NAV000
Summary D-B-B
CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTOR ADDRESS Bldg 5101
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| Repair (Sustain) Central Chiller Plant, Fac 5101 | ||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||
| FBNV 160011 | Davis-Monthan AFB, AZ | |||||||||
| LINE | MATERIAL COST | LABOR COST | OTHER | |||||||
| NO. | ITEM | OF | QUANTITY | UNIT | TOTAL | QUANTITY | AVERAGE | TOTAL | DIRECT | LINE |
| MEASURE | RATE | COST | TOTAL |
| Summary | |||||
| 1.0 | Division 1 - GENERAL REQUIREMENTS | ||||
| 2.0 | Division 2 - EXISTING CONDITIONS | ||||
| 3.0 | Division 3 - CONCRETE | ||||
| 4.0 | Division 4 - MASONRY | ||||
| 5.0 | Division 5- METALS | ||||
| 6.0 | Division 6- WOODS & PLASTICS | ||||
| 7.0 | Division 7- MOISTURE PROTECTION | ||||
| 8.0 | Division 8- DOORS & WINDOWS | ||||
| 9.0 | Division 9 - FINISHES | ||||
| 10.0 | Division 10- SPECIALTIES | ||||
| 11.0 | Division 11- EQUIPMENT | ||||
| 12.0 | Division 12- FURNISHINGS | ||||
| 13.0 | Division 13- SPECIAL CONSTRUCTION | ||||
| 14.0 | Division 14- CONVEYING SYSTEMS | ||||
| 15.0 | Division 21- FIRE SUPPRESSION | ||||
| 16.0 | Division 22- PLUMBING | ||||
| 17.0 | Division 23 - HVAC | ||||
| 18.0 | Division 25 - INTEGRATED AUTOMATION | ||||
| 19.0 | Division 26 - ELECTRICAL | ||||
| 20.0 | Division 27 - COMMUNICATIONS | ||||
| 21.0 | Division 28 - ELECTRONIC SAFETY AND SECURITY | ||||
| 22.0 | Division 31 - EARTHWORK | ||||
| 23.0 | Division 32 - EXTERIOR IMPROVEMENTS | ||||
| 24.0 | Division 33 - UTILITIES | ||||
| 25.0 | Division 34 - TRANSPORTATION | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! |
| 26.0 | Division 40 - PROCESS INTEGRATION | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! |
| 27.0 | Division 41 - MATERIAL PROCESSING AND HANDLING EQUIPMENT | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! |
| 28.0 | Division 42 - PROCESS HEATING, COOLING, AND DRYING EQUIPMENT | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! |
| 29.0 | Division 43 - PROCESS GAS AND LIQUID HANDLING, PURIFICATION, AND STORAGE | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! |
| 30.0 | Division 44 - POLLUTION AND WASTE CONTROL EQUIPMENT | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! |
| 31.0 | Division 46 - WATER WASTEWATER EQUIPMENT | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! |
| 32.0 | Division 48 - ELECTRICAL POWER GENERATION | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! |
| 33.0 | |||||
| 34.0 | SUBTOTAL | ||||
| 35.0 | |||||
| 36.0 | DESIGN BID BUILD DELIVERY | ||||
| 37.0 | Prime Contractor Overhead & General Conditions | ||||
| 38.0 | Prime Contractor Profit | ||||
| 39.0 | Subtotal | ||||
| 40.0 | Bond | ||||
| 41.0 | Subtotal | ||||
| 42.0 | Tax Planning Factor | 3.97% | |||
| 43.0 | Subtotal |
| PROJECT TOTAL | |
| AF Form 3052, Jan 88 |
2150.0 ERROR:#REF!
Other files
| File | Type | Posted |
|---|---|---|
| Site_Visit_Meeting_Minutes.pdf | ||
| FA4877-17-R-A0010002_Amendment.pdf | ||
| RFI_Responses_FA4877-17-R-A001.pdf | ||
| Attch_3_-_Facilty_As-Builts.zip | ZIP file | |
| Attch_2_-_Asbestos_&_LBP_Survey.pdf | ||
| FA4877-17-R-A0010001_Amendment.pdf | ||
| Attch 1 - Project Specifications.pdf | ||
| Attch 7 - Special Instructions.docx | DOCX document | |
| Attch 4 - Past Performance Questionnaire.docx | DOCX document | |
| Attch 8 - Special Event EAL Template.xls | XLS spreadsheet | |
| Attch 5 - AF Form 66 | — | |
| FA4877-17-R-A001_Chiller_Solicitation.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .