FA4877-17-R-A0010002_Amendment.pdf

PDF 70 KB Posted

Attached to
Repair (Sustain) Central Chiller Plant, Fac 5101
Solicitation number
FA487717RA001-Synopsis
Issued by

About this file

Amendment #2

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FBNV 16-0011

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:

A. Update Section L.7.2.6. Table L1.

B. Update Section L.8.2.5.

C. Add FAR Clause 52.228-1, Bid Guarantee.

D. See Summary of Changes for any additional information.

POC: SSgt Geoffrey Janavaris, geoffrey.janavaris@us.af.mil

1. CONTRACT ID CODE PAGE OF PAGES

J 1 12

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 10-May-2017

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA487717RA001

X 9B. DATED (SEE ITEM 11)

24-Apr-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

10-May-2017

CODE

355 CONS - FA4877

3180 S. CRAYCROFT RD

DAVIS-MONTHAN AFB AZ 85707

FA4877 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

FA487717RA001

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION I - CONTRACT CLAUSES

The following have been added by full text:

52.228-1 BID GUARANTEE (SEP 1996)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States.

The Contracting Officer will return bid guarantees, other than bid bonds, (1) to unsuccessful bidders as soon as practicable after the opening of bids, and (2) to the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.-

(c) The amount of the bid guarantee shall be 20 percent of the bid price or $3 million, whichever is less.-

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.-

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

(End of provision)

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

The following have been modified:

INSTRUCTIONS TO OFFERORS

iL.1. GENERAL INFORMATION

L.1.1. This section of the Request for Proposal (RFP) provides general guidance for preparing proposals, as well as, specific instructions on the format of the proposal. The offeror’s proposal must include all data and information requested in the RFP.

L.1.2. To assure timely and equitable evaluation of proposals; offerors must follow the instructions contained herein. Offerors are required to meet all solicitation requirements, including terms and conditions, representations and certifications, and technical requirements; in addition to, those identified as evaluation factors, subfactors, and the criteria of those subfactors.

L.1.3. Only the required minimum amount of information is requested to provide for proper evaluation. Efforts should be made to keep offers as brief as possible; concentrating on substantive information essential for proper evaluation. The proposal shall be clear, concise, include sufficient detail for effective evaluation, and for substantiating its validity. No required material shall be incorporated by reference. Elaborate format and color representations are not desirable. A proposal that does not conform to these requirements may be considered incomplete and/or nonresponsive.

L.1.4. Electronic Reference Documents: All referenced documents for this solicitation are available on the Federal Business Opportunities (FedBizOpps) website at http://www.FBO.gov.

Potential offerors are encouraged to subscribe for real-time e-mail notifications when information has been posted to the website for this solicitation.

L.1.5. Referenced Publications: Unified Facilities Criteria (UFC) and Unified Facilities Guide Specifications (UFGS) can be downloaded from the Whole Building Design Guide (WBDG) at the following address: http://www.wbdg.org. Obtaining other referenced publications; such as, Federal and Military specifications, Military Standards, and industry standards (i.e., ASTM, ANSI, ACI, NFPA, building codes) will be the responsibility of each offeror.

L.1.6. Government Point of Contact (POC): The Government individuals listed below are the primary and alternate points of contact for this acquisition. Address all questions or concerns to both individuals. Written requests for clarifications may be sent to both individuals via email.

Email is the preferred method of communication. The Government POCs are as follows:

Primary Alternate

GEOFFREY JANAVARIS NATALIE COLLINS

Geoffrey.Janavaris@us.af.mil Natalie.Collins@us.af.mil

L.1.7. Formal Communications: Offerors who determine the requirements of this solicitation require clarification(s); in order to, facilitate submittal of a responsive proposal, are requested to send all questions, clearly stated, with specific page, section, and paragraph in writing.

Questions should include sufficient detail to enable the Government to respond without requesting further clarification. Each question shall include the appropriate document reference, page number, section number, and specific paragraph. Questions shall be directed to the Primary and/or Alternate POC listed in paragraph L.1.6. Answers will be compiled and posted electronically to the FedBizOpps website: https://www.fbo.gov.

L.1.8. Debriefings: The Contracting Officer (CO) will promptly notify offerors of any decision to exclude them from the competitive range; therefore, the offeror may request and receive a debriefing in accordance with (IAW) Federal Acquisition Regulation (FAR) 15.505. Offerors excluded from the competitive range, or determined to be Unacceptable during the evaluation process; may request a pre-award debriefing or may choose to wait until after the source selection decision to request a post-award debriefing. Offerors are entitled to no more than one

(1) debriefing.

L.2. CONSTRUCTION CONTRACT VALUE

L.2.1. This acquisition is contemplated to be a Firm-Fixed Price (FFP) contract. The lowest price technically acceptable (LPTA) proposal will be awarded the contract.

L.3. PROJECT

L.3.1. Magnitude: FBNV 160011 Repair (Sustain) Central Chiller Plant, Fac 5101 is between $1,000,000 and $5,000,000; FAR 36.204(f).

L.3.2. The project identified in the solicitation is being solicited under Air Force Installation and Mission Support Center (IMSC) “Contract Authority” program. The funds certifying official believes there is a reasonable assurance that funds will be available prior to award. Offeror(s) are advised “Funds are not presently available for this project.” See Section I of the solicitation, FAR clause 52.232-18, for additional information.

L.4. ELIGIBILITY

L.4.1. This competitive procurement is open to all Woman Owned Small Business (WOSB) as a 100% set-aside. Offerors who have self-certified as a WOSB, but not submitted required documents to the SBA’s WOSB Program Repository shall comply with FAR 19.1503, and submit required documents with their proposal. Proposals submitted without all required documents may not be considered for contract award.

L.4.1.1. Offerors may submit a proposal, provided the offeror or offeror’s subcontractor has on its permanent staff; professional architects and engineers registered in the appropriate technical disciplines and provided the requirements specified in the solicitation are met. All designs accomplished under the direct supervision of appropriately licensed professionals.

L.4.1.2. Mentor-Protégé Agreements and 8(a) Joint Venture (JV) Certifications: The offeror shall provide a copy of the Small Business Administration (SBA) approved Mentor-Protégé agreement or JV Certification documentation; if either of these apply. If there will be any impacts on the requirements of the solicitation, that information shall be provided to address performance, cost, schedule, and other specific requirements of the solicitation.

L.5. RESTRICTIONS

L.5.1. Incomplete proposals: Failure to submit all the data indicated in this section will be cause for determining a proposal incomplete; therefore, shall not be considered for further technical evaluation or for subsequent award.

L.5.2. Offers must be held open until 31 Dec 17, or they will not be considered and will be rejected.

L.5.3. Only written proposals will be accepted. Oral, faxed, or telephonic proposals or modifications will not be considered and/or accepted. Submit the proposal in the format specified. Mail or deliver the proposal to the address listed in the Solicitation. Offers that do not meet these requirements may be subject to rejection.

L.6. PROPOSAL SUBMISSION

L.6.1. Standard Form (SF) 1442: The offeror shall complete blocks 14 through 20 of the SF 1442; signing in block 20B. In doing so, the offeror accedes to the contract terms and conditions as written in the solicitation and all amendments with attachments. The solicitation, once awarded, constitutes the contract.

L.6.2. All Amendments: The offeror shall acknowledge ALL amendments issued against the solicitation by signing in block 15B and completing blocks 15A and 15C of the SF 30.

L.6.3. Discrepancies: If an offeror believes the requirement in these instructions contain an error, omission, or are otherwise unsound; the offeror must immediately notify the Contracting Officer (CO) in writing with supporting rationale; as well as, the remedies the offeror is asking the CO to consider.

L.6.4. Exceptions to Solicitation Requirements: Offerors must clearly identify any exception(s) to the solicitation terms and conditions and provide complete accompanying rationale. The offeror must immediately notify the CO in writing with supporting rationale, as well as, remedies the offeror is asking the CO to consider. Each exception shall be tied to a specific paragraph or part of the solicitation to which the exception is being taken. Fully explain the impact of the exception in terms of performance, schedule, cost, and any other requirement of the solicitation; see Section L.8.2.6.

L.6.5. Representations and Certifications: Complete Representation and Certification in the System for Award Management (SAM) at https://www.sam.gov or complete the necessary fill-ins and certification IAW FAR 52.212-3 and its Alt I. If FAR 52.212- 3 and its Alt I are completed in hard copy; the documents shall be returned along with the contractor’s proposal.

L.6.6. The Government will not provide reimbursement to offeror’s for any proposal costs.

L.6.7. Mailing Requirement for Special Marking of Proposal data: The original proposal and copies, as specified in this document; shall be mailed or hand carried to the issuing office listed in Block 7 of SF 1442 on or before the deadline specified in Block 13 of SF 1442. An electronic version of the proposal shall also be included on a compact disc (CD/DVD). Please mark all packages as follows:

DO NOT OPEN IN MAIL ROOM

ATTN: GEOFFREY JANAVARIS

Reference: FA4877-17-R-A001, Repair (Sustain) Central Chiller Plant, Fac 5101

355th Contracting Squadron/MSCA 3180 S. Craycroft Road Davis-Monthan AFB, AZ 85707-3522

L.6.8. The sealed envelope or package used to submit your proposal must show the time and date specified for receipt, the solicitation number, and the name and address of the offeror.

L.6.9. Offerors are cautioned that this is a secure facility; therefore, appropriate arrangements are required to gain access to the facility with enough time to meet the proposal deadline. The United States Air Force (USAF) has visitor control procedures requiring individuals, not affiliated with the installation, to obtain a visitor pass prior to entrance. Delay should be anticipated when hand carrying proposals. Offerors should allow sufficient time to obtain a visitor pass and arrive at the 355th Contracting Squadron PRIOR to the deadline.

L.6.10. Offerors are cautioned to strictly comply with all instructions within this solicitation to ensure submission of a complete proposal. Failure to furnish a complete proposal, at the time of proposal submission; may result in the proposal being considered non-responsive to the Government and eliminated from consideration of award. Late proposals will be processed IAW FAR 52.212-1(f) “Late submission, modifications, revisions, and withdrawals of offers.” The Government will destroy all late proposals. No destruction certificate will be issued to the offeror.

L.6.11. Disposition of Unsuccessful Proposals: IAW FAR Subpart 4.8, the Government will retain one (1) copy of all unsuccessful proposals. Extra copies of unsuccessful proposals will be destroyed by the Government. No destruction certificate will be provided.

L.7. PREPARATION INSTRUCTIONS

L.7.1. Proposals shall be prepared in four (4) volumes and clearly labeled as indicated. Specific guidance regarding content of the volumes is discussed below.

L.7.2. Construction Of Volumes:

L.7.2.1. All proposals shall contain the evaluation requirements stated herein. Each volume shall not require extensive searching throughout the documents to locate and evaluate any items or area. Sub-categories of information in each of the volumes should be highlighted for ease of evaluating the information contained therein. Failure to comply may result in the proposal being found incomplete and unawardable.

L.7.2.2. All written information and data shall be on an 8 ½” x 11” sheet size format. Sheets for charts and tables may utilize 11” x 17” as appropriate. Text shall be single spaced and printed black on white paper. Font size shall be not less than 12 point. The black text or font size requirement does not apply to graphics, drawings, photos, or charts. Each volume shall be provided in an appropriate sized 3–ring binder, not to exceed 3”. A Table of Contents shall be included in each binder used. Note: Table of Content(s) do not count towards the maximum sheet page count.

L.7.2.3. Every binder shall contain: Table of Contents, List of Tables or Figures (if required), and List of Appendices. Legibility, clarity, coherence, and the contents are important. Volume Contents shall follow the order of the evaluation criteria and pages shall be numbered.

