This is a Questions and Answers document (FA487726QA083) dated May 11, 2026, addressing inquiries from contractors regarding an Engine Room Reflooring project. The project involves reflooring approximately 2,200 square feet of an existing engine room with a damaged epoxy coating that requires removal prior to surface preparation and application of a new coating system. The work is classified as an existing tenant improvement, and contractors have discretion on topcoat color, finish selection, and whether to fill or leave joints open, provided all Performance Work Statement standards are met. The performance period runs from June 1st through August 31st following contract award.

The contract will be issued on SF1449 and is subject to FAR 52.219-14 Limitations on Subcontracting with a 50 percent requirement. No pre-quote site visit will be conducted. Contractors must assess the concrete substrate condition, crack and joint repair requirements, and confirm field dimensions based on provided documentation, which includes photographic evidence of the existing damaged floor conditions. The document clarifies that this is a service contract for existing facility improvement rather than new construction.

View the file

Other files

File Type Posted
Provisions and Clauses.pdf PDF
COMBO - RFQ FA487726QA083.pdf PDF
PWS - Engine Room Reflooring.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers for Engine Room Reflooring May 11, 2026

FA487726QA083

Q1. Is a site visit available prior to the quote due date? If so, can one be scheduled? A site visit is necessary to accurately assess the condition of the existing concrete substrate, identify any areas requiring significant crack or joint repair, and confirm field dimensions.

A1: A site visit will not be conducted at this time.

Q2. What is the current condition of the existing floor surface—specifically, is there any existing coating, paint, or sealant that will require removal prior to surface prep?

A2: There is currently an existing epoxy coating that is damaged and requires removal.

Q3. What is the required period of performance/expected completion timeframe from contract award?

A3: June 1st to August 31st

Q4. Will FAR 52.219-14, Limitations on Subcontracting, apply to this contract? If so, please confirm the applicable percentage requirement.

A4: Yes, 50%

Q5. Is there a specific color or finish requirement for the topcoat, or is the coating system selection at the contractor's discretion provided all PWS performance standards are met?

A5: Contractor’s discretion.

Q6: And will there be a SF1442 or other solicitation page? Or is this going out as a service contract?

A6: SF1449.

Q7: Is this a new construction project or existing tenant improvement?

A7: Existing Tenant Improvement.

Q8: Is the concrete currently bare or has an existining finished floor?

A8: There is an existing damaged surface.

Q9: Are the joints to be filled in or left open?

A9: Contractors discretion.

Q10: Is it only 2200 square feet?

A10: Yes