This document contains a solicitation for operation and maintenance of an Energy Management and Control System at Davis-Monthan Air Force Base, along with related questions and answers. The solicitation seeks offers for onsite monitoring and maintenance, server maintenance, overtime hours, and spare parts for the EMCS. Offerors must have an active facility security clearance of at least Secret. The period of performance is one year with four optional one-year extensions and a six-month extension. Davis-Monthan Air Force Base is seeking to contract these services to maintain controls for building energy management. The solicitation includes pricing details across multiple contract line items and option years. Questions from potential offerors are addressed relating to technical specifications, documentation access, and security clearance requirements.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Section | Description | Question/Comments | Answer |
| Supplies or |
Services and Prices/Cost CLIN Table The Solicitation indicates that CLINs 0004, 1004, 2004, 3004, 4004, and 5004 are Time and Materials and includes a ceiling of $15,000/annually. Please clarify if the Government desires the Contractor to provide a list of suggested spare parts, labor rates, or simply the ceiling amount (since parts will be approved on a T&M basis) for these CLINs? The PWS calls for a parts list that will be approved by the CO and validated annually.
Labor rates should not be necessary since prime contractor personnel associated with CLINs 0001 and 0002 are expected to be doing repairs.
Fully burdened labor rates will be necessary if additional personnel are necessary for repairs. CLIN 0005 will need to be added if this is the case.
Evaluation Factors for Award & Instrs., Conds., and Notices to
| Offerors | FAR requirements ‐ 52.219‐9 Small Business Subcontracting |
| Requirements | Please clarify if the Government has specific percentage goals or if Contractors should propose their own sub‐contracting goals in response to this Solicitation? |
Will a Contractors approved Commercial Sub‐Contracting Plan be acceptable for this Solicitation? The Government does not have specific percentage goals.
Per FAR 52.219-9(g)-A commercial plan is the preferred type of subcontracting plan for contractors furnishing commercial items. The commercial plan shall relate to the offeror’s planned subcontracting generally, for both commercial and Government business, rather than solely to the Government contract.
PWS Section 1.0 Description of Services and PWS
| Section 1.7.1 | Section 1.0 of the PWS references the DMAFB Design |
| Guide. | Can the Government provide a copy of referenced DMAFB |
| Design Guide for Contractor review? | UFC 04-10-06 is the official design guide for ICS systems along with NIST 800-82 R2. Local DM design guide is now being taken over by AFCEC and regionalized, does not reflect individual bases at this time. UFC 04-10-06 and NIST 800-82 R2 are attached. |
| PWS Section 1.0 |
Description of
| Services | Section 1.0 of the PWS references the 355 Civil Engineering Squadron Energy Management Control Systems Configuration Management Plan and |
| Contingency Plan. | Can the Government provide a copy of referenced Energy |
Management Control Systems Configuration Management Plan and Contingency Plan for Contractor review? DM Configuration Management Plan (CMP) and Contingency Plan will only be given to verified Defense Contractors on Sam.gov. If you would like to receive this plan, please send an email to 355CONS.PKBA.Services@us.af.mil with the CAGE Code and Company Name. The plans will be sent via DoD SAFE to the email address on the current SAM profile.
PWS Section 1.6 Software Updates PWS Section 1.6 states that “the contractor should provide, configure, and install updates to operational software when required, including work station, server, and network manager at no additional cost to the
| government”. | Please clarify if the Contractor can purchase the software |
| licenses under CLIN 004? | No, the licenses must be priced into CLIN 0002, 1002, 2002, 3002, 4002, and 5002. |
| PWS Section | |
| 5.1.1. | Section 5.1.1. refers to “equipment listed in the |
| appendices”. | Please clarify if the equipment listed in PWS Section 5.1.1.1 |
and 1.9.1 is the only equipment addressed by this
| Solicitation? | Yes, admin error. Appendices were removed. |
| PWS Section 1.2 |
PWS Section
| 1.7.1.1 | Section 1.2 of the PWS states “The contractor shall scan servers monthly…”. Section 1.7.1.1 of the PWS states “The contractor must provide a minimum of quarterly onsite maintenance to apply DISA STIG and benchmarks, as applicable.” | Please clarify the frequency of scan/patch/update |
| maintenance actions that the Government desires? | The frequency of scan/patch/update is as follows: monthly scan and patch within 30 days. | |
| PWS Section 1.2 |
PWS Section
1.7.1.1 It is unclear whether this existing EMCS is a closed
restricted network (ie logically isolated, no network traffic in/out of the system) or if it has connections to local dot mil or NIPRNet. Hardened/compliant PCs with VPN access could be leveraged to provide a much higher standard of maintenance at much lower cost to the Government. Please clarify if EMCS is a closed / restricted network or connected to the local .mil or NIPRNet?
