Attch 6 - Cost Estimate -Blank

17 KB Posted

Attached to
Repair (Sustain) Central Chiller Plant, Fac 5101
Solicitation number
FA487717RA001-Synopsis
Issued by

About this file

Attch 6 - Cost Estimate -Blank (Beast)

Text of this file

NAV000

Summary D-B-B

CONSTRUCTION COST ESTIMATE BREAKDOWN

CONTRACTOR ADDRESS Bldg 5101

CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
Repair (Sustain) Central Chiller Plant, Fac 5101
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
FBNV 160011Davis-Monthan AFB, AZ
LINEMATERIAL COSTLABOR COSTOTHER
NO.ITEMOFQUANTITYUNITTOTALQUANTITYAVERAGETOTALDIRECTLINE
MEASURERATECOSTTOTAL
Summary
1.0Division 1 - GENERAL REQUIREMENTS
2.0Division 2 - EXISTING CONDITIONS
3.0Division 3 - CONCRETE
4.0Division 4 - MASONRY
5.0Division 5- METALS
6.0Division 6- WOODS & PLASTICS
7.0Division 7- MOISTURE PROTECTION
8.0Division 8- DOORS & WINDOWS
9.0Division 9 - FINISHES
10.0Division 10- SPECIALTIES
11.0Division 11- EQUIPMENT
12.0Division 12- FURNISHINGS
13.0Division 13- SPECIAL CONSTRUCTION
14.0Division 14- CONVEYING SYSTEMS
15.0Division 21- FIRE SUPPRESSION
16.0Division 22- PLUMBING
17.0Division 23 - HVAC
18.0Division 25 - INTEGRATED AUTOMATION
19.0Division 26 - ELECTRICAL
20.0Division 27 - COMMUNICATIONS
21.0Division 28 - ELECTRONIC SAFETY AND SECURITY
22.0Division 31 - EARTHWORK
23.0Division 32 - EXTERIOR IMPROVEMENTS
24.0Division 33 - UTILITIES
25.0Division 34 - TRANSPORTATIONERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
26.0Division 40 - PROCESS INTEGRATIONERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
27.0Division 41 - MATERIAL PROCESSING AND HANDLING EQUIPMENTERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
28.0Division 42 - PROCESS HEATING, COOLING, AND DRYING EQUIPMENTERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
29.0Division 43 - PROCESS GAS AND LIQUID HANDLING, PURIFICATION, AND STORAGEERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
30.0Division 44 - POLLUTION AND WASTE CONTROL EQUIPMENTERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
31.0Division 46 - WATER WASTEWATER EQUIPMENTERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
32.0Division 48 - ELECTRICAL POWER GENERATIONERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
33.0
34.0SUBTOTAL
35.0
36.0DESIGN BID BUILD DELIVERY
37.0Prime Contractor Overhead & General Conditions
38.0Prime Contractor Profit
39.0Subtotal
40.0Bond
41.0Subtotal
42.0Tax Planning Factor3.97%
43.0Subtotal
PROJECT TOTAL
AF Form 3052, Jan 88

2150.0 ERROR:#REF!

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .