Attachment_6_Section_01011_Design_Requirements_(DRAWINGS).pdf

PDF 1 MB Posted

Attached to
FBNV 09-0036 Sustain (Renovate) LRS Warehouse
Solicitation number
FA4877-15-R-0005
Issued by

About this file

Attachment 6 01011 Design Requirements Drawings

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 Demo walls, replace with framed walls w/drywall. Walls separating office area from the warehouse must meet fire-rating and insulation requirements. Replace all windows to match existing and doors per specified details. Doors and windows leading to the warehouse must meet fire-rating requirements. Load bearing walls should be incorporated into the design as required to support new fire-rated and insulated ceiling and mechanical/electrical systems. Paint walls and install cove base, color to be approved through CO. Include new electrical and LAN receptacles and lighting switches.

Glazed steel doors w/ cipher lock to access warehouse

Wall Plan (01011 Design Requirements, Section 1.6.5.2.)

First Floor, Building 5111

Demo and replace drywall and protect/repair wall framing. Replace all windows to match existing and doors per specified details. Doors and windows leading to the warehouse must meet fire-rating requirements. Load bearing walls should be incorporated into the design as required to support new fire-rated and insulated ceiling and mechanical/electrical systems. Paint walls and install cove base, color to be approved through CO. Include new electrical and LAN receptacles and lighting switches.

Patch and paint walls, color to be approved through CO.

Demo and replace drywall and protect/repair wall framing. Replace all windows to match existing and doors per specified details. Load bearing walls should be incorporated into the design as required to support new fire-rated and insulated ceiling and mechanical/electrical systems. Paint walls, color to be approved through CO. Include tile wainscot per the DCG. Include new electrical receptacles and lighting switches.

Glazed wood doors

Solid core wood doors

Fire-rated glazed steel door

Fire-rated steel door

Include 1-hr fire rated enclosure for stairwell walls 1.6.5.8.

Remove door frames 1.6.5.2.8.2.

Demo and do not replace wood wainscot 1.6.5.2.5.9.

Fire-rated steel door w/ cipher lock to access warehouse

Demo and do not replace windows

3 3 3 3 3 3

2 2 2 2

Steel door 7

Notes: Protect and preserve all doors not indicated for replacement. Any door requirements to meet fire code, UFC 3- 600-01, and the base DCG that differ from what is specified shall override door plan.

Specifications will be modified to meet new layout requirements identified in section 1.6.5. and 1.6.13. of the 01011 Design Requirements. Paint all exterior wall surfaces, to include sanding and painting doors and door frames. Replace storefront windows in warehouse area.

Door Replacement Plan

Replace door frame weathering strip

1.6.5.2.6.1. (2)

Replace door hardware, including keyed lock

1.6.5.2.6.1. (1)

Replace door, door frame, and hardware

1.6.5.2.6.1. (4)

3 3

3 3

2 3

3 3

2 7

2 4

Glass storefront door8

Patch over wall inset 1.6.5.2.8.3.

Patch over wall window opening

1.6.5.2.8.3.

Replace roll-up door, reusing the drum, motor, and cover.

1.6.5.2.6.2.

Replace piping and patch CMU wall to match existing.

1.6.5.2.6.3.

Replace door hardware, to include new panic bar

1.6.5.2.6.1. (3)

Demo steel warehouse doors and infill with CMU block to match existing wall. Restore wall where the door was located.

1.6.5.2.3.

Replace personnel door, door frame, and hardware

1.6.5.2.6.1. (5)

Replace door, door frame, and hardware

1.6.5.2.6.1. (4)

Relocate wall to be flush with exterior wall 1.6.5.2.8.4.

Replace piping and patch CMU wall to match existing.

1.6.5.2.6.3.

Wall Plan (01011 Design Requirements, Section 1.6.5.2.)

Second Floor, Building 5111

Demo walls, replace with framed walls w/drywall. Walls separating office area from the warehouse must meet fire-rating and insulation requirements. Replace all windows to match existing and doors per specified details. Doors and windows leading to the warehouse must meet fire-rating requirements. Load bearing walls should be incorporated into the design as required to support new fire-rated and insulated ceiling and mechanical/electrical systems. Paint walls and install cove base, color to be approved through CO. Include new electrical and LAN receptacles and lighting switches.

Glazed steel doors w/ cipher lock to access warehouse Demo and replace drywall and protect/repair wall framing. Replace all windows to match existing and doors per specified details. Doors and windows leading to the warehouse must meet fire-rating requirements. Load bearing walls should be incorporated into the design as required to support new fire-rated and insulated ceiling and mechanical/electrical systems. Paint walls and install cove base, color to be approved through CO. Include new electrical and LAN receptacles and lighting switches.

Paint walls, color to be approved through

CO.

Demo and replace drywall and protect/repair wall framing. Replace all windows to match existing and doors per specified details. Load bearing walls should be incorporated into the design as required to support new fire-rated and insulated ceiling and mechanical/electrical systems. Paint walls, color to be approved through CO. Include tile wainscot per the DCG. Include new electrical receptacles and lighting switches.

Glazed wood doors

Solid core wood doors

Fire-rated glazed steel door

Fire-rated steel door

Fire-rated steel door w/ cipher lock to access warehouse

Steel door

Door Replacement Plan

Glass storefront door

Notes: Protect and preserve all doors not indicated for replacement. Any door requirements to meet fire code, UFC 3- 600-01, and the base DCG that differ from what is specified shall override door plan.

Specifications will be modified to meet new layout requirements identified in section 1.6.5. and 1.6.13. of the 01011 Design Requirements,.

2 2

2 3

Demo and do not replace wood wainscot throughout

Demo floor finishing, restore flooring, and install new carpet.

Flooring Plan (01011 Design Requirements, Section 1.6.5.3.)

First Floor, Building 5111

Demo floor finishing, restore flooring, and install new ceramic tile.

Demo floor finishing, restore flooring, and install new rubber flooring.

Demo floor finishing, restore flooring, and install new tile flooring to match wall wainscot and meet base DCG requirements.

Remove tile floor finishing, restore concrete as required, and paint to match warehouse concrete floor

Notes: Any requirements to meet code, and the base DCG that differ from what is specified shall override plan.

Specifications will be modified to meet new layout requirements identified in section 1.6.5. and 1.6.13. of the 01011 Design Requirements. Apply skid resistant/non-slip epoxy paint finish throughout warehouse floor.

Flooring Plan (01011 Design Requirements, Section 1.6.5.3.)

Notes: Any requirements to meet code, and the base DCG that differ from what is specified shall override plan.

Specifications will be modified to meet new layout requirements identified in section 1.6.5. and 1.6.13. of the 01011 Design Requirements. Apply skid resistant/non-slip epoxy paint finish throughout warehouse floor.

Demo floor finishing, restore flooring, and install new carpet.

Demo floor finishing, restore flooring, and install new ceramic tile.

Demo floor finishing, restore flooring, and install new rubber flooring.

Demo floor finishing, restore flooring, and install new tile flooring to match wall wainscot and meet base DCG requirements.

Demo and install ceiling. Ceiling must include fire-rated separation to meet UFC 3-600-01 and NFPA 101 requirements for separation between office area and warehouse area. Ceiling must also include insulation. Construct fire separation ceiling with suspended drop ceiling underneath. Run all required electrical and HVAC components in the space between the fire separation and drop ceiling. Replace all HVAC diffusers, air vents, fire suppression sprinklers, lighting, and emergency egress lightings and signs.

Ensure ceiling is structurally designed to support loads.

Ceiling Plan (01011 Design Requirements, Section 1.6.5.4.)

First Floor, Building 5111

Demo and install drop ceiling. Replace all HVAC diffusers, fire suppression sprinklers, lighting, and emergency egress lighting and signs.

