RFIs 2 June 2020.docx
DOCX document 14 KB Posted
- Attached to
- Sprinkler and Riser Replacement Federal contract opportunity
- Solicitation number
- FA487720R0029
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SOW 1 June 2020.pdf | ||
| DMAFB Base Standard Fire Riser.pdf | ||
| Solicitation Amendment FA487720R00290001 SF 30.pdf | ||
| AF 66.xlsx | XLSX spreadsheet | |
| Statement of Work 9 Dec 2019.pdf | ||
| AZ20200032.txt | TXT text file | |
| AF 3052.xlsx | XLSX spreadsheet | |
| Solicitation - FA487720R0029.pdf | ||
| Template of Contractor EAL.xls | XLS spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. During the pre-bid meeting it was mentioned that the proposal is to include repairing and/or bringing the existing riser up to DM AFB Design Compatibility Guidelines. We found a copy of the current DMG but there isn’t any information about the details of the riser. Are you looking to change the unit in its entirety or just replace the components with new? We just need a clearer direction so we know how to bid this scope. Is there a detail you can provide?
0. User made the following comments: Gauge is missing prior to double check assembly. Piping before backflow preventer isn’t approved for potable water. Backflow preventer is too high to perform maintenance. Code requires installed less than 5’ from the ground. There is no forward flow test connection for the backflow preventer. Does not appear to be a #1 test cock on the device. Requesting entire riser to replaces with AMES 2000 SS to match the rest of the installation and to keep maintenance uniform.
1. If the facility will be occupied during the repairs, how many rooms will you allow us to work in in a given day?
1. Facility will remain occupied during repairs. Coordination can be made depending on estimated time needed per room.
1. Will the individual rooms be unoccupied?
2. Most likely will go the route of informing all residents of time-frames when their room is expected to be worked on. Weather the room is unoccupied or occupied cannot be guaranteed.
1. what type K-Factor the specific heads are in order to correctly replace them.
3. Fire Sprinkler schedule on the As-builds contains flow rates. Will this be enough to determine? I do not have the K-factor information.
1. It was noted that building 3218 also had pendent heads installed in it. Are we to change out these heads as well?
4. Yes please replace 3218 Sprinkler heads as well as 3219 sprinkler heads. Please see SOW dated 1 June 2020
1. Some of the existing heads have worn the ceiling and wall surface/paint away. Will we be required to repair these surfaces?
5. Yes please repair any surfaces affected by the removal and installation of new heads.