L.7.2.4. Data submitted must reflect the designer's interpretation of criteria contained in the RFP. The offeror shall not submit verbatim sections or attachments of this solicitation as part of their proposal.

L.7.2.5. Firms submitting proposals shall limit submission to data essential for evaluation of proposals; therefore, a minimum of time and monies should be expended in preparing information required by the RFP. Elaborate artwork, expensive paper and bindings, expensive/extensive visual, and other presentation aids are unnecessary. Elaborate or voluminous brochures or other presentations, beyond those sufficient to present a complete and effective response, are not desired. Materials submitted but not required by this solicitation, such as, company brochures; will not be reviewed.

L.7.2.6. Table L1 – Proposal Order and Organization:

Vol. Title Page Limitation Paper Copies CD/DVD

I ADMINISTRATIVE N/A 1 original and 2 copies 1 original*

II PRICE

(To include AF Form 3052) N/A 1 original and

2 copies 1 original*

III TECHNICAL 20 single sided or 10 double sided

1 original and 2 copies 1 original*

IV PAST PERFORMANCE 8 single sided or 4 double sided

1 original and 2 copies 1 original*

*All volumes may be submitted on one (1) disk, not to exceed four (4) disks.

L.8. ADMINISTRATIVE (VOLUME I)

L.8.1. The Government will review this volume to ensure its completeness and inclusiveness of the required items. A rating will not be assigned to the Administrative Volume. However, failure to provide the required items will be cause for determining a proposal incomplete;

therefore, not considered for any further evaluation or subsequent award.

L.8.2. This volume shall include the following as applicable:

L.8.2.1. Cover Letter - Used to: (a) Provide identifying information about the offeror, and (b) Ensure the offeror acknowledges the solicitation and all amendments.

L.8.2.2. Authorized Personnel: Provide the name, title, email address, and telephone number of the offeror POC regarding decisions made with respect to the offeror’s proposal. The offeror shall provide the names, titles, email addresses, and telephone numbers for individuals authorized to sign the proposal and negotiate on behalf of the offeror.

L.8.2.3. SF 1442: Complete in its entirety. One (1) copy of the SF 1442 must bear an original and authorized signature.

L.8.2.4. Representations and Certifications – used to verify eligibility.

L.8.2.5. Bonding Information and Bid Guarantee - as required by the solicitation and DM005.

L.8.2.6. Financial Responsibility Letter – Letter shall demonstrate contractor’s financial resources. A determination of responsibility focuses on a contractor’s financial resources and integrity.

L.8.2.7. Mentor-Protégé Agreements and 8(a) Joint Venture (JV) Certifications (if applicable) -used to verify JVs with the Small Business Administration (SBA).

L.8.2.8. Any Exceptions to Solicitation Requirements; if applicable, see Section L.6.4.

L.9. PRICE (VOLUME II)

L.9.1. Offerors are required to propose on the project identified in the solicitation; this provides a basis to evaluate the proposed price against an awardable project. Offerors will be required to submit a completed AF Form 3052 Construction Cost Estimate Breakdown with the submitted proposal. The AF Form 3052 will be used during the price evaluation to evaluate the proposals total evaluated price.

L.9.2. REQUIRED PRICING DETAILS:

L.9.2.1 SF1442 Section B: Pricing for each CLIN should be inserted into the schedule of items (Page 3), include total price for all CLINS.

L.9.2.2 The Government reserves the right to request additional pricing information after receipt and evaluation of proposals.

L.9.2.3. Ensure each dollar amount listed in Volume II includes all allowable Contractor costs, including, but not limited to, supervision, bonding, overhead, general and administrative (G&A), quality control, insurance, and profit.

L.10. TECHNICAL EVALUATION (VOLUME III)

L.10.1. GENERAL INFORMATION: At a minimum, the submission shall be prepared in a form consistent with the evaluation criteria for award set forth in Section M of this solicitation.

