the site visit it was noticed that MH-44-C was buried and couldn't be found. Is it the contractors responsibility to locate buried MH or vaults that can't be found or will the base locate them?6/18/26Base will locate buried MH or vaults.SCXPJohn McHan
05915-Jun-26NANANAPlease confirm the total amount of vaults, manholes & handholes.6/18/26Approximately 32 MH/HH, one vault.SCXPJohn McHan
06015-Jun-26Attachment 1-SOWNAThe SOW paragraph 2.2.2.9 is titled New Maintenance Holes/Hand-holes. Please confirm the project does not required any new Maintenance holes/Hand-holes.6/18/26No new MH/HH.SCXPJohn McHan
06115-Jun-26NANANAFor bidding purposes, can it be confirmed approximately how many existing vaults, manholes & handholes need to be pumped out?6/18/26Unknown as conditions change.SCXPJohn McHan
06215-Jun-26NANANACan the sign in sheet for the site visit be send out as an attachment?6/24/26The sign in sheet for the site visit will not be sent out as an attachment as it contains personal information that requires permissions for public release.56 CONS/PKBTSgt Laura Negley
06315-Jun-26NANANACan it be confirmed that the existing raceways between building 910 and 1365 have sufficient space for the new FOC and innerduct?6/18/26Based on the government survey to develop the engineering package existing ducts between building 910 and 1365 have sufficient space for the new FOC and innerduct.SCXPJohn McHan
06415-Jun-26NANANACan it be confirmed that the contractor is not responsible for making any repairs to the existing vaults, manholes & handholes beyond pumping out the water?6/18/26Contractor is not responsible for reparing damage they did not cause.SCXPJohn McHan
06515-Jun-26NANANAPlease confirm working hours for this project?6/23/26Airfield Management urges all work to be conducted on the airfield outside of flying hours, however can accommodate work within the airfield opreating hours if need be. Requests to perform work outside of normal duty hours shall be IAW SOW 3.3.OSAAMSgt Defayette
06615-Jun-26NANANAWhat is the requirement for project oversight/supervision? Is the contractor responsible to provide a full time project manager, superintendent and quality control manager? Or a superintendent can cover quality and safety as well?6/18/26No, we recommend to keep QCM and Superintendent duties seperated.CENEarnest Perkins
06715-Jun-26Attachment 1-SOWPage 13, par 2.2.3.1.1Is the “total of 3” referring to the cell count of a single 3 cell innerduct? Or is it required to have 3 – 3” 3 cell innerducts for an actual total of 9 cells? Please clarify.6/18/26Total 3-cell (if installed new). NOT 9-cell.SCXPJohn McHan
06815-Jun-26Attachment 1-SOWPage 13, par 2.2.3.1.2Is it required to pull one (1) – 3” 3 cell innerduct inside of EXISTING conduit?6/18/26Yes. SOW 2.2.3.1.2 provides details pertaining to this requirement.SCXPJohn McHan
06915-Jun-26Attachment 1-SOWThe SOW requires installation of new 3-cell geo-textile innerduct within existing conduit systems. Please confirm that the existing conduit pathway between ITB910 and ITB1365 has been verified as continuous and suitable for installation of the specified innerduct and fiber optic cable. If existing conduits are found to be blocked, damaged, or lacking capacity, please clarify whether remediation will be handled as a change order.6/18/26Based on the government survey to develop the engineering package existing ducts between building 910 and 1365 have sufficient space for the new FOC and innerduct. If existing conduits are found to be blocked, damaged, or lacking capacity remediation will be handled as a change order due to unforeseen site conditions.SCXPJohn McHan
07015-Jun-26Please provide any available as-built drawings, utility records, duct bank records, handhole/manhole schedules, and telecommunications infrastructure documentation for the proposed fiber route.6/18/26Existing applicable drawings and records will be provided after contract award.SCXPJohn McHan
07115-Jun-26Please provide approved manufacturer requirements for the new 36-port FODPs or confirm that equivalent products meeting the project specifications are acceptable.

Please clarify ownership and disposition requirements for the existing cabinet in ITB1365.

