PWS - Water Treatment - IOM.pdf

PDF 3 MB Posted

Attached to
Paint Booth Preventative Maintenance
Solicitation number
FA488725R0013
Issued by

About this file

This document is an Installation, Operation, and Maintenance Manual for DriSteem HydroTrue Pre-treatment Systems, covering water softeners and dechlorinator systems. The manual provides comprehensive technical specifications for various water treatment system models, including single and duplex water softeners and dechlorinators with tank sizes ranging from 7" to 30" in diameter. Key details include electrical requirements (120V, single-phase, 60 Hz), specific media volumes, backwash flow rates, and shipping weights for different configurations.

The manual offers detailed guidance on installation, startup, operation, and maintenance, including step-by-step instructions for loading carbon and softener media, setting control valve parameters, and troubleshooting common issues. It includes water quality testing procedures, replacement part information, and a two-year limited warranty. The systems are designed to remove water hardness, chlorine, and other impurities, with options for different salt usage settings and regeneration cycles to optimize water treatment performance.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Installation, Operation, and Maintenance Manual

READ AND SAVE THESE INSTRUCTIONS

Pre- t reatment Systems

HYDROTRUE™

ii DRISTEEM PRE-TREATMENT SYSTEMS INSTALLATION, OPERATION, AND MAINTENANCE MANUAL

WARNINGS AND CAUTIONS

WARNING CAUTION

Indicates a hazardous situation that could result in death or serious injury if instructions are not followed.

Indicates a hazardous situation that could result in damage to or destruction of property if instructions are not followed.

mc_051508_1145

WARNING

Attention installer Read this manual before installing, and leave this manual with product owner. This product must be installed by qualified HVAC and electrical contractors and in compliance with local, state, federal, and governing codes. Improper installation can cause property damage, severe personal injury, or death as a result of electric shock, burns, or fire.

DriSteem Technical Support: 800-328-4447

Read all warnings and instructions Read this manual before performing service or maintenance procedures on any part of the system. Failure to follow all warnings and instructions could produce the hazardous situations described, resulting in property damage, personal injury, or death.

Failure to follow the instructions in this manual can cause moisture to accumulate, which can cause bacteria and mold growth or dripping water into building spaces. Dripping water can cause property damage; bacteria and mold growth can cause illness.

If the IOM is missing, go to www.dristeem.com to download a replacement.

Shut down the energy source Before performing service or maintenance procedures on any part of the system, verify that all energy sources are off.

Failure to shut down the energy source could result in fire, explosion, electrical shock, and other hazardous conditions.

These hazardous conditions could cause property damage, personal injury, or death.

Contact with energized circuits can cause property damage, severe personal injury or death as a result of electrical shock or fire. Do not remove electrical panel cover/door or access panels until electrical power is disconnected.

Follow the shutdown procedure in the system IOM before performing service or maintenance procedures on any part of the system.

Warnings and cautions iii DRISTEEM PRE-TREATMENT SYSTEMS INSTALLATION, OPERATION, AND MAINTENANCE MANUAL

Warnings and cautions

FILL IN THE FOLLOWING INFORMATION FOR YOUR RECORDS

Date of purchase ___________________________________________________________________________________________________________

Customer's name ___________________________________________________________________________________________________________

Model number ___________________________________________________________________________________________________________

Serial number ___________________________________________________________________________________________________________

WARNING

Disconnect electrical power Disconnect electrical power before installing supply wiring or performing service or maintenance procedures on any part of the system. Failure to disconnect electrical power could result in fire, electrical shock, and other hazardous conditions.

These hazardous conditions could cause property damage, personal injury, or death.

Contact with energized circuits can cause property damage, severe personal injury, or death as a result of electrical shock or fire.

Follow the shutdown procedure in this manual before performing service or maintenance procedures on any part of the system.

Electric shock hazard If the system starts up during maintenance, severe bodily injury or death from electric shock could occur. To prevent such start-up, follow the procedure below before performing service or maintenance procedures on this system:

1. �Shut off all electrical power to the system using field-installed fused disconnect, and lock all power disconnect switches in OFF position.

2. Close field-installed manual water supply shut-off valve.

iv DRISTEEM PRE-TREATMENT SYSTEMS INSTALLATION, OPERATION, AND MAINTENANCE MANUAL

WARNINGS AND CAUTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ii

OVERVIEW

Dechlorinator specifications Single water softener specifications Duplex water softener specifications Optional pretreatment skid mounting Skidded single water softener and dechlorinator specifications Skidded duplex water softener and dechlorinator specifications Skidded duplex water softener specifications

INSTALLATION

Electrical installation Site requirements Start-up checklist System startup Plumbing and wiring for dual softener 21, 24, 30 inch models

Table of contents

1 DRISTEEM PRE-TREATMENT SYSTEMS INSTALLATION, OPERATION, AND MAINTENANCE MANUAL

Table of contents

ATTENTION INSTALLER

Read this manual before installing.

Leave manual with product owner.

DriSteem® Technical Support 800-328-4447

WHERE TO FIND MORE INFORMATION

Our website:

The following documents is available on our web site: www.dristeem.com

• Water Treatment Systems Catalog

• RO 200 series Installation, Operation, and Maintenance Manual

• RO 400 series Installation, Operation, and Maintenance Manual

DriCalc® sizing and selection software:

DriCalc, our software for system sizing and selection, can be ordered at our web site.

Call us at 800-328-4447 Obtaining documents from our web site or from DriCalc is the quickest way to view our literature.

OPERATION

Softener and dechlorinator start-up Loading the carbon media Loading the water softener media

MAINTENANCE

Components Troubleshooting Water quality test strips Water quality test log

REPLACEMENT PARTS

Water treatment system

WARRANTY

2 DRISTEEM PRE-TREATMENT SYSTEMS INSTALLATION, OPERATION, AND MAINTENANCE MANUAL

OVERVIEW

Dechlorinator specifications

DECHLORINATOR

The dechlorinator removes chlorine from the water that degrades the reverse osmosis membranes.

120V, single-phase, 60 Hz, 5A electrical service is required for all dechlorinator models, except for the DC-CB dechlorinator (requires no electrical service).

Table 2-1:

Dechlorinator specifications

Dechlorinator model* Media volume Dimensions, diameter x height Connections, in /out Backwash flow** Shipping weight***

DC-CB Carbon black filter 4" × 20" (102 x 508 mm) 1" — —

DC-744 0.5 ft3 (0.014 m3)

7" × 44" (178 x 1118 mm) 1" 2.7 gpm (10.2 L/m) 100 lbs (45.4 kg)

DC-844 0.75 ft3 (0.021 m3) 8" x 44" (203 x 1118 mm) 1" 3.2 gpm (12.1 L/m) 115 lbs (52.2 kg)

DC-948 1.00 ft3 (0.028 m3) 9" × 48" (229 x 1219 mm) 1" 4.2 gpm (15.9 L/m) 130 lbs (59.0 kg)

DC-1054 1.50 ft3 (0.042 m3) 10" x 54" (254 x 1372 mm) 1" 5.3 gpm (20.1 L/m) 150 lbs (68.0 kg)

DC-1252 2.00 ft3 (0.050 m3) 12" x 52" (305 x 1321 mm) 1" 7.5 gpm (28.4 L/m) 190 lbs (86.2 kg)

