Solicitation Amendment FA487720R00290001 SF 30.pdf
PDF 524 KB Posted
- Attached to
- Sprinkler and Riser Replacement Federal contract opportunity
- Solicitation number
- FA487720R0029
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| DMAFB Base Standard Fire Riser.pdf | ||
| SOW 1 June 2020.pdf | ||
| RFIs 2 June 2020.docx | DOCX document | |
| Template of Contractor EAL.xls | XLS spreadsheet | |
| AZ20200032.txt | TXT text file | |
| AF 3052.xlsx | XLSX spreadsheet | |
| AF 66.xlsx | XLSX spreadsheet | |
| Statement of Work 9 Dec 2019.pdf | ||
| Solicitation - FA487720R0029.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBE
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Section A - Solicitation/Contract Form
The following changes have been made:
INFORMATION FROM TO
Contract Description
This request for quote (RFQ) provides for the repair of Facility 3219. Contractor will replace all the sprinkler heads in Fac 3219 comply with NFPA 13 standards IAW with SOW dated 9 Dec 2019. The contractor will also repair and bring the fire risers up to code and in compliance with the Davis-Monthan AFB Design Compatibility Guidelines.\n\nThis project is 100% set-aside for small business concerns.\n\nIn accordance with FAR 36.204 and DFARS 236.204 the anticipated magnitude of this contract is between $25,000 and $100,000. \n\nThe Government plans to award a contract resulting from this solicitation IAW FAR 13.106-2 to the responsible offeror whose quote conforms to the solicitation that will be most advantageous to the Government based on price and past performance.
\n\nSite Visit Info\nRSVP for Site Visit by: 0900 Arizona Time, 21 May 2020 via email to ling.lin.1@us.
af.mil by completing EAL template (Attached), provide information s requested in EAL.\nSite Visit Date: 0900 Arizona Time, 27 May 2020. All visitors shall arrive prior to the site visit time to obtain the visitor pass.
\nLocation: 3180 S Craycroft rd, DM, Arizona, 85707\n\nAll Questions are due 0900 Arizona Time, 29 May 2020 via email to ling.lin.1@us.af.mil\nAll Quotes are due 0900 Arizona Time, 5 June 2020 via email to ling.lin.1@us.af.mil AND mathew.st_thomas@us.af.
mil\nPlease see Clauses 52.236-27 Site Visit (Construction).\n*** DUE TO CONVID 19 SITE
VISITS ARE BEING CONDUCTED BY
APPOINTMENT ONLY***
This request for quote (RFQ) provides for the repair of Facility 3219 and 3218. Contractor will replace all the sprinkler heads in Fac 3219 and Fac 3218 comply with NFPA 13 standards IAW with SOW dated 1 June 2020.
The contractor will also repair and bring the fire risers up to code and in compliance with the Davis-Monthan AFB Design Compatibility Guidelines.\n\nThis project is 100% set-aside for small business concerns.\n\nIn accordance with FAR 36.204 and DFARS 236.204 the anticipated magnitude of this contract is between $25,000 and $100,000. \n\nThe Government plans to award a contract resulting from this solicitation IAW FAR 13.106-2 to the responsible offeror whose quote conforms to the solicitation that will be most advantageous to the Government based on price and past performance.
\n\nSite Visit Info\nRSVP for Site Visit by: 0900 Arizona Time, 21 May 2020 via email to ling.lin.1@us.af.mil by completing EAL template (Attached), provide information s requested in EAL.\nSite Visit Date: 0900 Arizona Time, 27 May 2020. All visitors shall arrive prior to the site visit time to obtain the visitor pass. \nLocation:
3180 S Craycroft rd, DM, Arizona, 85707\n\nAll Questions are due 0900 Arizona Time, 29 May 2020 via email to ling.lin.1@us.af.mil\nAll Quotes are due 0900 Arizona Time, 5 June 2020 via email to ling.lin.1@us.af.
mil AND mathew.st_thomas@us.af.mil\nPlease see Clauses 52.236-27 Site Visit (Construction).\n*** DUE
TO CONVID 19 SITE VISITS ARE BEING
CONDUCTED BY APPOINTMENT ONLY***
Section B - Supplies or Services & Prices or Costs
The following CLIN(s) / SLIN(s) were modified:
0001 - Replace Risers in Fac 3218 IAW SOW Dates 1 June 2020
INFORMATION FROM TO
CIN 00000000000005152420
Description Replace Risers in Fac 3219 IAW SOW Dates 9 Dec 2019 Replace Risers in Fac 3218 IAW SOW Dates 1 June 2020
0002 - Replace Sprinklers in Fac 3219 and 3218 IAW SOW Dates 1 June 2020
INFORMATION FROM TO
CIN 00000000000005152421
Description Replace Sprinklers in Fac 3219 IAW SOW Dates 9 Dec 2019
Replace Sprinklers in Fac 3219 and 3218 IAW SOW Dates 1 June 2020
Section C - Specification/SOW/SOO/ORD
FA487720R00290001
The Requirements text has been modified to:
This request for quote (RFQ) provides for the repair of Facility 3219 and 3218. Contractor will replace all the SPRINKLER HEADS (CLIN0002) in Fac 3219 and 3218 comply with NFPA 13 standards IAW SOW dated 1 June 2020. The contractor will also repair and bring the FIRE RISERS (CLIN0001) up to code and in compliance with the Davis-Monthan AFB Design Compatibility Guidelines.
Section J - List of Attachments
The following attachments were added:
DMAFB Base Standard Fire Riser SOW 1 June 2020
The following attachments were deleted:
Statement of Work 9 Dec 2019
Miscellaneous text in this section has been modified to:
As-Builds 3219 (1); As-Builds 3219 (2)
FA487720R00290001
| IDCode: |
| Page: 1 |
| Pages: 3 |
| AmendNo: 0001 |
| EffDate: 6/2/2020 |
| ReqNo: F1P35A0016AW01 |
| ProjNo: F1P35A0016AW01 |
| IssCode: FA4877 |
| AdmCode: |
| IssuedBy: FA4877 355 CONS PK |
3180 S CRAYCROFT RD BLDG 2525
CP 520 228 3131
DAVIS MONTHAN AFB, AZ 85707-3522
United States Ling Lin, Telephone: -5202284838 Email: ling.lin.1@us.af.mil
| AdminBy: |
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: FA487720R0029 |
| SolDate: 5/19/2020 |
| AwardChg: |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: |
| OffrNoEx: 1 |
| NoCopies: 1 |
| ApprData: See Section G |
| ChgeOrd: |
| ChgeOrder: |
| Modify: |
| SuppAgre: |
| SuppAuth: |
| ModOthr: |
| OthrSpec: |
| NoReq: 1 |
| Require: |
| Copies: |
| Descript: The purpose of this amendment is to: |
1) upload RFIs, dated on 2 June 2020
2) updated SOW, dated on 1 June 2020
3) All other terms and conditions remains.
| ContNameTitle: |
| CoNameTitle: David Harrison |
Email: david.harrison.2@us.af.mil Telephone: 520-228-4673
| ContDate: |
| CODate: |
File details come from the government source that posted it. Updated .