AF 3052.xlsx
XLSX spreadsheet 38 KB Posted
- Attached to
- Sprinkler and Riser Replacement Federal contract opportunity
- Solicitation number
- FA487720R0029
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SOW 1 June 2020.pdf | ||
| RFIs 2 June 2020.docx | DOCX document | |
| DMAFB Base Standard Fire Riser.pdf | ||
| Solicitation Amendment FA487720R00290001 SF 30.pdf | ||
| AZ20200032.txt | TXT text file | |
| AF 66.xlsx | XLSX spreadsheet | |
| Statement of Work 9 Dec 2019.pdf | ||
| Solicitation - FA487720R0029.pdf | ||
| Template of Contractor EAL.xls | XLS spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AF Form 3052
| CONSTRUCTION COST ESTIMATE BREAKDOWN | AE Notes: | ||||||||||
| CONTRACTOR | ADDRESS | 1. Only edit the items in blue. | |||||||||
| CONTRACT FOR(WORK TO BE PERFORMED) | Sprinkler and Riser Replacement, Fac 3219 | PROPOSED TOTAL CONTRACT PRICE | 2. The costs references are from the Means 98 Facilities Construction Cost Data book. | ||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | FBNV XXXXXX | WORK LOCATION | DAVIS-MONTHAN AFB, AZ 85707 | |||||||
| LINE | UNIT OF | MATERIAL COST | LABOR COST | DIRECT | LINE | ||||||
| NO. | ITEM | MEASURE | QUANTITY | UNIT | TOTAL | MANHOURS | RATE | TOTAL | COSTS | TOTAL | |
| SUMMARY | |||||||||||
| 1 | SUBTOTAL GENERAL CONDITIONS | 0 | 0 | 0 | 0 | ||||||
| 2 | SUBTOTAL ARCHITECTURAL | 0 | 0 | 0 | 0 | ||||||
| 3 | SUBTOTAL CIVIL | 0 | 0 | 0 | 0 | ||||||
| 4 | SUBTOTAL STRUCTURAL | 0 | 0 | 0 | 0 | ||||||
| 5 | SUBTOTAL MECHANICAL | 0 | 0 | 0 | 0 | ||||||
| 6 | SUBTOTAL PLUMBING | 0 | 0 | 0 | 0 | ||||||
| 7 | SUBTOTAL ELECTRICAL | 0 | 0 | 0 | 0 |
| LINE TOTALS | 0 | 0 | 0 | 0 | |
| OVERHEAD (15%) | 0 | Standard base overhead markup; may be changed with justification. See 010-060. | |||
| SUBTOTAL | 0 | ||||
| PROFIT (10%) | 0 | Standard base profit markup; may be changed with justification. Taken on the LINE TOTAL, not the SUBTOTAL of the LINE TOTAL plus OVERHEAD markup. | |||
| SUBTOTAL | 0 | ||||
| TAX (3.97%) | 0 | Standard AZ sales tax markup. | |||
| BOND (2.0%) | 0 | Standard base bond markup; may be changed with justification. See 010-068. | |||
| TOTAL PROJECT PRICE | 0 |
| DATE: | FIRM NAME: |
| TITLE: | BY: |
| GENERAL CONDITIONS | |||||
| 1 | A | ||||
| 2 | B | ||||
| 3 | C | ||||
| 4 | D | ||||
| 5 | E | ||||
| 6 | F | ||||
| 7 | G | ||||
| 8 | H | ||||
| 9 | I | ||||
| 10 | J | ||||
| 11 | K | ||||
| 12 | L | ||||
| SUBTOTAL THIS PAGE | 0 | 0 | 0 | 0 |
| SUBTOTAL ALL PAGES | 0 | 0 | 0 | 0 | |
| LABOR BURDEN (XX%) | 0 | Labor Burden taken at 21% for the purposes of this worksheet. The percentage can vary based on the estimator's experience and judgement. |
| SUBTOTAL GENERAL CONDITIONS | 0 | 0 | 0 | 0 | ||
| ARCHITECTURAL | Include demolition and construction activities. | |||||
| 1 | A | |||||
| 2 | B | |||||
| 3 | C | |||||
| 4 | D | |||||
| 5 | E | |||||
| 6 | F | |||||
| 7 | G | |||||
| 8 | H | |||||
| 9 | I | |||||
| 10 | J | |||||
| 11 | K | |||||
| 12 | L | |||||
| 13 | M | |||||
| SUBTOTAL THIS PAGE | 0 | 0 | 0 | 0 | ||
| LABOR BURDEN (XX%) | 0 | Labor Burden taken at 21% for the purposes of this worksheet. The percentage can vary based on the estimator's experience and judgement. |
| SUBTOTAL ARCHITECTURAL | 0 | 0 | 0 | 0 | ||
| CIVIL | Include demolition and construction activities. | |||||
| 1 | A | |||||
| 2 | B | |||||
| 3 | C | |||||
| 4 | D | |||||
| 5 | E | |||||
| 6 | F | |||||
| 7 | G | |||||
| 8 | H | |||||
| 9 | I | |||||
| 10 | J | |||||
| 11 | K | |||||
| 12 | L | |||||
| 13 | M | |||||
| SUBTOTAL THIS PAGE | 0 | 0 | 0 | 0 | ||
| LABOR BURDEN (XX%) | 0 | Labor Burden taken at 21% for the purposes of this worksheet. The percentage can vary based on the estimator's experience and judgement. |
| SUBTOTAL CIVIL | 0 | 0 | 0 | 0 | ||
| STRUCTURAL | Include demolition and construction activities. | |||||
| 1 | A | |||||
| 2 | B | |||||
| 3 | C | |||||
| 4 | D | |||||
| 5 | E | |||||
| 6 | F | |||||
| 7 | G | |||||
| 8 | H | |||||
| 9 | I | |||||
| 10 | J | |||||
| 11 | K | |||||
| 12 | L | |||||
| 13 | M | |||||
| SUBTOTAL THIS PAGE | 0 | 0 | 0 | 0 | ||
| LABOR BURDEN (XX%) | 0 | Labor Burden taken at 21% for the purposes of this worksheet. The percentage can vary based on the estimator's experience and judgement. |
| SUBTOTAL STRUCTURAL | 0 | 0 | 0 | 0 | ||
| MECHANICAL | Include demolition and construction activities. | |||||
| 1 | A | |||||
| 2 | B | |||||
| 3 | C | |||||
| 4 | D | |||||
| 5 | E | |||||
| 6 | F | |||||
| 7 | G | |||||
| 8 | H | |||||
| 9 | I | |||||
| 10 | J | |||||
| 11 | K | |||||
| 12 | L | |||||
| 13 | M | |||||
| SUBTOTAL THIS PAGE | 0 | 0 | 0 | 0 | ||
| LABOR BURDEN (XX%) | 0 | Labor Burden taken at 21% for the purposes of this worksheet. The percentage can vary based on the estimator's experience and judgement. |
| SUBTOTAL MECHANICAL | 0 | 0 | 0 | 0 | ||
| PLUMBING | Include demolition and construction activities. | |||||
| 1 | A | |||||
| 2 | B | |||||
| 3 | C | |||||
| 4 | D | |||||
| 5 | E | |||||
| 6 | F | |||||
| 7 | G | |||||
| 8 | H | |||||
| 9 | I | |||||
| 10 | J | |||||
| 11 | K | |||||
| 12 | L | |||||
| 13 | M | |||||
| SUBTOTAL THIS PAGE | 0 | 0 | 0 | 0 | ||
| LABOR BURDEN (XX%) | 0 | Labor Burden taken at 21% for the purposes of this worksheet. The percentage can vary based on the estimator's experience and judgement. |
| SUBTOTAL PLUMBING | 0 | 0 | 0 | 0 | ||
| ELECTRICAL | Include demolition and construction activities. | |||||
| 1 | A | |||||
| 2 | B | |||||
| 3 | C | |||||
| 4 | D | |||||
| 5 | E | |||||
| 6 | F | |||||
| 7 | G | |||||
| 8 | H | |||||
| 9 | I | |||||
| 10 | J | |||||
| 11 | K | |||||
| 12 | L | |||||
| 13 | M | |||||
| SUBTOTAL THIS PAGE | 0 | 0 | 0 | 0 | ||
| LABOR BURDEN (XX%) | 0 | Labor Burden taken at 21% for the purposes of this worksheet. The percentage can vary based on the estimator's experience and judgement. |
| SUBTOTAL ELECTRICAL | 0 | 0 | 0 | 0 | |
| THIS PORTION EXPLAINS HOW TO HANDLE MULTIPLE PAGES FOR ANY DISCIPLINE. |
| WHATEVER | ||||||||||
| 1 | A | EA | 0.0 | 200.00 | 0 | 16.00 | 30.82 | 0 | 0 | 0 |
| 2 | B | SF | 0.0 | 2.10 | 0 | 0.20 | 30.82 | 0 | 0 | 0 |
| 3 | C | EA | 0.0 | 326.00 | 0 | 3.00 | 30.82 | 0 | 0 | 0 |
| 4 | D | LBS | 0.0 | 2.10 | 0 | 0.35 | 30.82 | 0 | 0 | 0 |
| 5 | E | LS | 0.0 | 250.00 | 0 | 5.00 | 30.82 | 0 | 0 | 0 |
| 6 | F | EA | 0.0 | 50.00 | 0 | 4.00 | 30.82 | 0 | 0 | 0 |
| 7 | G | LF | 0.0 | 2.10 | 0 | 0.10 | 30.82 | 0 | 0 | 0 |
| 8 | H | LF | 0.0 | 1.00 | 0 | 0.20 | 30.82 | 0 | 0 | 0 |
| 9 | I | EA | 0.0 | 14.70 | 0 | 0.50 | 30.82 | 0 | 0 | 0 |
| 10 | J | LS | 0.0 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0 | 0 |
| 11 | K | LS | 0.0 | 300.00 | 0 | 60.00 | 30.82 | 0 | 0 | 0 |
| 12 | L | LF | 0.0 | 3.75 | 0 | 0.00 | 15.00 | 0 | 0 | 0 |
| 13 | M | EA | 0.0 | 55.00 | 0 | 0.47 | 27.66 | 0 | 0 | 0 |
| SUBTOTAL THIS PAGE | 0 | 0 | 0 | 0 | ||||||
| WHATEVER (continued) | ||||||||||
| 14 | N | EA | 0.0 | 200.00 | 0 | 16.00 | 30.82 | 0 | 0 | 0 |
| 15 | O | SF | 0.0 | 2.10 | 0 | 0.20 | 30.82 | 0 | 0 | 0 |
| 16 | P | EA | 0.0 | 326.00 | 0 | 3.00 | 30.82 | 0 | 0 | 0 |
| 17 | Q | LBS | 0.0 | 2.10 | 0 | 0.35 | 30.82 | 0 | 0 | 0 |
| 18 | R | LS | 0.0 | 250.00 | 0 | 5.00 | 30.82 | 0 | 0 | 0 |
| 19 | S | EA | 0.0 | 50.00 | 0 | 4.00 | 30.82 | 0 | 0 | 0 |
| 20 | T | LF | 0.0 | 2.10 | 0 | 0.10 | 30.82 | 0 | 0 | 0 |
| 21 | U | LF | 0.0 | 1.00 | 0 | 0.20 | 30.82 | 0 | 0 | 0 |
| 22 | V | EA | 0.0 | 14.70 | 0 | 0.50 | 30.82 | 0 | 0 | 0 |
| 23 | W | LS | 0.0 | 0.00 | 0 | 0.00 | 0.00 | 0 | 0 | 0 |
| 24 | X | LS | 0.0 | 300.00 | 0 | 60.00 | 30.82 | 0 | 0 | 0 |
| 25 | Y | LF | 0.0 | 3.75 | 0 | 0.00 | 15.00 | 0 | 0 | 0 |
| 26 | Z | EA | 0.0 | 55.00 | 0 | 0.47 | 27.66 | 0 | 0 | 0 |
| SUBTOTAL THIS PAGE | 0 | 0 | 0 | 0 |
SUBTOTAL PREVIOUS PAGE(S) 0 0 0 0
| SUBTOTAL ALL PAGES | 0 | 0 | 0 | 0 | |
| LABOR BURDEN (XX%) | 0 | Labor Burden taken at 21% for the purposes of this worksheet. The percentage can vary based on the estimator's experience and judgement. |
SUBTOTAL WHATEVER 0 0 0 0
| AF Form 3052 (Computer Generated) | &"Univers (WN)"&8 |
| &10*FOR OFFICIAL USE ONLY* | &"Univers (WN)"&8 |
&10PAGE &P OF &N
Ktr's Blank
| CONSTRUCTION COST ESTIMATE BREAKDOWN | ||||||||||
| CONTRACTOR | ADDRESS | |||||||||
| CONTRACT FOR(WORK TO BE PERFORMED) | TITLE OF PROJECT | PROPOSED TOTAL CONTRACT PRICE | ||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | FBNV XXXXXX | WORK LOCATION | DAVIS-MONTHAN AFB, AZ 85707 | ||||||
| LINE | UNIT OF | MATERIAL COST | LABOR COST | DIRECT | LINE | |||||
| NO. | ITEM | MEASURE | QUANTITY | UNIT | TOTAL | MANHOURS | RATE | TOTAL | COSTS | TOTAL |
| SUMMARY | ||||||||||
| 1 | SUBTOTAL GENERAL CONDITIONS | |||||||||
| 2 | SUBTOTAL ARCHITECTURAL | |||||||||
| 3 | SUBTOTAL CIVIL | |||||||||
| 4 | SUBTOTAL STRUCTURAL | |||||||||
| 5 | SUBTOTAL MECHANICAL | |||||||||
| 6 | SUBTOTAL PLUMBING | |||||||||
| 7 | SUBTOTAL ELECTRICAL |
| LINE TOTALS |
| OVERHEAD (___%) |
| SUBTOTAL |
| PROFIT (___%) |
| SUBTOTAL |
| TAX (5.6% of 65%) |
| BOND (___%) |
| TOTAL PROJECT PRICE |
| DATE: | FIRM NAME: |
| TITLE: | BY: |