DC-1354 2.50 ft3 (0.071 m3) 13" x 54" (330 x 1372 mm) 1" 10.0 gpm (37.9 L/m) 225 lbs (102.1 kg)

DC-1465 3.00 ft3 (0.085 m3) 14" x 65" (356 x 1651 mm) 1" 12.0 gpm (45.4 L/m) 335 lbs (152.0 kg)

DC-1665 4.00 ft3 (0.113 m3) 16" x 65" (406 x 1651 mm) 1" 15.0 gpm (56.8 L/m) 385 lbs (174.6 kg)

DC-2162 6.00 ft3 (0.170 m3) 21" x 62" 6(533 x 1575 mm) 1.5" 25.0 gpm (94.6 L/m) 645 lbs (292.6 kg)

DC-2472 8.00 ft3 (0.227 m3) 24" x 72" (610 x 1829 mm) 1.5" 33.0 gpm (124.9 L/m) 950 lbs (430.9 kg)

DC-3072 12.50 ft3 (0.354 m3) 30" x 72" (762 x 1829 mm) 2" 50.0 gpm (189.3 L/m) 1535 lbs (696.3 kg)

* DC-CB is wall mounted; all other models are floor mounted.

** Based on 60 to 90 psi (415 to 620 kPa) inlet pressure.

*** DC-2162, DC-2472, and DC--3072 media shipped separate, but included in shipping weight total.

FIGURE 2-1: DECHLORINATOR

FIGURE 2-2: WALL MOUNT DECHLORINATOR

3 DRISTEEM PRE-TREATMENT SYSTEMS INSTALLATION, OPERATION, AND MAINTENANCE MANUAL

Single water softener specifications

Table 3-1:

Single softener and brine tank specifications

Softener model Media volume per tank

Resin tank diameter (A) x height (B) (per tank)

Connections, in/out Backwash flow**

Brine tank diameter (C) x height

(D) Shipping weight***

WS-744 0.5 ft3 (0.014 m3)

7" × 44" (178 x 1118 mm) 1" 1.35 gpm

(4.9 L/m) 18" x 33"

(457 x 838 mm) 110 lbs (49.9 kg)

WS-844 0.75 ft3

(0.021 m3) 8" x 44"

(203 x 1118 mm) 1" 1.70 gpm (6.4 L/m)

18" x 40" (457 x 1016 mm) 125 lbs (56.7 kg)

WS-948 1.00 ft3

(0.028 m3) 9" × 48"

(229 x 1219 mm) 1" 2.2 gpm (8.3 L/m)

18" x 40" (457 x 1016 mm) 140 lbs (63.5 kg)

WS-1054 1.50 ft3

(0.042 m3) 10" x 54"

(254 x 1372 mm) 1" 2.7 gpm (10.2 L/m)

18" x 40" (457 x 1016 mm) 160 lbs (72.6 kg)

WS-1252 2.00 ft3

(0.050 m3) 12" x 52"

(305 x 1321 mm) 1" 3.2 gpm (12.1 L/m)

18" x 40" (457 x 1016 mm) 200 lbs (90.7 kg)

WS-1354 2.50 ft3

(0.071 m3) 13" x 54"

(330 x 1372 mm) 1" 4.2 gpm (15.9 L/m)

18" x 40" (457 x 1016 mm) 235 lbs (106.6 kg)

WS-1465 3.00 ft3

(0.085 m3) 14" x 65"

(356 x 1651 mm) 1" 5.3 gpm (20.1 L/m)

24" x 41" (610 x 1041 mm) 345 lbs (156.5 kg)

WS-1665 4.00 ft3

(0.113 m3) 16" x 65"

(406 x 1651 mm) 1" 6.5 gpm (24.6 L/m)

24" x 41" (610 x 1041 mm) 395 lbs (179.2 kg)

WS-2162 6.00 ft3 (0.170 m3)

21" x 62" (533 x 1575 mm) 1.5" 12.0 gpm

(45.4 L/m) 30" x 48"

(762 x 1219 mm) 655 lbs (297.1 kg)

WS-2472 8.00 ft3 (0.227 m3)

24" x 72" (610 x 1829 mm) 1.5" 15.0 gpm

(56.8 L/m) 39" x 48"

(991 x 1219 mm) 960 lbs (435.4 kg)

WS-3072 12.50 ft3 (0.354 m3)

30" x 72" (762 x 1829 mm) 2" 25.0 gpm

(94.6 L/m) 39" x 48"

(991 x 1219 mm) 1545 lbs (701.0 kg)

** Based on 60 to 90 psi (415 to 620 kPa) inlet pressure.

*** WS-2162, WS-2472, and WS--3072 media shipped separate, but included in shipping weight total.

WATER SOFTENER AND BRINE TANK

The water softener and brine tank are floor-mounted and exchange water hardness for sodium.

120V, single-phase, 60 Hz, 5A electrical service is required for all water softener models.

FIGURE 3-1: SINGLE WATER SOFTENER

AND BRINE TANK

A A

B D

C

Water outlet

Water inlet

OM-7940

4 DRISTEEM PRE-TREATMENT SYSTEMS INSTALLATION, OPERATION, AND MAINTENANCE MANUAL

Duplex water softener specifications

Table 4-1:

Duplex softener and brine tank specifications

Softener model* Media volume per tank

Resin tank diameter (A) x height (B) (per tank)

Connections, in/out Backwash flow**

Brine tank diameter (C) x height

(D) Shipping weight

WD-744 0.5 ft3 (0.014 m3)

7" × 44" (178 x 1118 mm) 1" 1.35 gpm

(4.9 L/m) 100 lbs (45.4 kg) 210 lbs (95.3 kg)

WD-844 0.75 ft3

(0.021 m3) 8" x 44"

(203 x 1118 mm) 1" 1.7 gpm (6.4 L/m)

18" x 40" (457 x 1016 mm) 250 lbs (113.4kg)

WD-948 1.00 ft3

(0.028 m3) 9" × 48"

(229 x 1219 mm) 1" 2.2 gpm (8.3 L/m)

18" x 40" (457 x 1016 mm) 270 lbs (122.5 kg)

WD-1054 1.50 ft3

(0.042 m3) 10" x 54"

(254 x 1372 mm) 1" 2.7 gpm (10.2 L/m)

18" x 40" (457 x 1016 mm) 310 lbs (140.6 kg)

WD-1252 2.00 ft3

(0.050 m3) 12" x 52"

(305 x 1321 mm) 1" 3.2 gpm (12.1 L/m)

18" x 40" (457 x 1016 mm) 390 lbs (176.9 kg)

WD-1354 2.50 ft3

(0.071 m3) 13" x 54"

(330 x 1372 mm) 1" 4.2 gpm (15.9 L/m)

18" x 40" (457 x 1016 mm) 460 lbs (208.7 kg)

WD-1465 3.00 ft3

(0.085 m3) 14" x 65"

(356 x 1651 mm) 1" 5.3 gpm (20.1 L/m)

24" x 41" (610 x 1041 mm) 680 lbs (308.4 kg)

WD-1665 4.00 ft3

(0.113 m3) 16" x 65"

(406 x 1651 mm) 1" 6.5 gpm (24.6 L/m)

24" x 41" (610 x 1041 mm) 778 lbs (352.9 kg)

** Based on 60 to 90 psi (415 to 620 kPa) inlet pressure.

WATER SOFTENER AND BRINE TANK

The water softener and brine tank are floor-mounted and exchange water hardness for sodium.