Would the Government allow remote access to the EMCS (with proper credentials and safeguards) if connected? EMCS is a closed network and does not support VPN. System Policy Document (SPD) paragraph, 5.15 provides further architecture explanation. The SPD will only be given to verified Defense Contractors on Sam.gov. If you would like to receive this plan, please send an email to 355CONS.PKBA.Services@us.af.mil with the CAGE Code and Company Name. The plans will be sent via DoD SAFE to the email address on the current SAM profile.
At this time, remote access is not permitted.
| PWS Section | |
| 1.7.1.1 | Section 1.7.1.1 of the PWS states “The contractor shall |
use DM Configuration Management Plan procedures for all hardware and software changes.” Can the Government provide a copy of referenced DM Configuration Management Plan as it appears critical for all
| changes? | DM Configuration Management Plan (CMP) will only be given to verified Defense Contractors on Sam.gov. If you would like to receive this plan, please send an email to 355CONS.PKBA.Services@us.af.mil with the CAGE Code and Company Name. The plans will be sent via DoD SAFE to the email address on the current SAM profile. |
| PWS Section | |
| 1.7.1.1 | Section 1.7.1.1 of the PWS states “Any patch causing inoperability will require on‐site maintenance and |
| troubleshooting by 3rd party vendor support at no additional cost the Government.” | Can the Government please clarify whether the Contractor |
can remove the offending patch and modify the POAM per standard Risk Management Framework instead? DM Configuration Management Plan (CMP) paragraph 6.5 covers patch procedures. DM Configuration Management Plan (CMP) will only be given to verified Defense Contractors on Sam.gov. If you would like to receive this plan, please send an email to 355CONS.PKBA.Services@us.af.mil with the CAGE Code and Company Name. The plans will be sent via DoD SAFE to the email address on the current SAM profile.
Contractor can remove the offending patch and modify POAM per RMF and SPD paragraph 6.5. 3rd party vendor support may be utilized when necessary at no cost to government.
| The PWS is not entirely clear on the scope of the equipment being maintained. We are not clear if the contractor is responsible for maintaining and repairing devices at the field level (field controllers, sensors, actuators ect) or only the devices at the supervisory level (JACEs and server). | This PWS is for both. This is a full O&M contract. |
| The Niagara Server seems to be Siemens branded. Please advise if the government has access to all JACEs and server licenses or if they can request Siemens to provide the credentials to access these supervisory level devices should we win the contract. | Gov has access to all licenses. This information is covered in the SPD. The SPD will only be given to verified Defense Contractors on Sam.gov. If you would like to receive this plan, please send an email to 355CONS.PKBA.Services@us.af.mil with the CAGE Code and Company Name. The plans will be sent via DoD SAFE to the email address on the current SAM profile. |
| Please provide a description of how many JACEs are included in the facility and how many field devices are connected to each JACEs and what is the model of the field controllers. Preferably please include a BAS network layout. | Average of 1 JACE per facility, up to 150 JACE’s base wide. Field devices vary depending on facility size but 25 devises connected to a JACE is a safe average. Field Controllers i.e. IO Points are Talon, Raptor, or Predator. No BAS layout will be provided. We can provide the 5 level topology included in the ATO package. Hardware lists are embedded in the SPD. The SPD will only be given to verified Defense Contractors on Sam.gov. If you would like to receive this plan, please send an email to 355CONS.PKBA.Services@us.af.mil with the CAGE Code and Company Name. The plans will be sent via DoD SAFE to the email address on the current SAM profile. |
| Could the government consider sponsoring the apparent successful offeror for a secret clearance? or Could the government consider the HPD12 Tier 1 Clearance to be acceptable while requesting the secret clearance? | The Government has decided not to sponsor a company for an FCL but has determined that it is required for performance of the contract. If you do not have a current FCL, you may be able to get sponsored as a subcontractor. |