All information the offeror deemed appropriate to address these criteria should be included in the proposal in an orderly format following the evaluation criteria. To facilitate evaluation, Volume III should be specific, detailed, and clearly demonstrate that the offeror has a thorough understanding of the requirement for the accomplishment of this effort. Statements that the offeror understands, can, or will comply with the specifications, and phrases such as "standard procedures will be employed", or "well known techniques will be used" etc., will be considered Unacceptable. Offerors should note that data previously submitted under any prior or existing contract or solicitation will not be considered. Therefore, such data should not be relied upon, nor incorporated in the technical proposal by reference.

L.10.2. The technical proposals shall address the following two (2) Technical Factors:

Technical Factor 1: Construction Narrative.

Technical Factor 2: Schedule.

L.10.2.1. FACTOR 1, Construction Narrative: The contractor shall demonstrate that the offeror fully understands the scope of the solicitation. The Construction Narrative shall include the offeror's design and construction intent to address the project specific design and construction requirements; to include all sub-paragraphs of the design and construction requirements as identified in Specification Section 01011. The narrative shall also address the methods and procedures of providing continuous cooling to all the buildings the central plant serves throughout the construction phase.

L.10.2.2. FACTOR 2, Schedule: The project schedule shall clearly demonstrate the work throughout the design, phases of construction, and close-out phase of the contract within the government's stated maximum performance period. Offers shall include a bar chart reflecting the major construction activities with the completion period from the applicable contract Notice to Proceed (NTP). The proposal schedule shall be graphically presented, and may be on a maximum paper size of 11" x 17". The schedule shall reflect the major design and construction milestones, and the sequence of work required for this project. The schedule shall indicate start/finish dates of events, and durations. Schedule shall also identify items that have delivery dates that impact the schedule. As a minimum, Offeror's schedule shall include the Items of Work, shown in Specification Section 01011 including all sub-paragraphs of par 1.6 Project Specific Design and Construction Requirements, par 2.12. Design Submittal Package Requirements, and par 2.13 Review Time for Submittals.

L.11. PAST PERFORMANCE VOLUME (VOLUME IV):

L.11.1. When addressing past performance evaluation criteria set forth in Section M of the solicitation, the Offeror shall provide, as a minimum, a list of their past performance data from Federal, State and Local Government and private industry contracts from the past five (5) years;

not to exceed the 5 most recent projects. All the items identified below shall be addressed in the listing. Elaborate listing and extensive comments are not required or requested.

1. Contract number, type.

2. Whether the offeror performed as the prime or a subcontractor.

3. Name of contracting office and verified name, address, phone/fax number of points of contact.

4. Project Title and/or brief description of Service Provided.

5. Contract dollar value and period of performance.

6. Brief comments, if desired.

L.11.2. In selecting the references, Offerors should consider the RECENCY and RELEVANCY of the past performance information to the work required under this solicitation. Questionnaires provided to the Contracting Squadron, directly from an offeror, will not be considered. Offerors are responsible to ensure that their reference sources receive, complete, and return the questionnaires directly to this solicitations POCs prior to the solicitation close date.

L.11.3. Recency Assessment: First, an assessment of the past performance information will be made to determine if the performance is recent. For this solicitation, Recency is defined as past performance consisting of construction projects of varying complexity, performed within the past five (5) years, and based on the date of the solicitation closing date.

L.11.4. Relevant Assessment: The Government will then conduct an evaluation of Relevant performance through information obtained to determine if the construction efforts/projects performed under those contracts closely resemble the magnitude, scope, and complexity of this solicitation. In determining Relevancy for individual contracts, consideration will be given to the effort/project, or portion of the effort/project being proposed; whose contract is being reviewed and evaluated.

L.11.4.1. For this solicitation, Relevant efforts/projects are defined as construction efforts/projects meeting the following below.

L.11.4.1.1. Magnitude – Construction efforts/projects valued at greater than $1 Million, in which, the offeror’s performance was that of the prime contractor.

L.11.4.1.2. Scope – Construction efforts/projects include a broad range of maintenance, repair, alternation, or new construction of real property.