120V, single-phase, 60 Hz, 5A electrical service is required for all water softener models.

FIGURE 4-1: DUPLEX WATER SOFTENER

AND BRINE TANK

A A

B D

C

Water outlet

NPT water inlet

OM-7941

5 DRISTEEM PRE-TREATMENT SYSTEMS INSTALLATION, OPERATION, AND MAINTENANCE MANUAL

Duplex water softener specifications

Table 5-1:

Duplex softener and brine tank specifications

Softener model* Media volume per tank

Resin tank diameter (A) x height (B) (per tank)

Connections, in/out Backwash flow**

Brine tank diameter (C) x height

(D) Shipping weight***

WD-2162 6.00 ft3 (0.170 m3)

21" x 62" (533 x 1575 mm) 1.5" 12.0 gpm

(45.4 L/m) 30" x 48"

(762 x 1219 mm) 1300 lbs (589.7 kg)

WD-2472 8.00 ft3 (0.227 m3)

24" x 72" (610 x 1829 mm) 1.5" 15.0 gpm

(56.8 L/m) 39" x 48"

(991 x 1219 mm) 1910 lbs (866.4 kg)

WD-3072 12.50 ft3 (0.354 m3)

30" x 72" (762 x 1829 mm) 2" 25.0 gpm

(94.6 L/m) 39" x 48"

(991 x 1219 mm) 3080 lbs (1397.1 kg)

** Based on 60 to 90 psi (415 to 620 kPa) inlet pressure.

*** WD-2162, WD-2472, and WD--3072 media shipped separate, but included in shipping weight total.

FIGURE 5-1: DUPLEX WATER SOFTENER

AND BRINE TANK

6 DRISTEEM PRE-TREATMENT SYSTEMS INSTALLATION, OPERATION, AND MAINTENANCE MANUAL

Note: �Duplex water softeners for 21-inch diameter and larger must have media installed in the field.

SELECT PRETREATMENT SKID MOUNTING FOR EASE OF INSTALLATION

Reduce installation cost and time by having pretreatment components come pre-assembled. The DriSteem water softener(s), brine tank, and dechlorinator have a single point water inlet, water outlet, and power for all components.

•Save time and cost on installation
•Maximize clearance
•Ensure proper installation and operation

54" (1372 mm)

B

W

D

L + C

C

6" (1 52 mm)

1" (25 mm)

Optional pretreatment skid mounting

Table 6-1:

Voltages

AC adapter U.S.

Supply voltage 120 VAC

Supply frequency 60 Hz

Output voltage 12 VAC

Output current 500 mA

OM-7819a

L

7 DRISTEEM PRE-TREATMENT SYSTEMS INSTALLATION, OPERATION, AND MAINTENANCE MANUAL

Skidded single water softener and dechlorinator specifications

Table 7-1:

Skidded single water softener and dechlorinator

Skid size* (outside dimensions)

L x W x H

Tank quantity on skid

Media tank diameter (A) x height (B) (per tank)

Connections, in/out Backwash flow***

Brine tank diameter (C) x height (D) Shipping weight

52"x 26" x 54" (1321 x 660 x 1372 mm) 3 7" × 44"

(178 x 1118 mm) 1" 1.35 gpm (4.9 L/m)

18" x 33" (457 x 838 mm)

370 lbs (167.8 kg)

52"x 26" x 54" (1321 x 660 x 1372 mm) 3 8" x 44"

(203 x 1118 mm) 1" 1.70 gpm (6.4 L/m)

18" x 40" (457 x 1016 mm)

400 lbs (181.4 kg)

52"x 26" x 54" (1321 x 660 x 1372 mm) 3 9" × 48"

(229 x 1016 mm) 1" 2.2 gpm (8.3 L/m)

18" x 40" (457 x 1016 mm)

420 lbs (190.5 kg)

52"x 26" x 54" (1321 x 660 x 1372 mm) 3 10" x 54"

(254 x 1372 mm) 1" 2.7 gpm (10.2 L/m)

18" x 40" (457 x 1016 mm)

470 lbs (213.2 kg)

52"x 26" x 54" (1321 x 660 x 1372 mm) 3 12" x 52"

(305 x 1321 mm) 1" 3.2 gpm (12.1 L/m)

18" x 40" (457 x 1016 mm)

530 lbs (240.4 kg)

52"x 26" x 54" (1321 x 660 x 1372 mm) 3 13" x 54"

(330 x 1372 mm) 1" 4.2 gpm (15.9 L/m)

18" x 40" (457 x 1016 mm)

620 lbs (281.2 kg)

66"x 28" x 54" (1676 x 711 x 1372 mm) 3 14" x 65"

(356 x 1651 mm) 1" 5.3 gpm (20.1 L/m)

24" x 41" (610 x 1041 mm)

860 lbs (390.1 kg)

66"x 28" x 54" (1676 x 711 x 1372 mm) 3 16" x 65"

(406 x 1651 mm) 1" 6.5 gpm (24.6 L/m)

24" x 41" (610 x 1041 mm)

910 lbs (412.8 kg)

100"x 34" x 54" (2540 x 864 x 1372 mm) 3 21" x 62"

(533 x 1575 mm) 1.5" 12.0 gpm (45.4 L/m)

30" x 48" (762 x 1219 mm)

1540 lbs (698.5 kg)

66"x 28" x 54" ** (1676 x 711 x 1372 mm) 2 24" x 72"

(610 x 1829 mm) 1.5" 15.0 gpm (56.8 L/m)

39" x 48" (991 x 1219 mm)

2090 lbs (948.0 kg)

82"x 28" x 54" ** (2083 x 711 x 1372 mm) 2 30" x 72"

(762 x 1829 mm) 2" 25.0 gpm (94.6 L/m)

39" x 48" (991 x 1219 mm)

3280 lbs (1487.8 kg)

*Non-skidded pre-treatment dimensions are 4" (102 mm) less.
**Skid does not include brine tank. The brine tank is floor mounted.
***Based on 60 to 90 psi (415 to 620 kPa) inlet pressure.

