Appendix C- 355 CES EMO Civ Contractor Environmental Guide.pdf

PDF 2 MB Posted

Attached to
DMAFB Multiple Award Construction Contract (MACC) Federal contract opportunity
Solicitation number
FA4877-12-R-0008
Issued by
Department of the Air Force Air Combat Command

About this file

Appendix C - 355 CES EMO Civ Contractor Environmental Guide

View the file

Other files for this federal contract opportunity

Other files attached to DMAFB Multiple Award Construction Contract (MACC), newest first.
File Type Posted
FA4877-12-R-0008-0002 MACC Amendment 2.pdf PDF
Appendix D - —
Appendix D - —
Project Package 1 - As-Built Drawings —
Project Package 1 - As-Built Drawings —
Project Package 1 - As-Built Drawings —
Project Package 1 - As-Built Drawings —
Project Package 2 - As-Built Drawings —
Project Package 2 - As-Built Drawings —
Project Package 1 - As-Built Drawings —
Project Package 2 - As-Built Drawings —
Project Package 2 - As-Built Drawings —
Project Package 1 - Project Drawings - Revised.pdf PDF
Project Package 1 - As-Built Drawings - Facility 4455.zip ZIP file
Project Package 3 - Building 81 Communications Removal and Replacement.pdf PDF
Project Package 1 - Bldgs 4101 and 4455 Various Asb Reports.xlsx XLSX spreadsheet
Project Package 1 - As-Built Drawings - Facility 4101.zip ZIP file
Project Package 2 - Electrical-Comm Site Plan.pdf PDF
1 - MACC Pre Proposal Conference - Record of Meeting - Sign In Sheet.pdf PDF
2 - MACC Pre-Proposal Conference - Power Point Presentation.ppt PPT presentation
FA4877-12-R-0008-0001 MACC Amendment 1.pdf PDF
3 - MACC Pre-Proposal Conference - Site Map.pdf PDF
Appendix D - Davis-Monthan AFB CIP Data Contour Data.zip ZIP file
Appendix E - DoD Minimum Antiterrorism Standards for Buildings - UFC 4-010-01.pdf PDF
Special Event EAL - Your Companys Name.xls XLS spreadsheet
MACC Site Visit Clarifications and Instructions - 17 May 12 at 0900 - Swan Gate.pdf PDF
ID2 - Davis Monthan - Jan11.pdf PDF
Project Package 3 - Project Drawings —
Project Package 4 - Project Drawings.pdf PDF
FA4877-12-R-0008 MACC.pdf PDF
Project Package 3 - Wage Determination - Construction Type —
Project Package 3 - Project Drawings —
Wage Determination 05-2025 —
Project Package 3 - Project Drawings —
MACC Statement of Work.pdf PDF
Project Package 2 - Section 01010 - Summary of Work —
Project Package 3 - Section 01011 - Design Requirements —
Project Package 2 - Project Drawings - Temporary Maintenance Bay At Facility 1750.pdf PDF
Project Package 2 - MACC Bid Schedule Seed Project 2.xlsx XLSX spreadsheet
Project Package 3 - Project Drawings —
Project Package 3 - Project Drawings —
MACC Wage Determinations —
Project Package 2 - Section 01011 - Design Requirements —
Project Package 2 - Section 01011 - Design Requirements —
Project Package 4 - Wage Determination - Construction Type —
Project Package 2 - Section 01010 - Summary of Work —
Project Package 1 - Section 01011 - Design Requirements —
Project Package 4 - MACC Bid Schedule Seed Project 4.xlsx XLSX spreadsheet
Appendix A- Design Compatibility guidelines —
Project Package 3 - Section 01010 - Summary of Work —
Show all 50

DMAFB Multiple Award Construction Contract (MACC) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

6 December 2010

C ivilian

C o n tracto r E n viro n m e n tal G uid e

…Protection of human health and the environment...

This Environmental Guide is provided to assist civilian contractors in meeting federal, state, and local environmental regulations while working on Davis-Monthan Air Force Base

355th Civil Engineer Squadron Environmental Management Office 5285 E. Madera Street Davis-Monthan AFB, 85707 Phone 520 228-5372 Fax 520 228-3709

Civilian Contractor Environmental Guide 1

1. Obligations: As a contractor, you are obligated to comply with federal, state, and local environmental regulations, and Davis-Monthan Environmental Management System requirements. Some of the environmental issues to be considered while completing your job at Davis-Monthan AFB include:

Hazardous Material usage and management;

Recovered Materials usage;

Protection of native plants and birds

Dust control (caused by activities such as land stripping, trenching, sandblasting, etc.);

Painting or cleaning operations;

Stormwater Discharges;

C&D waste recycling / disposal; and

Waste management.

Influence on the installation’s most significant environmental aspects

As the prime contractor, you are also responsible for ensuring any subcontractors also adhere to environmental regulations.

2. Responsibilities: Contractors, subcontractors and concessionaires are responsible for environmental protection while in the process of executing contracts on Davis-Monthan Air Force Base involving, but not limited to:

New Construction

Renovations and major repairs on existing structures or systems

Demolition/removal of old structures or systems

Performance of contract maintenance or services

Environmental regulations will be will be complied with by all contractors, subcontractors, and concessionaires.

Pre-work conference: The prime contractor will brief employees and/or subcontractors on environmental regulations and policies as applicable to the project.

Project sites are subject to inspection by the DM Environmental Office to ensure compliance with environmental regulations and practices.

Civilian Contractor Environmental Guide 2

Contractors must report spills to the Base Fire Department dial 911 (or 228-3333 from cell phone) when:

- The spill involves an area greater than two feet; or

- The spill is greater than one gallon; or

- The spills is an unknown substances; or

- The spill is on soil or cracked pavement; or

- The spill may create a threat of fire or explosion; or

- The spill may be a risk to personnel.

The Base Fire Department will report these spills to the DM Environmental Office.

Contractors must report small spills (spill less than two feet in area) to the DM Environmental Office for directions regarding disposal of spill residues (228-5849 or 228-5372).

Contractors must report all accidents involving Air Force people, property, or equipment damage, and any contractor personnel injured in the performance of the Air Force contract to the Contracting

Office.

Contractors shall take immediate corrective action to comply with environmental regulations if informed of a violation by the Contracting Office.

If necessary, appropriate actions will be initiated through Contract Management to correct substandard environmental practices or conditions.

Civilian Contractor Environmental Guide 3

3. Summary of Common Environmental Requirements and Contractor Responsibilities: The following, organized by the step in the construction project, is a list of common Contractor responsibilities. This table is not all inclusive of all environmental requirements that could be encountered during a construction project (for instance the removal of underground storage tanks). If further guidance is needed on a specific construction project, please contact the Davis-Monthan Environmental Office at 228-5372.

Project Step

Requirement When required? What is required? Required Submission

At Contract Award

Recovered Materials Certification prior to Construction

When the contractor is installing items that must contain recycled material. (for instance carpet, floor tile, restroom dividers, park benches, etc.)

By signing the contract, the contractor certifies that “Recovered Materials” to be used in the project will be at least the amount required by the contract specifications (FAR 52.223-4).

Refer to www.epa.gov/cpg for further information.

De facto submission by the signing of the contract.

Complete Appendix E

Always unless deemed not applicable by the installation EMS Cross-Functional Team

Complete the EMS Most Significant Environmental Aspects Awareness Form at Appendix E. Turn form into contract administrator after the pre-performance meeting.

Submit a copy of the completed form to the contract administrator.

Before Construction/ Performance

Environmental Management System Awareness Level Training

Always unless deemed not applicable by the installation EMS Cross-Functional Team

Complete EMS Awareness Training on the ESOH Training Network (www.esohtn.com ). This must be accomplished prior to any work being accomplished on the installation. Follow the instructions in Appendix F of this document.

(Executive Order 13423 Section 3. Paragraph e and f.)

Submit a copy of the certificate of completion to the contract administrator.

Protection of Native Plants

Always when land will be disturbed (even if the area is less than one acre)

It is unlawful for any person to destroy, dig up, mutilate, collect, cut, harvest, or take any living native protected plant species without first obtaining required permits, tags, seals, or receipts from the Arizona Department of Agriculture (ADA: Arizona State Statute, Chapter 7 – Arizona Native Plants). Native protected plant species include, but are not limited to: saguaro cactus, barrel cactus, pima pineapple cactus, prickly-pear cactus and many species of agave, cholla, hedgehog, ocotillo, senita and yucca, as well as ironwood, palo verde and mesquite trees.

At least 30 days prior to the start of construction, contact the ADA

– Tucson Office (520-628-6317) to apply for a permit/submit Notice of Intent (NOI). ADA fees apply.

Obtain approved permit, tags, seals, receipts from the AZDA prior to the removal of native plants.

Submit copy of ADA permit to the Contracting Office.

Prior to removal of the native plant for transplanting – the native plant tag and seal must be firmly affixed to each plant.

After transplanting, the tag and seal should be removed from the plant and kept as proof that the plant was legally obtained.

Civilian Contractor Environmental Guide 4

Project Step

Requirement When required? What is required? Required Submission

Before Construction/

(Continued)

Protection of Native Birds

Always when land will be disturbed (even if the area is less than one acre)

It is unlawful to kill, possess, or trade migratory birds, their parts, nests, or eggs (Migratory Bird Act Treaty). Several bird species that are of concern at DMAFB include: Burrowing Owls, Swainson’s Hawks, Cooper’s Hawks, and Great Horned Owls.

The contractor shall contact the DM Environmental Office (228- 3215) if any birds are noted to be burrowing/nesting/living within or immediately adjacent to the planned construction area.

If the area is marked with a “Caution - Burrowing Owls” sign, the contractor shall abide by the warnings on the sign and shall contact the Environmental Flight (228-3215) to report that construction is planned in the area.

N/A

Preservation of Cultural Resources

Required when a building or structure is over 50 years of age or was built or used during the Cold War

Also required when archaeological sites or historic trails are encountered

The Arizona State Historic Preservation Office (SHPO) is required to review federal projects that may affect historic or archaeological properties (National Historic Preservation Act;

Arizona Historic Preservation Act).

Contact the DM Environmental Office (228-3215) to determine if the building/structure/archaeological site is already classified as an historic site.

The DM Environmental Office may contact the Arizona SHPO for assistance.

Hazardous Material Review

Always

At least 3 weeks prior to the start of construction, submit anticipated hazardous material usage (e.g., paint, adhesives, sealants, paint remover, refrigerants, pesticides, acids, compressed gases, etc.), a Material Safety Data Sheets (MSDS) for each hazardous material, and a contractor AF-EESOH-MIS worksheet for each hazardous material to be used during the project.

Refer to Appendix A for guidance on the submission anticipated usage, MSDSs and contractor AF-EESOH-MIS worksheets.

Submit material usage, MSDS(s), and contractor AF-EESOH- MIS worksheet(s) to the Contracting Office.

Civilian Contractor Environmental Guide 5

Step

Requirement When required? What is required? Required Submission

Before Construction/

Asbestos Determination

Prior to renovation or demolition activities

If a project has already been designed (i.e., it is not a design/build and it is not a SABER project), then DM will inform the contractor of the asbestos determination.

If a project is a SABER project or a design/build project, then the contractor is responsible for the asbestos determination as follows:

The contractor must test for asbestos prior to renovation or demolition activities using an EPA accredited Asbestos Building Inspector.