Should the cabinet be:

•Removed and turned over to the Government,
•Relocated within the facility, or
•Removed and disposed of by the contractor?6/18/26Luke AFB standard for fiber landing termination equipment is Corning and lockable Great Lakes for cabinet. No preferrence for remaining items. Existing network cabinet is to remain in place.SCXPJohn McHan
07215-Jun-26SolicitationGeneralContractMay the QCM assume the responsibilities of the SSHO on this project?6/18/26Yes, however, QCM must fully meet all SSHO qualification criteria and if the contract permits.CENEarnest Perkins
07315-Jun-26SolicitationGeneralContractMay the QCM assume the responsibilities of the Superintendent on this project?6/18/26No, we recommend to keep QCM and Superintendent duties seperated.CENEarnest Perkins
07415-Jun-26SolicitationGeneralContractMay the SSHO assume the responsibilities of the Superintendent on this project?6/18/26Yes, however, Superintendent must fully meet all SSHO qualification criteria and if the contract permits.CENEarnest Perkins
07515-Jun-26SOW2.2.2.10TelecomWhere underground installation is impractical due to existing utilities or field conditions, will surface-mounted conduit be permitted?6/18/26Surface-mounted conduits are not acceptable in lieu of underground installation.SCXPJohn McHan
07615-Jun-26SOW2.2.2.10TelecomWill exposed conduit need to be painted to match existing conditions and/or red banded?6/18/26If referring to surface-mounted conduits in lieu of underground installation, they are not permitted.SCXPJohn McHan
07715-Jun-26SOW2.2.2TelecomCan existing conduit be reused?6/18/26The SOW provides details on existing and new ducts/conduits.SCXPJohn McHan
07815-Jun-26SOW3.3ContractWill off-hour work be required?6/18/26SOW 3.3 provides the core working hours and procedures to request different hours. Airfield management would prefer avoiding work during flying hours for work on the airfield but can accommodate work during flying hours upon receipt of specific details pertaining to the work requirements, equipment, and duration. Access to B910 and B1365 will be limited to normal duty hours when personnel are available to open the building and escort as necessary.SCXPJohn McHan
07915-Jun-26Solicitation/ SOWGeneralContractFor the RFl what is the order of precedence, code or scope?6/18/26SOW was written IAW applicable codes. In the event of conflict, code takes precedence.SCXPJohn McHan
08015-Jun-26Solicitation/ SOWGeneralContractIn the event of conflict between scope of work and code what will be preferred?6/18/26SOW was written IAW applicable codes. In the event of conflict, code takes precedence.SCXPJohn McHan
08115-Jun-26SolicitationPage 1, Item 11ContractPlease confirm if this project is based on calendar days or business days?6/24/26This project is based on calendar days.56 CONS/PKBTSgt Laura Negley
08215-Jun-26SOW2.1.3.2SecurityPlease confirm whether CMMC Level 2 certification is required at proposal submission or prior to receiving network infrastructure drawings.6/18/26Relevant contractor requirements are specified in SOW 2.1.8.SCXPJohn McHan
08315-Jun-26SOW2.2TelcomCan the Government provide existing pathway drawings and/or as-built drawings for the existing manhole and handhole duct system associated with this project?6/18/26Existing applicable drawings and records will be provided after contract award.SCXPJohn McHan
08415-Jun-26SOW2.2TelcomPlease confirm the approximate quantity of existing conduit to be reused versus the approximately 1,300 LF of new conduit to be installed.6/18/26SOW provides approximations for both existing and new conduits relevant to this project.SCXPJohn McHan
08515-Jun-26SOW2.2.3.1.3TelcomPlease provide details regarding the existing network cabinet being removed in ITB1365 and confirm whether disposal is required or if it will remain Government property.6/18/26Current network cabinet is to remain in place. A storage cabinet is required to be removed/relocated. Government is responsible to perform removal/relocation of the storage cabinet to facilitate installation of the new network cabinet.SCXPJohn McHan
08615-Jun-26SOW2.2.6TelcomPlease identify any allowable outage windows and required notification periods for cutover activities.6/18/26New FOC is additional to active fiber currently servicing the facilities, thus no outages are needed for cutover.SCXPJohn McHan