8 DRISTEEM PRE-TREATMENT SYSTEMS INSTALLATION, OPERATION, AND MAINTENANCE MANUAL

Skidded duplex water softener and dechlorinator specifications

Table 8-1:

Skidded duplex water softener and dechlorinator

Skid size (outside dimensions)

L x W x H

Tank quantity on skid

Media tank diameter (A) x height (B) (per tank)

Connections, in/out Backwash flow*** Brine tank diameter (C) x height (D) Shipping weight

66"x 28" x 54" (1676 x 711 x 1372 mm) 4 7" × 44"

(178 x 1118 mm) 1" 1.35 gpm (4.9 L/m)

18" x 33" (457 x 838 mm)

490 lbs (222.3 kg)

66"x 28" x 54" (1676 x 711 x 1372 mm) 4 8" x 44"

(203 x 1118 mm) 1" 1.7 gpm (6.4 L/m)

18" x 40" (457 x 1016 mm)

545 lbs (247.2 kg)

66"x 28" x 54" (1676 x 711 x 1372 mm) 4 9" × 48"

(229 x 1016 mm) 1" 2.2 gpm (8.3 L/m)

18" x 40" (457 x 1016 mm)

575 lbs (260.8 kg)

66"x 28" x 54" (1676 x 711 x 1372 mm) 4 10" x 54"

(254 x 1372 mm) 1" 2.7 gpm (10.2 L/m)

18" x 40" (457 x 1016 mm)

640 lbs (290.3 kg)

66"x 28" x 54" (1676 x 711 x 1372 mm) 4 12" x 52"

(305 x 1321 mm) 1" 3.2 gpm (12.1 L/m)

18" x 40" (457 x 1016 mm)

760 lbs (344.7 kg)

66"x 28" x 54" (1676 x 711 x 1372 mm) 4 13" x 54"

(330 x 1372 mm) 1" 4.2 gpm (15.9 L/m)

18" x 40" (457 x 1016 mm)

865 lbs (392.4 kg)

82"x 28" x 54" (2083 x 711 x 1372 mm) 4 14" x 65"

(356 x 1651 mm) 1" 5.3 gpm (20.1 L/m)

24" x 41" (610 x 1041 mm)

1215 lbs (551.1 kg)

82"x 28" x 54" (2083 x 711 x 1372 mm) 4 16" x 65"

(406 x 1651 mm) 1" 6.5 gpm (24.6 L/m)

24" x 41" (610 x 1041 mm)

1363 lbs (618.2 kg)

82"x 28" x 54" ** (2083 x 711 x 1372 mm) 3 21" x 62"

(533 x 1575 mm) 1.5" 12.0 gpm (45.4 L/m)

30" x 48" (762 x 1219 mm)

2145 lbs (972.9 kg)

82"x 28" x 54" ** (2083 x 711 x 1372 mm) 3 24" x 72"

(610 x 1829 mm) 1.5" 15.0 gpm (56.8 L/m)

39" x 48" (991 x 1219 mm)

3060 lbs (1387.9 kg)

100"x 34" x 54" ** (2540 x 864 x 1372 mm) 3 30" x 72"

(762 x 1829 mm) 2" 25.0 gpm (94.6 L/m)

39" x 48" (991 x 1219 mm)

4855 lbs (2202.2 kg)

* Non-skidded pre-treatment dimensions are 4" (102 mm) less.

** Skid does not include brine tank. The brine tank is floor mounted.

*** Based on 60 to 90 psi (415 to 620 kPa) inlet pressure.

9 DRISTEEM PRE-TREATMENT SYSTEMS INSTALLATION, OPERATION, AND MAINTENANCE MANUAL

Skidded duplex water softener specifications

Table 9-1:

Skidded duplex water softener

Skid size (outside dimensions)

L x W x H

Tank quantity on skid

Media tank diameter (A) x height (B) (per tank)

Connections, in/out Backwash flow***

Brine tank diameter (C) x height (D) Shipping weight

52"x 26" x 54" (1321 x 660 x 1372 mm) 3 7" × 44"

(178 x 1118 mm) 1" 1.35 gpm (4.9 L/m)

18" x 33" (457 x 838 mm)

370 lbs (167.8 kg)

52"x 26" x 54" (1321 x 660 x 1372 mm) 3 8" x 44"

(203 x 1118 mm) 1" 1.7 gpm (6.4 L/m)

18" x 40" (457 x 1016 mm)

410 lbs (185.9 kg)

52"x 26" x 54" (1321 x 660 x 1372 mm) 3 9" × 48"

(229 x 1016 mm) 1" 2.2 gpm (8.3 L/m)

18" x 40" (457 x 1016 mm)

430 lbs (195.0 kg)

52"x 26" x 54" (1321 x 660 x 1372 mm) 3 10" x 54"

(254 x 1372 mm) 1" 2.7 gpm (10.2 L/m)

18" x 40" (457 x 1016 mm)

470 lbs (213.2 kg)

52"x 26" x 54" (1321 x 660 x 1372 mm) 3 12" x 52"

(305 x 1321 mm) 1" 3.2 gpm (12.1 L/m)

18" x 40" (457 x 1016 mm)

550 lbs (249.5 kg)

52"x 26" x 54" (1321 x 660 x 1372 mm) 3 13" x 54"

(330 x 1372 mm) 1" 4.2 gpm (15.9 L/m)

18" x 40" (457 x 1016 mm)

620 lbs (281.2 kg)

66"x 28" x 54" (1676 x 711 x 1372 mm) 3 14" x 65"

(356 x 1651 mm) 1" 5.3 gpm (20.1 L/m)

24" x 41" (610 x 1041 mm)

860 lbs (390.1 kg)

66"x 28" x 54" (1676 x 711 x 1372 mm) 3 16" x 65"

(406 x 1651 mm) 1" 6.5 gpm (24.6 L/m)

24" x 41" (610 x 1041 mm)

958 lbs (434.5 kg)

100"x 34" x 54" (2540 x 864 x 1372 mm) 3 21" x 62"

(533 x 1575 mm) 1.5" 12.0 gpm (45.4 L/m)

30" x 48" (762 x 1219 mm)

1540 lbs (698.5 kg)

66"x 28" x 54" ** (1676 x 711 x 1372 mm) 2 24" x 72"

(610 x 1829 mm) 1.5" 15.0 gpm (56.8 L/m)

39" x 48" (991 x 1219 mm)

2090 lbs (948.0 kg)

82"x 28" x 54" ** (2083 x 711 x 1372 mm) 2 30" x 72"

(762 x 1829 mm) 2" 25.0 gpm (94.6 L/m)

39" x 48" (991 x 1219 mm)

3280 lbs (1487.8 kg)

* Non-skidded pre-treatment dimensions are 4" (102 mm) less.

** Skid does not include brine tank. The brine tank is floor mounted.

*** Based on 60 to 90 psi (415 to 620 kPa) inlet pressure.

10 DRISTEEM PRE-TREATMENT SYSTEMS INSTALLATION, OPERATION, AND MAINTENANCE MANUAL

INSTALLATION

Electrical installation

The control valve and fittings are not designed to support the weight of the system or the plumbing.

• Teflon tape is recommended to be used on all threads. Do not use pipe dope, as it may break down the plastics in the control valve.

• Allow one foot of clearance to service WS1.5 valves and two feet of clearance to service WS2 and WS2QC valves.

• The valve will withstand transportation and storage temperatures of -13 °F

(-25 °C) to 131 °F (55 °C) and for short periods up to 158 °F (70 °C). If valve has been exposed to freezing conditions let valve warm up to room temperature before running water through it. The valve has been packaged to prevent damage from the effects of normal humidity, vibration and shock.

SINGLE SOFTENER LOCKOUT SWITCH

Single softeners have a RO lockout switch if it is desired to lockout the RO system to prevent any hard water passing to the RO system when the softeners are in backwash. See Figure 10-1 for connections to the RO system lockout terminals.

CAUTION

Do not use Vaseline, oils, other hydrocarbon lubricants or spray silicone anywhere. A silicone lubricant may be used on black o-rings but is not necessary.