If asbestos is present, the Contractor must:

Submit an PDEQ Asbestos NESHAP Notification/ Permit Activity Application for Renovation / Demolition Activities at least 10 days prior to the start of work (permit application fees apply)

- Ensure asbestos workers are properly trained

- Ensure asbestos inspector is certified

For questions contact PDEQ at 520-243-7400.

Submit a copy of the Asbestos Survey Report to the Contracting Office.

If asbestos is present, submit a copy of the Asbestos Removal / Demolition Activity Permit obtained from PDEQ to the Contracting Office.

Lead-Based Paint (LBP) Determination

Testing for LBP is necessary prior to renovation, repair, demolition, sanding, sandblasting, or maintenance activities that will involve or disturb painted surfaces.

If a project has already been designed (i.e., it is not a design/build and it is not a SABER project), then DM will inform the contractor of the lead-based paint determination.

If a project is a SABER project or a design/build project, then the contractor is responsible for the lead-based paint determination as follows:

LBP data may be available for review for some buildings.

Contact the Bioenvironmental Engineering Office or the CE LBP Program Officer to determine if LBP data already exists for the specific building or work area.

If data does not exist or is inadequate, testing for LBP is required.

If it is determined that LBP is present above the action level and will be disturbed, the contractor will ensure activities are performed in conformance with regulations governing lead paint in the construction industry (OSHA 29 CFR 1926.62) to ensure occupant, worker, and environmental protection. Necessary abatement and protection procedures shall be incorporated into work plans and contract documents.

Submit a copy of the LBP Survey Report to the Contracting Office.

If LBP is present, submit a copy of the LBP Removal/ Demolition Activity to the Contracting Officer.

Civilian Contractor Environmental Guide 6

Step

Requirement When required? What is required? Required Submission

Before Construction/

Lead-Based Paint (LBP) Determination

Bioenvironmental Engineering and the CE LBP Program Officer review contractor submittals and work plans, including training certifications, for project activities that disturb LBP.

THE USE OF PAINT WITH A LEAD CONTENT OF 0.06% OR

GREATER IS PROHIBITED.

Base Civil Engineering Work Clearance Request

Prior to any excavation work, trenching, digging, or boring

Complete Blocks 1, 3, 5, 6, and 7 of the Base Civil Engineering Work Clearance Request – AF Form 103 (refer to http://www.e-publishing.af.mil/search.asp?keyword=AF103 and then select the AF103 IMT form).

As specified in Block 1, Form 103 must be accompanied by a drawing/sketch showing the street, cross street, building(s) if applicable, and the area(s) to be excavated, trenched, dug, or bored.

It is the responsibility of the contractor to contact Arizona Blue Stake for the marking of telephone, gas, and electric lines at 1- 800-782-5348. For additional information refer to www.azbluestake.com.

Submit two sets of the request (each set to contain AF Form 103 and the location drawing) to Civil Engineering Operations Flight (228-3171) for processing/approval.

Work shall not begin without an approved AF Form 103.

and Demolition (C&D) Debris Diversion Plan

At least 3 weeks prior to the start of construction, submit the C&D Debris Diversion Plan – this plan describes how the contractor will recycle (or dispose) of scrap metal, concrete, wood, green waste, garbage, etc.

Note: DMAFB encourages recycling.

Refer to Appendix B for guidance.

Submit the C&D Debris Diversion Plan to the Contracting Office.

Air Quality Activity Permit for dust control

Landstripping and/or earthmoving (greater than 1 acre); trenching (greater than 300 feet); road construction (greater than 50 feet); abrasive blasting, crushing/screening, etc.

Submit an Air Quality Activity Application to PDEQ

Obtain Air Quality Activity Permit from PDEQ.