| GENERAL CONDITIONS | Standard base format. Don't forget to include cost adjustment factors for such requirements as: cutting/patching to match existing, dust protection and protection of existing, working space and material handling limitations, shift work, overtime, etc. Include safety measures, temporary controls, etc., as applicable. See 010-032. | |||
| 1 | Field Office (expenses+rent) | MO | 1.0 | UNIT MATERIAL COST = 010-034-0100 thru 0160, plus 015-904-0350, which includes office equipment rental, office supplies, telephone bill (w/o initial charge), lights & HVAC, trailer rental, bottled water ($50/month), and postage ($40/month) costs, respectively. DIRECT COSTS = $30 for average 20 mile roundtrip delivery/pickup + $300 telephone initial charge costs. |
| 2 | Field Clerk | WK | 1.0 | LABOR COST RATE = 010-036-0100 w/o per diem (usually local hire). |
| 3 | General Purpose Laborer | WK | 1.0 | LABOR COST RATE = 010-036-0160 w/o per diem (usually local hire). |
| 4 | Project Manager | WK | 1.0 | LABOR COST RATE = 010-036-0200. DIRECT COSTS = $150 per week for per diem costs. |
| 5 | Superintendent | WK | 1.0 | LABOR COST RATE = 010-036-0260. DIRECT COSTS = $150 per week for per diem costs. |
| 6 | Builder's Insurance | JOB | 1.0 | DIRECT COSTS = 010-040-0200 TOTAL INCL O&P x Estimated Project Construction Costs. |
| 7 | Permits | JOB | 1.0 | DIRECT COSTS = 010-070-0010 TOTAL INCL O&P x Estimated Project Construction Costs + permit fees from Section 01010. |
| 8 | Small Tools | JOB | 1.0 | DIRECT COSTS = 010-082-0010 TOTAL INCL O&P x Estimated Project Construction Costs. |
| 9 | Scheduling | JOB | 1.0 | DIRECT COSTS = 013-104-0600 TOTAL INCL O&P x Estimated Project Construction Costs. |
| 10 | Surveying (3-man crew) | DAY | 2.0 | LABOR COST RATE = 013-306-1200 TOTAL INCL O&P (subcontractor's cost) with a 2 day minimum. |
| 11 | Shop Drawings/Submittals | LS | 1.0 | LABOR COST RATE = estimator's experience and judgement. |
| 12 | Construction Photos | DAY | 1.0 | UNIT MATERIAL COST = 013-804-0200 & 1720. |
| 13 | Testing Lab Service | JOB | 1.0 | DIRECT COSTS = 014-108-0015, to be increased or decreased per the estimator's judgement and experience. |
| 14 | Traffic Cones | EA | 1.0 | UNIT MATERIAL COST = 015-302-0800. |
| 15 | Construction Fence | LF | 1.0 | 015-304-0200. LABOR COST RATE should reflect the current wage labor rates. |
| 16 | Project Sign | SF | 32.0 | UNIT MATERIAL COST = 015-804-0010. DIRECT COSTS = $50 based on estimator's experience and judgement. |
| 17 | Storage Building | MO | 1.0 | UNIT MATERIAL COST = 015-904-1350. DIRECT COSTS = $30 for average 20 mile roundtrip delivery/pickup. |
| 18 | Portable Toilets | WK | 1.0 | UNIT MATERIAL COST = 016-420-6410. DIRECT COSTS = $8 per day for cleaning (assumed once per week). |
| SUBTOTAL THIS PAGE | ||||
| GENERAL CONDITIONS (continued) | ||||
| 19 | Truck -Project Manager | WK | 1.0 | UNIT MATERIAL COST = 016-420-7100. DIRECT COSTS = $125.50 per day for miscellaneous costs (assumed once per week). |