L.11.4.1.3. Complexity – Construction efforts/projects showing the capability to perform and manage a wide range of construction trades including; design, carpentry, road repair, roofing, excavation, interior and exterior electrical, heating, ventilation, air-conditioning (150 ton minimum), plumbing, sheet metal, painting, demolition, concrete masonry, and welding.

L.11.5. Performance Quality Assessment (PQA): The Government will consider the Performance Quality Assessment of Recent and Relevant efforts/projects. For each Recent and Relevant past performance record reviewed, the quality of work performed will be assessed by the Past Performance Questionnaire, Past Performance Information Retrieval System (PPIRS) information, Federal Awardee Performance and Integrity Information System (FAPIIS) information, information extracted from other databases, and if required; interviews with Government and Commercial clients.

L.11.6. Joint Ventures (JV). JVs will be verified with the Small Business Administration (SBA) prior to award.

L.11.7. Teaming Arrangements (TA). Teaming Arrangements are characterized by two (2) or more business entities working together under the representation of one (1) of the existing business entities; for the duration of the contract. A TA is not a formal merger of two (2) or more business entities. The Government recognizes the validity and integrity of TA’s detailed in FAR Subpart 9.6. The Government can only determine the responsibility of the prime contractor; FAR 9.604(b). IAW FAR 9.1, Responsible Prospective Contractors; offerors must identify, in their offer, any TA to be considered and identify the relationships and responsibilities of the teaming members.

L.12. ACQUISITION STRATEGY

L.12.1. The Government intends to evaluate proposals and award a contract without discussions;

with the exception of possible clarifications, FAR 15.306(a). Therefore, an offerors’ initial proposal should contain the best terms from a price and technical standpoint. The Government reserves the right to conduct discussions; if the CO later determines this to be in the best interest of the Government. The Government may make a determination as to whether an offeror’s proposal is determined Acceptable or Unacceptable; solely on the basis of the initial proposal submitted. Based on the ratings of each proposal against all evaluation factors and subfactors, the CO may establish a competitive range comprised of all of the most highly rated proposals;

consequently, the range may be further reduced for purposes of efficiency pursuant to FAR

15.306 (c)(2).

L.12.2. The solicitation requirements include all stated terms, conditions, representations, certifications, and all other information stated in Section L of this solicitation. Award shall be made to one (1) offeror deemed responsible with a proposal that conforms to the RFP requirements.

L.12.3. If the lowest price offer is found (a) Technically Acceptable, (b) Past Performance rating of Acceptable, and (c) found responsible; that offer will be considered the best value to the government and selected for award of the contract; subject to the availability of funds IAW Air Force Installation and Mission Support Center (IMSC) “Contract Authority” program.

L.13. DOCUMENTATION

L.13.1. After the final evaluation of proposals against the factors and subfactors is completed and documented; the Source Selection Evaluation Board (SSEB) chairperson, in conjunction with the Procurement Contracting Officer (PCO), will prepare a Comparative Analysis Report (CAR) for the Source Selection Authority’s (SSA) analysis. The SSEB will perform an analysis of the proposals, provide a written report with the results of that analysis, and provide an award recommendation to the SSA. The following documents will be prepared during the course of this source selection: Comparative Analysis Report (CAR), Source Selection Decision Document (SSDD), Evaluation Worksheets, and Evaluation Notices (ENs); if required.

L.14. DEBRIEFING OF OFFERORS

L.14.1. Debriefings are conducted with the goal of identifying, to unsuccessful offerors, where changes can be made to improve future source selection participation. Successful or unsuccessful offerors may request debriefings by providing a written request to the CO.

Debriefings shall be conducted IAW FAR 15.505 for pre-award and FAR 15.506 for post-award.

READ CAREFULLY AND SUBMIT ALL REQUIRED DOCUMENTS.

DO NOT EXCEED PAGE LIMITATIONS.

YOUR OFFER MAY BE DETERMINED UNACCEPTABLE IF YOUR PROPOSAL IS

INCOMPLETE.

(END)

(End of Summary of Changes)

File details come from the government source that posted it. Updated .