Refer to Pima County Code, Title 17 - Air Quality Control, Table 17.12.540 for permit fees

Refer to PDEQ Technical Procedure, TECH-211 - Determining Applicability for Air Quality Permits for guidance

Submit a copy of the permit obtained from PDEQ to Contracting

Civilian Contractor Environmental Guide 7

Step

Requirement When required? What is required? Required Submission

Before Construction/

Minimize organic solvent emissions from outdoor spray paint operations

Always (unless architectural coating or spot painting exemption)

Conduct operation in an enclosed area equipped with controls to contain no less than 96% of the overspray.

If an architectural or spot painting exemption has been obtained from PDEQ, submit a copy of the exemption to the

Storm Water Pollution Prevention Plan (SWPP Plan) and AZPDES General Permit for Discharges from

Activities

When 1 acre or more of soil disturbance

The AZPDES General Permit for Discharges from Construction Activities requires the preparation of a SWPP Plan and the submittal of a Notice of Intent (NOI) with ADEQ at least two days prior to the start of construction activities.

For additional information refer to the ADEQ Water Quality Division webpage at http://www.azdeq.gov/environ/water/index.html.

Submit NOI and SWPP Plan to ADEQ

Submit copy of the SWPP Plan and the NOI to the Contracting

Permission to Use Equipment Containing Radioactive Material

And/or Permission to Use Radiation Producing Equipment

Always required if the equipment contains radioactive material (such as nuclear density gauges), and/or

Always required if the radiation producing equipment meets any of the following criteria:

a. Equipment generating radiofrequency in excess of 7 Watts and/or 1000 MHz; or

b. Lasers that are class 3b or 4;

or

c. Ionizing radiation such as x-ray equipment for imaging; or

d. Ultraviolet radiation for industrial use such as welding processes.

Submit a letter to the 355th Bioenvironmental Engineering Flight detailing the work to be done, the equipment to be used, the timeframe for the work, and POCs (including telephone numbers). A copy of the Radioactive Material License (with NRC Form 241 if it is a state license) and the contract must be attached to the letter.

The Bioenvironmental Engineering Flight will provide an approval letter regarding the use of radioactive material on DMAFB. The radioactive material or radiation producing equipment may not be brought on-base until the contractor receives an approval letter from Bioenvironmental Engineering. Surveys may be performed to ensure that general public exposure is within limits.

Submit request for the use of radioactive material and/or radiation producing equipment to Bioenvironmental Engineering.

Civilian Contractor Environmental Guide 8

Step

Requirement When required? What is required? Required Submission

Before Construction/

Notice of Intent to Drill (NOI)

When drilling, deepening, modifying, capping, or abandoning a monitoring well, drinking water well, piezometer, or environmental well.

Submit a NOI to Arizona Department of Water Resources

(ADWR).

Obtain from ADWR the drilling card authorizing the drilling. The drilling card must be kept in the possession of the driller at the well site during drilling. Drilling may not begin until the drilling card has been received. If the driller changes, the new driller cannot begin drilling until he receives a new drilling card from

ADWR.

For additional information refer to the ADWR website at http://www.water.az.gov/dwr/ or the webpage - Online Filing Center for Notices of Intent to Drill Wells at www.water.az.gov/webnoi/WebNoiDll.dll/EXEC/0/15jt00q13kdna v1gw5se80v2x9q4.

Submit a copy of the NOI and the drill card

Proper management of hazardous materials

Follow the “Civilian Contractor Safety / Fire Guide” and common industry good housekeeping practices.

During Construction/

Reporting of hazardous material usage

Monthly for contracts greater than 60 days

Refer to Appendix A for guidance.

Submit usage information to the

Asbestos Removal

If asbestos was determined to be present (renovation or demolition activities)

The Contractor must:

Follow the requirements of the Asbestos Removal /

Demolition Activity Permit Ensure that asbestos waste is properly managed Obtain certification of asbestos removal/inspection

Submit disposal tickets and certification of asbestos removal/inspection records to Contracting Office.

Proper management of waste and recyclables (hazardous waste, garbage, scrap metal, etc.)