| 20 | Truck - Superintendent | WK | 1.0 | UNIT MATERIAL COST = 016-420-7100. DIRECT COSTS = $125.50 per day for miscellaneous costs (assumed once per week). |
| 21 | Cleanup (after job completion) | JOB | 1.0 | DIRECT COSTS = 017-104-0010 x Estimated Project Construction Costs. |
| 22 | Cleanup (final floor area) | MSF | 1.0 | 017-104-0100. LABOR COST RATE should reflect the current wage labor rates. |
| 23 | Dumpsters | WK | 1.0 | DIRECT COSTS = 020-620-0910/0920/0930 for 7 days/0950 for 4 tons (non-hazardous) or 10 CY capacity TOTAL INCL O&P (subcontractor's cost). |
| 24 | Equipment Mobilization | EA | 1.0 | DIRECT COSTS = 022-274-0020 + 022-274-1100 TOTAL INCL O&P (subcontractor's costs). |
| 25 | AutoCAD Service | LS | 1.0 | DIRECT COSTS = estimator's experience and judgement. |
| 26 | Asbestos Removal | JOB | 1.0 | DIRECT COSTS = abatement subcontractor's costs including subcontractor's overhead and profit. |
| 27 | Asbestos Dumping Fees | TON | 1.0 | DIRECT COSTS = Tucson rates, not including hauler's direct costs, overhead or profit. |
| 28 | Lead Paint Removal | JOB | 1.0 | DIRECT COSTS = estimator's judgement of abatement subcontractor's costs including subcontractor's overhead and profit. See Division 099-902 for abatement of specific materials. |
| 29 | Contractor Mobilization | JOB | 1.0 | DIRECT COSTS = Prime Contractor's justifiable mobilization costs x Estimated Project Construction Costs. |
| 30 | Safety Items | JOB | 1.0 | DIRECT COSTS = estimator's judgement of safety items such as fire extinguishers (105-225-2080 @ ~$75/each), hard hats (~$10/each), and first aid kit (~$30/each). |
| SUBTOTAL THIS PAGE |
SUBTOTAL PREVIOUS PAGE(S)
| SUBTOTAL ALL PAGES |
| LABOR BURDEN (___%) |
| SUBTOTAL GENERAL CONDITIONS | |
| ARCHITECTURAL | |
| 1 | |
| 2 | |
| 3 | |
| 4 | |
| 5 | |
| 6 | |
| 7 | |
| 8 | |
| 9 | |
| 10 | |
| 11 | |
| 12 | |
| 13 | |
| SUBTOTAL THIS PAGE | |
| LABOR BURDEN (___%) |
| SUBTOTAL ARCHITECTURAL | |
| CIVIL | |
| 1 | |
| 2 | |
| 3 | |
| 4 | |
| 5 | |
| 6 | |
| 7 | |
| 8 | |
| 9 | |
| 10 | |
| 11 | |
| 12 | |
| 13 | |
| SUBTOTAL THIS PAGE | |
| LABOR BURDEN (___%) |
| SUBTOTAL CIVIL | |
| STRUCTURAL | |
| 1 | |
| 2 | |
| 3 | |
| 4 | |
| 5 | |
| 6 | |
| 7 | |
| 8 | |
| 9 | |
| 10 | |
| 11 | |
| 12 | |
| 13 | |
| SUBTOTAL THIS PAGE | |
| LABOR BURDEN (___%) |
| SUBTOTAL STRUCTURAL | |
| MECHANICAL | |
| 1 | |
| 2 | |
| 3 | |
| 4 | |
| 5 | |
| 6 | |
| 7 | |
| 8 | |
| 9 | |
| 10 | |
| 11 | |
| 12 | |
| 13 | |
| SUBTOTAL THIS PAGE | |
| LABOR BURDEN (___%) |
| SUBTOTAL MECHANICAL | |
| PLUMBING | |
| 1 | |
| 2 | |
| 3 | |
| 4 | |
| 5 | |
| 6 | |
| 7 | |
| 8 | |
| 9 | |
| 10 | |
| 11 | |
| 12 | |
| 13 | |
| SUBTOTAL THIS PAGE | |
| LABOR BURDEN (___%) |
| SUBTOTAL PLUMBING | |
| ELECTRICAL | |
| 1 | |
| 2 | |
| 3 | |
| 4 | |
| 5 | |
| 6 | |
| 7 | |
| 8 | |
| 9 | |
| 10 | |
| 11 | |
| 12 | |
| 13 | |
| SUBTOTAL THIS PAGE | |
| LABOR BURDEN (___%) |
SUBTOTAL ELECTRICAL
| AF Form 3052 (Computer Generated) | &"Univers (WN)"&8 |
| &10*FOR OFFICIAL USE ONLY* | &"Univers (WN)"&8 |
&10PAGE &P OF &N