CAUTION

Hydrocarbons such as kerosene, benzene, gasoline, etc., may damage products that contain o-rings or plastic components. Exposure to such hydrocarbons may cause the products to leak. Do not use the products(s) contained in this document on water supplies that contain hydrocarbons such as kerosene, benzene, gasoline, etc.

CAUTION

DriSteem water meters should not be used as the primary monitoring device for critical or health effect applications.

FIGURE 10-1: SINGLE SOFTENER LOCKOUT SWITCH WIRING

To lockout terminals on RO system

WMS_Lockout_wiring

11 DRISTEEM PRE-TREATMENT SYSTEMS INSTALLATION, OPERATION, AND MAINTENANCE MANUAL

SITE REQUIREMENTS

1. The plug in Power Adapter is for dry locations only, and should be connected to an uninterrupted outlet installed within 15 feet (4.57 meters) of the water conditioner. If the Power Adapter cord has not yet been connected to the control valve, remove the control valve cover and the drive bracket, and thread the Power Adapter cord through the hole in the back plate. Reinstall the drive bracket. Weave the cord through the hooks on the right hand side of the drive bracket and connect the end to the four-prong connector on the printed circuit board. Replace the cover, and plug the Power Adapter into an uninterrupted outlet.

2. The tanks should be on a firm, level surface.

3. All plumbing should be done in accordance with local codes.

4. Do not locate unit where it or its connections (including the drain and overflow lines) will ever be subjected to room temperatures below 40° F (4° C).

5. INLET/OUTLET PLUMBING: Connect to a supply line downstream of outdoor spigots. Install an inlet shutoff valve and plumb to the unit’s inlet.

Installation of a bypass valve is recommended. If using plastic fittings, ground the water conditioner per local electrical codes. Do not install any water conditioner with less than 10 feet of piping between its outlet and the inlet of a water heater. If a water meter is used, install the water meter on the outlet side of the control valve. The turbine assembly may be oriented in any direction, but is usually oriented pointing up to reduce drainage out of the pipe during service.

6. Locate the water conditioner so the distance between the drain and the water conditioner is as short as possible. All units are shipped without a drain line flow control washer. Correctly size the drain line and install an appropriately sized drain line flow control. 1.5” valves are shipped with a ¾” fitting that can be used with the drain line flow controls up to 10 gpm, or an optional 1” fitting can be purchases to be used with drain line flow controls up to 25 gpm. For higher backwash rates, the adapter can be removed and the 1 ¼” NPT threaded drain outlet can be used. For 2” valves the drain outlet is 1.5” NPT threads. Solder joints near the drain must be done prior to connecting the drain line flow control fitting. Leave at least 6” (152.4mm) between the drain line flow control fitting and the solder joints to prevent heat from damaging the flow control. Avoid elevating the drain line above the control valve where possible. Discharge the drain line through an air gap to a receptacle in accordance with local plumbing codes.

IMPORTANT: Never insert a drain line directly into a drain, sewer line or trap.

Always allow and air gap between the drain line and the receptacle to prevent back siphonage.

Site requirements

12 DRISTEEM PRE-TREATMENT SYSTEMS INSTALLATION, OPERATION, AND MAINTENANCE MANUAL

FIGURE 12-1: WATER SOFTENER CLEARANCE

Minimum 4" (102 mm) clearance

DechlorinatorBrine tank

Softener tanks

7. Regenerant tanks should be accessible for easy refilling. If the control valve is to be used to regenerate the water conditioner with brine (saturated salt solution) or other regenerants, use a polyethylene tube to connect the brine valve contained in the regenerant tank to the regenerant port on the control valve. It is recommended the brine valve contain a safety float. The 1.5” control valve’s regenerant port has a ½” fitting.

Note: ½” tubing that runs longer than 6 feet may restrict draw rates with G and H injectors. A 5/8” fitting is also available.

The 2” control valve regenerant port has a 1” threaded connection. To ensure acceptable operation of the injectors, use 1” pipe to connect to the brine tank.

An overflow drain line from the regenerant tank that discharges into an acceptable drain is recommended, as a regenerant overflow could damage furnishings or the building structure. Connect a line to the overflow fitting on the regenerant tank. If an overflow fitting is not already installed on the regenerant tank, install one. Do not elevate the overflow drain line. Discharge the overflow drain line through an air gap to a receptacle in accordance with local plumbing codes.

INSTALLATION

Site requirements

OM-7906a

13 DRISTEEM PRE-TREATMENT SYSTEMS INSTALLATION, OPERATION, AND MAINTENANCE MANUAL

If an item in the Start-up checklist below does not apply to your system, skip to the next item and continue the process.

☐��Read this manual and all other information that was provided with your system.
☐���Verify that all field wiring is done according to the instructions in this manual and in the unit wiring diagram.
☐��Confirm that proper grounding and an approved earth ground are provided.
☐Slowly turn on the water supply and confirm there are no leaks.
☐Add water to the brine tank. 1/3 water (12-inches) water and 2/3 salt.
☐Systems with tank-style carbon filter with control valve: Ensure that elastomeric Drain Line Flow Control restrictor

washer is installed correctly in drain outlet plumbing assembly. This is required to prevent overflow and potential carry-over of carbon to the drain system.

� See “Dechlorinator” on Page 22 of this manual.
☐���Inspect to insure that no flexible plumbing lines have been kinked or damaged during installation.

Start-up checklist

14 DRISTEEM PRE-TREATMENT SYSTEMS INSTALLATION, OPERATION, AND MAINTENANCE MANUAL

System startup

1. After installation is completed, turn on the supply water to check for leaks.

2. Fully open a cold water faucet downstream of the system.

3. Allow water to run until clear.

4. Close the cold water faucet.

5. Turn off the supply water.

6. The system is now ready for startup.

SYSTEM STARTUP

7. Initiate manual regeneration of the control valve to regenerate: press the REGEN button for three seconds.

8. Ensure drain line flow remains steady for 10 minutes or until clear. Step through the different regeneration cycles by pressing the REGEN button again.

9. Observe regeneration effluent and continue to regenerate until discharge is clear. Steps 7 and 8 may need to be repeated as necessary.

10. Observe that the brine tank is filling during brine tank refill cycle.

11. Install brine tank overflow line. Attach plastic tubing to the fittings from the brine tank and run to an open drain. This drain line will not be under pressure. Do not tie into the backwash drain line. This line should be higher than the normal drain line, and must be a separate line from fitting to drain. It is a safety overflow drain and will not be in use during normal operation.

12. Observe that the valve advances through the different regeneration cycles and ends in service. Step through the different regeneration cycles by pressing REGEN.

13. Fill brine tank with salt. Salt may be sodium chloride (NaCl) or potassium chloride (KCI). Fill tank to only 2/3 full. Note: The brine tank holds a large quantity of salt, so you will not need to refill at frequent intervals.

Refilling the brine tank with salt should be performed after your system is successfully installed and has been operating trouble-free. Brine tank should be refilled with salt at least two hours before the next generation is performed.

14. Review Tables 17-1 and 18-1 to ensure settings are properly programmed before placing the softener in service.

15 DRISTEEM PRE-TREATMENT SYSTEMS INSTALLATION, OPERATION, AND MAINTENANCE MANUAL

Plumbing and wiring for dual softener 21, 24, 30 inch models

Note:

•All plumbing is to be done in accordance with state and local codes.
•The control valve, fittings and/or bypass are designed to accommodate minor plumbing

misalignments but are not designed to support the weight of a system or the plumbing.