Always Refer to Appendix C for guidance regarding Hazardous Waste, PCB waste, and Universal Waste.

For C&D waste follow the previously submitted C&D Debris Diversion Plan (refer to Appendix B).

Civilian Contractor Environmental Guide 9

Step

Requirement When required? What is required? Required Submission

During Construction/ Performance (Continued)

Reporting of recycling and disposal of construction and demolition debris

Monthly for contracts greater than 60 days

Refer to Appendix B for guidance.

Submit monthly recycling and disposal numbers to the

Dust control (Air Quality Activity Permit)

Landstripping and/or earthmoving (greater than 1 acre); trenching (greater than 300 feet); road construction (greater than 50 feet); abrasive blasting, crushing/screening, etc.

Follow Air Quality Activity Permit (permit required prior to beginning construction activities).

Prevention

1 acre or more of soil disturbance

Follow SWPP Plan and permit (permit required prior to beginning construction activities).

management of Wastewater

The base maintains a discharge permit with Pima County. Insure any discharge to the sewer meets minimum discharge limits.

Clean water meeting the Stormwater exception rules should not be discharged to the sewer.

Management of Investigation- Derived Waste

(IDW)

Waste generated during environmental investigation field work is termed IDW. IDW must be properly managed.

IDW, such as soil cuttings from borehole drilling and other solid waste generated during environmental investigation activities, must be properly managed at the moment of generation.

Management of IDW must be addressed in the environmental investigation field work plan.

Refer to Appendix D for guidance on the proper management of

IDW.

Submit the work plan

Industrial Ventilation and Confined Space

Always required for industrial ventilation systems

Contractor must ensure that the Contracting Office notifies Bioenvironmental Engineering prior to any industrial ventilation systems (systems which control a hazard) being evaluated for acceptance.

Notify the Contracting Office to schedule close-out survey with Bioenvironmental Engineering.

Civilian Contractor Environmental Guide 10

Step

Requirement When required? What is required? Required Submission

During Construction/ Performance (Continued)

Industrial Ventilation and Confined Space (Continued)

Always required for industrial ventilation systems

Bioenvironmental Engineering needs to observe or perform all tests for any new or renovated systems prior to initial start-up to determine if the system will control the hazard. Bioenvironmental Engineering needs to be present for the tests of fan speed and rotation, and fan motor load, and needs to be present for or conduct tests for air flow in all hoods or branches.

After Performance/ Construction (Prior to

Close-Out)

Recovered Materials Certification Upon Completion of Work

When the total contract cost is greater than $100,000

Certification statement by the contractor indicating the use of Recovered Materials as required by the contract specifications

(FAR 52.223-9).

Submit signed Certification Statement

Prevention Plan (SWPP Plan)

1 acre or more of soil disturbance

After completion of construction project, contractor must submit a Notice of Termination (also known as a NOT) to ADEQ.

Submit NOT to ADEQ Submit copy to the Contracting Office.

Reporting of hazardous material usage

For contracts less than 60 days, report total hazardous material used during the project

For contracts greater than 60 days, report the final months’ hazardous material usage

Refer to Appendix A for guidance.

Submit usage information to the

Civilian Contractor Environmental Guide 11

4. Phone Numbers

Fire Reporting 911 or 228-3333

Security Police 228-6432 or 911

Ambulance 911

Wing Safety Office 228-5558 / 228-4895

Service Contracting Flight 228-5105

Design and Construction 228-4976

DM Environmental Office 228-5372 (Chief)

- 228-4840 (Hazardous Waste)

- 228-5849 (Spills, Storage Tanks)

- 228-4774 (Water, Wastewater, Stormwater)

- 228-4885 (Air Quality)

- 228-3215 (Natural/Cultural Resources)

- 228-6318 (P2, HAZMAT, Green Purchasing)

- 228-5897 (ESOHCAMP, EMS)

- 228-5595 (Installation Restoration)