Modify ceiling to meet UFC 3-600-01 and NFPA 101 requirements for separation between office area and warehouse area.

Protect and preserve existing ceiling components.

Demo and install ceiling. Ceiling must include fire-rated separation to meet UFC 3-600-01 and NFPA 101 requirements for separation between office area and warehouse area. Ceiling must also include insulation. Ceiling should be hard board and meet base DCG standards for bathroom ceilings. Replace all HVAC diffusers, air vents, exhaust fan vents, fire suppression sprinklers, lighting, and emergency egress lighting and signs.

Notes: Any requirements to meet code and the base DCG that differ from what is specified shall override plan.

Specifications will be modified to meet new layout requirements identified in section 1.6.5. and 1.6.13. of the 01011 Design Requirements. Fire suppression shall be incorporated into the ceiling of and provided to all office areas.

Ceiling Plan (01011 Design Requirements, Section 1.6.5.4.)

Demo and install ceiling. Ceiling must include fire-rated separation to meet UFC 3-600-01 and NFPA 101 requirements for separation between office area and warehouse area. Ceiling must also include insulation. Construct fire separation ceiling with suspended drop ceiling underneath. Run all required electrical and HVAC components in the space between the fire separation and drop ceiling. Replace all HVAC diffusers, air vents, fire suppression sprinklers, lighting, and emergency egress lightings and signs.

Ensure ceiling is structurally designed to support loads.

Demo and install drop ceiling. Replace all HVAC diffusers, fire suppression sprinklers, lighting, and emergency egress lighting and signs.

Modify ceiling to meet UFC 3-600-01 and NFPA 101 requirements for separation between office area and warehouse area.

Protect and preserve existing ceiling components.

Demo and install ceiling. Ceiling must include fire-rated separation to meet UFC 3-600-01 and NFPA 101 requirements for separation between office area and warehouse area. Ceiling must also include insulation. Ceiling should be hard board and meet base DCG standards for bathroom ceilings. Replace all HVAC diffusers, air vents, exhaust fan vents, fire suppression sprinklers, lighting, and emergency egress lighting and signs.

Notes: Any requirements to meet code and the base DCG that differ from what is specified shall override plan.

Specifications will be modified to meet new layout requirements identified in section 1.6.5. and 1.6.13. of the 01011 Design Requirements. Fire suppression shall be incorporated into the ceiling of and provided to all office areas.

Details (01011 Design Requirements, Section 1.6.)

First Floor, Building 5111

Demo and replace counter and display boards, match existing. Install gov’t furnished display case.

1.6.5.6.

Install a/v hookups 1.6.10.5.

Protect and relocate (if required) the guard rail

Include motion-detector sensed lighting 1.6.10.8.

Demo cubbies. Do not replace.

1.6.5.6.

Provide comm requirements for SIPR data ports 1.6.5.6.

Details (01011 Design Requirements, Section 1.6.)

Install a/v hookups

1.6.10.5.

Include motion-detector sensed lighting 1.6.10.8.

Construct new unisex bathroom.

1.6.5.13.

Relocate wall to adjust room sizes to accommodate new restroom.

1.6.5.13.

Number of Workstations First Floor, Building 5111

2 2 2

1 1

2 3

Notes: Any requirements to meet code and the base DCG that differ from what is specified shall override plan. Electrical outlets and supply, data ports, and telephone ports should be provided to meet the requirements for the indicated number of workstations and, at a minimum, the base DCG. The number of workstations is not necessarily an indication of building occupancy and should not be used to calculate building occupancy.

2 2

4 4

5 3 3 3

Number of Workstations

Notes: Any requirements to meet code and the base DCG that differ from what is specified shall override plan. Electrical outlets and supply, data ports, and telephone ports should be provided to meet the requirements for the indicated number of workstations and, at a minimum, the base DCG. The number of workstations is not necessarily an indication of building occupancy and should not be used to calculate building occupancy.

1 1

1 1