• Connect to a supply line downstream of outdoor spigots. Install an inlet shutoff valve and plumb them to the unit’s inlet. Installation of a bypass valve is recommended. If using plastic fittings, ground the water conditioner per local electrical codes.

• Do not use pipe dope or other sealant on threads. Use teflon tape on threaded inlet, outlet and drain fittings.

1. Plumb the Motorized Alternating Valve (MAV) according to Figure 15-1. Note: Ensure that the valve labeled “Alt A” is connected to the “A” port on the MAV, and the valve labeled “Alt B” is connected to the “B” port.

2. Install connecting piping between raw water source and input pipe on control valve.

3. Install drain line from control valve to a free flowing drain. Solder joints near the drain must be done prior to connecting the drain line flow control fitting. Leave at least 6” (152.4mm) between the drain line flow control fitting and the solder joints to prevent heat from damaging the flow control. Avoid elevating the drain line above the control valve where possible.

Discharge the drain line through an air gap to a receptacle in accordance with local plumbing codes.

Important: Never insert a drain line directly into a drain, sewer line or trap. Always allow an air gap between the drain line and the receptacle to prevent back siphonage.

FIGURE 15-1: PLUMBING THE MOTORIZED ALTERNATING VALVE

16 DRISTEEM PRE-TREATMENT SYSTEMS INSTALLATION, OPERATION, AND MAINTENANCE MANUAL

4. Install the water meter on the outlet side of the control valve. The meter may be threaded directly into the valve or may be plumbed separately downstream of the unit. Ensure the arrow on the meter body is going the same direction as the water flow. The turbine assembly may be oriented in any direction, but is usually oriented pointing up to reduce drainage out of the pipe during service. Meter can be installed horizontally or vertically.

5. Install piping between meter output and point of use.

6. Use a tee to install Brine/Refill line between brine tank and regenerant line.

7. Install an overflow drain line from the regenerant tank. Connect a line to the 1” overflow fitting on the regenerant tank. Do not elevate the overflow drain line. Discharge the overflow drain line through an air gap to a recaptacle in accordance with local plumbing codes.

VALVE WIRING

1.Connect MAV Motor Wire & Interconnect cable to valve head Alt A:
•On the backside of the valve, remove the strain relief cover with a screwdriver.

• Remove the cover of the valve by pulling out on the release tabs located on each side of the cover.

• Feed the MAV motor wire and interconnect (communication) cable through the hole in the back of the valve.

• Connect the MAV motor wire to the two pin connector labeled “DRIVE” on the PC Board.

• Connect the interconnect (communication) cable to the three pin connector labelled “INTERCONNECT CABLE” on the PC Board.

• After connecting the cables, weave the wires through the strain relief on the backside of the valve, and replace the strain relief cover and screw. Replace the valve cover.

2. Connect MAV Cables to valve head Alt B:

• On the backside of the valve, remove the strain relief cover with a screwdriver.

• Remove the cover of the valve by pulling out on the release tabs located on each side of the cover.

• Feed the other end of the interconnect (communication) cable & the meter cable through the hole in the back of the valve.

• Connect the interconnect cable to the three pin connector labelled “INTERCONNECT CABLE” on the PC Board.

• After connecting the cables, weave the wires through the strain relief on the backside of the valve, and replace the strain relief cover and screw. Replace the valve cover.

• Ensure meter cable is connected to the meter assembly.

Plumbing and wiring for dual softener 21, 24, 30 inch models

17 DRISTEEM PRE-TREATMENT SYSTEMS INSTALLATION, OPERATION, AND MAINTENANCE MANUAL

Softener and dechlorinator start-up

OPERATION

Table 17-1:

Set time of day

Buttons Description

1.Press NEXT until the time of day screen is displayed.
2.Press and hold the or until the SET indicator is displayed and the hour flashes.
3.Press the or until the correct hour is displayed.
4.Press NEXT. The minutes will flash.
5.Press or until the correct minute is displayed.
6.Press NEXT to return to the display screen.

Note: In the event of a prolonged power outage, time of day flashes, indicating that it needs to be reset. All other information will be stored in memory no matter how long the power outage.

Complete the steps above to reset the time of day.

18 DRISTEEM PRE-TREATMENT SYSTEMS INSTALLATION, OPERATION, AND MAINTENANCE MANUAL

Softener start-up

OPERATION

Table 18-1:

Softener start-up

Buttons Description

To enter Installer Display press NEXT and simultaneously for about 5 seconds and release.

Press or to enter the volumetric capacity in gallons. See Table 19-1. Press NEXT to go to the Day Override screen. Press REGEN to return to previous step.

Day Override: When volume capacity is set to “oFF”, sets the number of days between regenerations. When volume capacity is set to AUTO or to a volume, sets the maximum number of days between regenerations. If value set to “oFF”, regeneration initiation is triggered solely by volume used.

If value is set in days (allowable range from 1 to 28) regeneration initiation will be called for on that day regardless of actual water usage. Set Day Override using or :

• number of days between regeneration (1 to 28); or

• “oFF”.

Press NEXT. Press REGEN to return to previous step.

Next Regeneration Time (hour): Set the hour of day for regeneration using or . The default time is 2:00. This display will show “REGEN on 0 GAL” if “on 0” is selected in Set Regeneration Time

Press NEXT. Press REGEN to return to previous step.

EXIT INSTALLER DISPLAY SETTINGS

Next Regeneration Time (minutes): Set the minutes of day for regeneration using or .

Press NEXT to exit Installer Display Settings. Press REGEN to return to previous step.

19 DRISTEEM PRE-TREATMENT SYSTEMS INSTALLATION, OPERATION, AND MAINTENANCE MANUAL

OPERATION

Softener start-up

SALT USAGE AND GRAINS CAPACITY SETTINGS

The softener can be set to use different amounts of salt per regeneration. The higher the quantity of salt used, the higher the resin's hardness removing capacity will be. DriSteem recommends using 10lbs/cu. ft. Alternatively, higher salt usage may be set in order to maximize resin capacity between regenerations, or a lower salt usage settings can be used to reduce salt consumption, but this will result in more frequent regeneration.

• To find volume capacity:

• Find the model and desired salt setting from Table 19-1. DriSteem recommends using 10lbs/cu. ft. to find the total grains capacity for the tank model.

• Divide the grains capacity by the number of grains per gallon of hardness present in the feed water. (Example: If feed water is 10 grains per gallon hardness, the WS-744 [with 10cu. ft. salt setting] has 14,500 grains capacity. 14,500 ÷ 10 = 1,450 gallon capacity).

• To find brine fill time:

• Use number from Brine fill time column for the model number in the appropriate salt settings column.

Table 19-1:

Capacity (per tank) at various pounds of salt per regeneration settings

Model

15 lbs/cu. ft. 10 lbs/cu. ft.

(Recommended) 7.5 lbs/cu. ft. 5 lbs/cu. ft.