HAZMART 228-5588

Bioenvironmental Engineering

Flight

228-5369

Civilian Contractor Environmental Guide 12

APPENDIX A

GUIDANCE FOR SUBMISSION OF MATERIAL SAFETY DATA SHEETS

FOR HAZARDOUS MATERIAL (HAZMAT) AND REPORTING OF HAZMAT USAGE

Hazardous Materials: A hazardous material is commonly known as a HAZMAT. OSHA defines a hazardous material as any substance to which exposure “results or may result in adverse affects on the health and safety of employees” or “any chemical which is a physical hazardous or health hazard.” There is no ‘one simple list’ of hazardous materials.

Listed below are the general categories of hazardous materials that require the submission of Material Safety Data Sheets (MSDS) hazardous material usage reporting to the Contracting Office:

Compressed gases (all types) Adhesives Sealants Paints (including aerosols) Lubricants / oils / fuels Welding materials Solvents Chemicals used in testing or as additives Any fluids (except water) added to machinery / government-owned or leased equipment Pesticides/insecticides/rodenticides

1) At least three weeks prior to the start of construction, contractors must provide:

a. An MSDS for each hazardous material to be used during the contract period.

b. A complete “DMAFB AF-EESOH-MIS Contractor Worksheet” included as the first page of the stack of MSDSs(refer to Attachment A-1).

2) After receipt / review of the “DMAFB AF-EESOH-MIS Contractor Worksheet”, and the associated

MSDSs, DMAFB will return to the contractor the “Contractor Hazardous Material Review” sheet (refer to Attachment A-2 for an example).

a. Depending upon the item(s) marked on the “Contractor Hazardous Material Review” sheet, the Contractor may (or may not) have additional submittal requirements.

b. If the Contractor does have additional hazardous material submittal requirements, the submittal(s) must be accomplished before the hazardous material is brought on base.

c. The contractor must receive the “Contractor Hazardous Material Review” sheet from

DMAFB before hazardous material is brought on base.

3) For those hazardous materials that will be tracked (as identified on the “Contractor Hazardous Materials

Review” sheet), the following requirements apply:

a. For contracts less than 60 days, the Contractor will submit the “Contractor Hazardous Material and Usage Data” (refer to Attachment A-3) to the Contracting Office prior to the start of the contracted work, and again at the completion of the contract.

b. For contracts greater than 60 days, the Contractor will submit the “Contractor Hazardous Material and Usage Data” (refer to Attachment A-3) to the Contracting Office prior to the start of the contracted work, once each month of the contract, and at the completion of the contract.

If the contractor needs to bring hazardous material onto the installation that was not included in the original submittal [refer to step 1) above], the contractor must submit the information required in step 1) (above) to the Contracting Office to begin the review process identified in step 2).

Civilian Contractor Environmental Guide 13

ATTACHMENT A-1

DMAFB AF-EESOH-MIS CONTRACTOR WORKSHEET

Fill In All Information – This worksheet is to accompany your MSDS submittals.

NOTE 1: Instructions are located on the back of this page.

NOTE 2: The Contracting Office will forward this worksheet and attached MSDSs to the Project Inspector or QAE.

The Project Inspector or QAE will then forward this worksheet and MSDS to the Contractor HAZMAT Review Subcommittee

1. CONTRACTOR INFORMATION

Prime Contractor Name Subcontractor Name (if applicable)

Contract Number Project Number

Project Title

Estimated Start Date (mm-dd-yyyy) Estimated Completion Date (mm-dd-yyyy)

2. MATERIAL INFORMATION / QUANTITY INFORMATION

Hazardous Material Name (be as specific as possible)

Manufacturer Part # or Item # Container Type/Size (e.g., 5-gallon pail)

Est. amount to be used over duration of contract

3. PROJECT LOCATION AND PROCESS INFORMATION

Physical Location Of Project (Bldg, intersection street names, etc.)