08715-Jun-26SOW2.2.2TelcomWill all existing manholes, handholes, and duct banks along the proposed route be accessible at the time of construction?6/18/26Yes.SCXPJohn McHan
08815-Jun-26SOW2.2.2.10Civil/ TelecomPlease confirm whether horizontal directional drilling will be permitted where field conditions make open trenching impractical.6/18/26Yes.SCXPJohn McHan
08915-Jun-26SOW2.2.2.1; 2.2.2.9Existing Manholes; New Maintenance Holes/HandholesPlease confirm the quantity of existing manholes and handholes anticipated for use along the route and whether any require repair, cleaning, pumping, or replacement.6/18/26Approximately 32 MH/HH, one vault. Repair/cleaning limited to damage/residue caused during this project. Pumping unkown as conditions change.SCXPJohn McHan
09015-Jun-26SOW2.2.2.4; 2.2.2.1Closures for Cable Splicing; Fiber Optic SplicesPlease confirm the anticipated quantity and locations of required fiber splices along the route.6/18/26Per SOW 2.2.3.1.5., the intent is to install the cable in one continuous length to the extent that is practical. If fiber is installed in one continuos length, fiber splices will not be required, only termination of the fiber at each of the buildings.SCXPJohn McHan
09115-Jun-26SOW1.0; 2.2; 2.2.3.1Scope; Specific Requirements; Infrastructure InstallationPlease provide the estimated percentage of the route utilizing existing duct bank infrastructure versus newly constructed pathway.6/18/26SOW provides approximations for both existing and new duct bank infrastructure relevant to this project.SCXPJohn McHan
09215-Jun-26SOW2.2.2; 2.2.3.1.2Outside Plant Requirements; Geo-textile Innerduct InstallationHas the Government verified adequate spare duct capacity exists within the existing pathway system to accommodate the new 36-strand fiber and innerduct?6/18/26Based on the government survey to develop the engineering package existing ducts between building 910 and 1365 have sufficient space for the new FOC and innerduct.SCXPJohn McHan
09315-Jun-26SOW2.2Specific RequirementsPlease confirm whether adequate power currently exists at ITB1365 to support the new network cabinet installation.6/17/26There is one space available in the generator panel that will support one 20amp 120v circuit.CENEarnest Perkins
09415-Jun-26Solicitation/ SOWGeneralTelecomPlease confirm that new duct bank installation is only required for the portions of the fiber route identified within the solicitation and that no additional duct bank installation is anticipated beyond those areas.6/18/26Confirmed.SCXPJohn McHan
09515-Jun-26Solicitation/ SOWGeneralTelecomPlease confirm the quantity and locations of existing manholes and handholes anticipated for use as part of this project and whether any new manholes or handholes are required.6/18/26Approximately 32 MH/HH, one vault. No new MH/HH, just new conduit.SCXPJohn McHan
09615-Jun-26Solicitation/ SOWGeneralAirfield OperationsPlease provide the requirements and procedures for obtaining airfield access and any required airfield waivers necessary to perform work associated with this project.6/23/26A temporary construction waiver will be required for this project as well as airfield drivers training for all personnel operating a vehicle on the airfield. Information required will be number & type of vehicles, heights of equipment. Close coordination with Airfield Management & CE is required.OSAAMSgt Defayette
09715-Jun-26Solicitation/ SOWGeneralAirfield OperationsPlease provide the requirements and procedures for coordinating and communicating with Air Traffic Control (ATC) during construction activities associated with this project.6/23/2656 OSS Airfield Management will provide the requirements and procedures for coordinating with Air Traffic Control (ATC) prior to granting airfield access. Contractors will need to be trained on airfield driving or escorted by a licensed driver. Escorts will not be provided by AM personnel.OSAAMSgt Defayette
09815-Jun-26Solicitation/ SOWGeneralAirfield OperationsPlease provide all requirements, restrictions, escort requirements, training requirements, badging requirements, and operational procedures associated with performing work within the airfield environment.6/23/26Airfield Management will coordinate airfield driving requirements, however restricted area and badging requirements will need to be coordinated with PM and SFS.OSAAMSgt Defayette
099
100
101

File details come from the government source that posted it. Updated .