Grains capacity

Salt used per regen (pounds)

Brine fill time

(minutes)

Grains capacity

Salt used per regen

Brine fill time

(minutes)

Grains capacity

Salt used per regen

Brine fill time

(minutes)

Grains capacity

Salt used per regen

Brine fill time

(minutes)

WS-744 15,000 7.5 5.0 14,500 5.0 3.3 12,850 3.8 2.5 10,000 2.5 1.7

WS-844 18,000 9.0 6.0 17,400 6.0 4.0 15,420 4.5 3.0 12,000 3.0 2.0

WS-948 22,500 11.3 7.5 21,750 7.5 5.0 19,275 5.6 3.8 15,000 3.8 2.5

WS-1054 37,500 18.8 12.5 36,250 12.5 8.3 32,125 9.4 6.3 25,000 6.3 4.1

WS-1252 52,500 26.3 17.5 50,750 17.5 11.6 44,975 13.1 8.8 35,000 8.8 5.8

WS-1354 60,000 30.0 20.0 58,000 20.0 13.2 51,400 15.0 10.0 40,000 10.0 6.6

WS-1465 90,000 45.0 30.0 87,000 30.0 19.8 77,100 22.5 15.0 60,000 15.0 9.9

WS-1665 105,000 52.5 35.0 101,500 35.0 23.1 89,950 26.3 17.5 70,000 17.5 11.6

WS-2162 198,000 90.0 60.0 174,000 60.0 40.0 152,400 45.0 30.0 120,000 30.0 20.0

WS-2472 264,000 120.0 80.0 232,000 80.0 53.3 203,200 60.0 40.0 160,000 40 26.7

WS-3072 412,500 188.0 28.5 362,500 125.0 18.9 317,000 94.0 14.2 250,000 63.0 9.5

Water softener salt quantity estimate Total brine tank volume (cubic inches)= π r2 h

• r = radius of the brine tank in inches

• h = height of the brine tank in inches

Pounds of salt needed = 2/3 x (Brine Tank Volume / 1728) x 28

Example

For a WS-1465 softener, the pounds of salt needed = 2/3 x (π x 242 x 41 / 1728) x 28 = 200 lbs

20 DRISTEEM PRE-TREATMENT SYSTEMS INSTALLATION, OPERATION, AND MAINTENANCE MANUAL

Loading the carbon media

OPERATION

LOADING THE CARBON MEDIA

1. Place tank on a level, solid surface in the correct position for installation.

Lift the riser tube from the tank, keeping the attached hub within the opening of the tank. Within the tank, assemble the laterals onto the hub, twisting each lateral into the hub to lock securely. Gently lower the assembly to the bottom of the tank. The top of the riser tube should be about level with the top of the tank. (See Figure 20-1).

2. The “riser tube” inside the media/resin tank delivers treated water to your control valve. It will need to be temporarily covered with tape on the top end to prevent anything from falling down inside the tube during loading.

3. Step back and look at the tank to make sure it is standing straight, and not tilted. The black base on the bottom of the tank should also be straightened before filling the tank. If your tank is tilted, simply pick up the tank 2-3 inches off the floor and drop it gently (but firmly) down, favoring the side of the base that needs to be adjusted.

4. Before loading the media, fill the tank with 2-3 feet of water (or 1/3 full, depending on the tank size), to soften the fall of the rocks and prevent damage to the distributor. To load the media, use a funnel in the top of the media tank with the riser tube still inside. Make sure the riser tube is covered with tape to keep media out.

5. Scoop the media into the funnel, slowly letting it fall down inside the media tank around the riser tube. Fill the tank with the media provided, pouring the media in the following order (1st will end up on the bottom of the tank, last will end up at the top of the tank, etc.). Note: The tank will be approximately ½ - 2/3 full after loading is complete.

I. Gravel – YMGRVL11618 – 1 CF (100 lbs.) per bag

II. Gravel ¼” × 1/8” – YMGRVL1418 – 0.5 CF (50 lbs) per bag (not used in DC-2162)

III. YMC1240RCOAL – 1 CF (27.5 lbs.) per bag

6. Remove the funnel from the top of the tank, and the tape from the end of the riser tube. Brush any loose media or resin off the top opening of the tank.

7. The bottom of the control valve has an opening with O-rings inside; lubricate the O-ring with a non-petroleum based lubricant. Position the valve over the top of the media tank, making sure the top of the riser tube inserts inside the opening in the bottom of the valve.

8. Screw the valve down into the media tank. Another person should hold the tank as the valve is being snugly tightened onto the tank. Do not over-tighten. Tighten until snug, tighten a bit more, then Stop. The large o-ring will seal itself.

FIGURE 20-1: LOADING THE MEDIA

Table 20-1:

Carbon media quantity per model

Carbon model I. Gravel 1/16 x 1/8 II. Gravel 1/4 x 1/8 III. Carbon

DC-2162 1 CF (100 lbs) N/A (0) 6 CF (165 lbs)

DC-2472 1 CF (100 lbs) 1 CF (100 lbs) 8 CF (220 lbs)

DC-3072 2 CF (200 lbs) 2 CF (200 lbs) 12.5 CF (344 lbs)

21 DRISTEEM PRE-TREATMENT SYSTEMS INSTALLATION, OPERATION, AND MAINTENANCE MANUAL

Loading the water softener media

OPERATION

LOADING THE WATER SOFTENER MEDIA

1. Place each resin tank on a level, solid surface in the correct position for installation, taking note of correct ALT A and ALT B tank positions. Lift the riser tube from the tank, keeping the attached hub within the opening of the tank.

Within the tank, assemble the laterals onto the hub, twisting each lateral into the hub to lock securely. Gently lower the assembly to the bottom of the tank. The top of the riser tube should be about level with the top of the tank. (See Figure 20-1).

2. The “riser tube” inside the media/resin tank delivers treated water to your control valve. It will need to be temporarily covered with tape on the top end to prevent anything from falling down inside the tube during loading.

3. Step back and look at the tank to make sure it is standing straight, and not tilted. The black base on the bottom of the tank should also be straightened before filling the tank. If your tank is tilted, simply pick up the tank 2-3 inches off the floor and drop it gently (but firmly) down, favoring the side of the base that needs to be adjusted.

4. Before loading the media, fill the tank with 2-3 feet of water (or 1/3 full, depending on the tank size), to soften the fall of the rocks and prevent damage to the distributor. To load the media, use a funnel in the top of the media tank with the riser tube still inside. Make sure the riser tube is covered with tape to keep media out.

5. Scoop the media into the funnel, slowly letting it fall down inside the media tank around the riser tube. Fill the tank with the media provided, pouring the media in the following order (1st will end up on the bottom of the tank, last will end up at the top of the tank, etc.). Note: The tank will be approximately ½ - 2/3 full after loading is complete. Refer to Table 21-1 for the proper quantities of each media.

I. Gravel – YMGRVL11618 – 1 CF (100 lbs.) per bag

II. Gravel ¼” × 1/8” – YMGRVL1418 – 0.5 CF (50 lbs) per bag (not used in DC-2162)

III. Resin - CGS - 1CF (50 lbs) per bag

6. Remove the funnel from the top of the tank, and the tape from the end of the riser tube. Brush any loose media or resin off the top opening of the tank.

7. The bottom of the control valve has an opening with O-rings inside; lubricate the O-ring with a non-petroleum based lubricant. Position the valve over the top of the media tank, making sure the top of the riser tube inserts inside the opening in the bottom of the valve.

