Questions and Answers 18 Sept 25.pdf

PDF 23 KB Posted

Attached to
Paint Booth Preventative Maintenance
Solicitation number
FA488725R0013
Issued by

About this file

This document is a Questions and Answers (Q&A) file dated September 25, containing two specific technical inquiries related to a government contract's Performance Work Statement (PWS). The first question addresses a compressed air filtration and regulation system, with the government confirming the requirement is located in the booth maintenance section of Appendix A and specifying the current filters are DeVilbiss Desiccant Air Dryer System (Part Number DA500 130026). The second question concerns an Operation & Maintenance (O&M) manual for a reverse-osmosis water treatment system, which the government has definitively stated has been removed from the contract requirements.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions 18 Sept 25

1. RFI # 7 response, second bullet added a Compressed air filtrations and regulation systems. This was not included in the updated PWS checklist. Does the Government still want this system included in the PWS? if yes, please provide inspection and replacement requirements. A. The requirement is on the checklist located under booth maintenance (Appendix A). The current filters installed are DeVilbiss Desiccant Air Dryer System PN

(DA500 130026)

2. The documents received 09/11 included an O&M manual for a Reverse-osmosis water treatment system. Why is it attached? Does the Government expect and PMIs or repairs for this system? if yes, please provide inspection and replacement requirements.

A. This requirement has been removed.

File details come from the government source that posted it. Updated .