8. Screw the valve down into the media tank. Another person should hold the tank as the valve is being snugly tightened onto the tank. Do not over-tighten. Tighten until snug, tighten a bit more, then Stop. The large o-ring will seal itself.

Table 21-1:

Water softener resin and media quantity per model

Water softener model I. Gravel 1/16 x 1/8 II. Gravel 1/4 x 1/8 III. Softening resin (per tank)

WS-2162 1 CF (100 lbs) N/A (0) 6 CF (300 lbs)

WS-2472 1 CF (100 lbs) 1 CF (100 lbs) 8 CF (400 lbs)

WS-3072 2 CF (200 lbs) 2 CF (200 lbs) 12.5 CF (638 lbs)

22 DRISTEEM PRE-TREATMENT SYSTEMS INSTALLATION, OPERATION, AND MAINTENANCE MANUAL

MAINTENANCE

DECHLORINATOR

1. Visually inspect components for leaks or breakage.

2. Monthly, have a water sample taken after dechlorinator to check for chlorine. If 2 ppm or greater, replace carbon media.

WATER SOFTENER

1. Check brine tank salt level at least weekly. Maintain salt level above the half-full mark at all times.

Note: �DriSteem recommends using pulverized salt because it dissolves easily.

2. Visually inspect all components for leaks or breakage.

3. Annually, have a water sample taken downstream from water softener to check for hardness. If water hardness is 15 ppm or greater, make sure there is salt in brine tank. If there is salt, and water hardness if 15 ppm or greater, contact DriSteem for water softener resin replacement.

Components

23 DRISTEEM PRE-TREATMENT SYSTEMS INSTALLATION, OPERATION, AND MAINTENANCE MANUAL

Troubleshooting

MAINTENANCE

Table 23-1:

Troubleshooting

Issue Possible Cause Solution

1. No display. No power at electric outlet. Repair outlet or use working outlet.

Control valve power adapter not plugged into outlet or power cord end not connected to PC board connection.

Plug power adapter into outlet or connect power cord end to PC board connection.

Improper power supply. Verify proper voltage is being delivered to PC board.

Poor connection between POD connector and PC board.

Check connector on POD, possible broken wire or terminal pin not inserted properly in connector. Clean pins on PC board by plugging & unplugging the POD connector a few times to remove excess protective coating.

Defective power adapter. Replace power adapter.

Defective PC board. Replace PC board.

2. Does not display correct time of day.

Power Adapter plugged into electric outlet controlled by light switch.

Use uninterrupted outlet.

Tripped breaker switch and/or tripped GFI. Reset breaker switch and/ or GFI switch.

Power outage. Reset time of day.

Defective PC board. Replace PC board.

3. Display does not indicate that water is flowing. Refer to user instructions for how the display indicates water is flowing.

Bypass/ isolation valve in bypass position. Turn bypass/ isolation handles to place in service position.

Meter is not connected to meter connection on PC board.

Connect meter to three pin connection labeled FLOW on PC board.

Restricted/ stalled meter turbine. Remove meter and check for rotation or foreign material.

Meter wire not installed securely into three pin connector.

Verify meter cable wires are installed securely into three pin connector labeled FLOW.

Defective meter. Replace meter

Defective PC board. Replace PC board.

4. Control valve regenerates at wrong time of day.

Power outage. Reset time of day.

Time of day not set correctly. Reset to correct time of day.

Time of regeneration set incorrectly. Reset regeneration time.

Control valve set at “on 0” (immediate regeneration). Check programming setting and reset to dEL (for a delayed regen time)

5. Time of day flashes on and off. Power outage. Reset time of day.

6. Control valve does not regenerate automatically when the REGEN button is depressed and held.

Broken drive gear or drive cap assembly. Replace drive gear or drive cap assembly. Contact Dristeem technical support.

Defective PC board. Replace PC board.

For the case of systems, another unit in regen would not allow another unit to go into regeneration.

Wait for unit in regeneration to finish.

24 DRISTEEM PRE-TREATMENT SYSTEMS INSTALLATION, OPERATION, AND MAINTENANCE MANUAL

MAINTENANCE

Table 24-1:

Troubleshooting

Issue Possible Cause Solution

7. Control valve does not regenerate automatically but does when the REGEN button is depressed and held.

Bypass/ isolation valves in bypass position. Turn bypass/ isolation valves handles to place in service position.

Meter is not connected to meter connection on PC board.

Connect meter to three pin connection labeled FLOW on PC board.

Restricted/ stalled meter turbine. Remove meter and check for rotation or foreign material.

Incorrect programming. Check for programming error.

Meter wire not installed securely into three pin connector.

Verify meter cable wires are installed securely into three pin connector labeled FLOW.

Defective meter. Replace meter.

Defective PC board. Replace PC board.

8. Hard or untreated water is being delivered.

Check water quality directly at unit outlet.

Water quality is good

• Bypass/ isolation valves are open or faulty

External bypass leak

• Fully close bypass/ isolation valves or replace

Water quality is poor

•Damaged seal/stack assembly
•Faulty riser tube or seal
•Control valve body type and piston type mix

matched

Internal bypass leak

•Replace seal/stack assembly
•Verify seal placement & engagement with riser
•Verify proper control valve body type and piston type

match

Media is exhausted, water quality is poor

• Higher than anticipated water usage

•Meter not registering
•No regenerant or low level of regenerant in

regenerant tank

•Control fails to draw in regenerant
•Water quality fluctuation
•Fouled media bed

No internal leaks

• Check program settings or diagnostics for abnormal water usage

•See Troubleshooting Guide #3
•Check refill setting in programming. Check refill flow

control for restrictions or debris and clean or replace, check refill flow control rate for proper fill time.

•Refer to Troubleshooting Guide # 12
•Test water and adjust program values accordingly
•Replace media bed

9. Control valve uses too much regenerant.

Improper refill setting or refill fill flow control is not sized properly

Check refill setting and check refill flow control for proper refill rate.

Improper program settings Check program setting to make sure they are specific to the water quality and application needs.

Control valve regenerates frequently Check for leaking fixtures that may be exhausting capacity or system is undersized.

10. Residual regenerant being delivered to service.

Low water pressure Check incoming water pressure – water pressure must remain at minimum of 25 psi.

Plugged, fouled, or incorrect injector size Inspect and clean or replace injector, or replace injector with correct size for the application.

Restricted drain line Check drain line for restrictions or debris and clean.

25 DRISTEEM PRE-TREATMENT SYSTEMS INSTALLATION, OPERATION, AND MAINTENANCE MANUAL

MAINTENANCE

Table 25-1:

Troubleshooting

Issue Possible Cause Solution

11. Excessive water in regenerant tank

Tank is being overfilled

•Improper program settings
•Missing refill flow controller

Excess from fill cycle

•Verify program settings
•Visual inspection / measure volume output into container

Previous regenerant is not being drawn out See Troubleshooting Guide #12

12. Control valve fails to draw in regenerant

Injector is plugged Remove injector and clean or replace

Faulty regenerant piston Replace regenerant piston

Regenerant line connection leak Inspect regenerant line for air leak

Drain line restriction or debris cause…