Project Performed at (circle) Existing Facility New Structure Equipment Aircraft Outdoors Indoors Other ______

Describe the Process(es) to be Performed (e.g., spray painting, brush painting, blasting, coating, soldering, welding, construction, demolition, etc.)

Is the Hazardous Material going to be used in an area occupied by USAF military or civilians? (circle one) Yes No

What is the Storage Location Of Staged or Unused Materials?

4. ADDITIONAL INFORMATION (Circle Answer That Applies)

Will a Hazardous, Universal, or PCB Waste be Generated? (See Appendix C)

Yes No Waste Description & disposition (e.g., rags used to wipe off excess adhesive, empty aerosol cans, used sandpaper, etc.)

Is A Site Diagram Available? Yes No

Does the Contractor have the base procedures for reporting a spill?

Yes No

5. SIGNATURES : This Submittal Cannot Be Processed Without Both a Contactor Signature and a Contracting Office Signature

SUB CONTRACTOR Title: Phone: Date Printed Name Signature

PRIME CONTRACTOR Title: Phone: Date Printed Name Signature

CONTRACTING OFFICE Title: Phone: Date Printed Name Signature

Civilian Contractor Environmental Guide 14

ATTACHMENT A-1 (continued)

DMAFB AF-EESOH-MIS CONTRACTOR WORKSHEET INSTRUCTION GUIDE

1. This information is required in order to help the DMAFB track all hazardous materials used on-base.

A worksheet must be filled out for each product containing a hazardous material. All blocks must be filled in.

a. Prime Contractor Name: Fill in the name of the Prime Contractor performing the work.

b. Subcontractor Name: Fill in the name of the Subcontractor. If not applicable – use N/A.

c. Contract Number: Fill in contract number.

d. Project Number: Fill in the project number. If not applicable – use N/A.

e. Project Title: Fill in the title of the project. This is never N/A.

f. Estimated Start Date: Fill in the date the project is projected to start.

g. Estimated Completion Date: Fill in the date the project is projected to end.

2. Material Information: IMPORTANT: The information recorded in this section must match-up to the submitted MSDSs. Refer to Appendix A for examples of common HAZMATs.

a. Hazardous Material Name: Fill in the name of the material to be used. Be as descriptive as possible (e.g., Hi-Gloss Latex Paint #555).

b. Manufacturer: Fill in the manufacturer’s name.

c. Part Number: Fill in the manufacturer’s part number or item number.

d. Container Type/Size: Fill in the container type (e.g., bag, bottle, can, drum, pail, etc.) and the container size (e.g., pound, pint, gallon, etc.).

e. Estimated Quantity to be used: Fill in the amount to be used throughout the duration of the project. For instance, if the project will last three months (project timeframe is recorded in Block 1) and you expect to use 100 gallons each month, then record 300 gallons.

3. Project Location and Process Information: Information about how the products will be used, what the products will be used on, where the project is located, and where the materials will be stored when not in use.

a. Location of Project: Identify in the physical location of where the product will be used.

Example: Building number, intersection street names, etc.

b. Project will be Performed at: Circle all boxes that apply which pertain to where and on what the process that use the hazardous material will occur.

c. Describe the process or process that will be performed during the duration of the work.

d. Is the area occupied by USAF military or civilians: Circle the appropriate response. For instance, if painting will be done in an occupied building – then the correct response is YES.

e. Location of Stored Materials: Identify the physical location of where the material will be stored when not in use.

4. Additional Information:

a. Will the project or processes used in the project create any hazardous waste, universal waste, or PCB waste? Refer to Appendix C for examples of hazardous waste, universal waste, and PCB waste. If any waste will be generated, it must be properly managed from the moment it is generated.

b. Site Diagram Available: Is a site diagram available to identify where the product(s) will be used and stored at the jobsite?

c. Spills: Does the Contractor have a listing of base procedures for reporting a spill?

5. Signatures: This submittal cannot be processed without both a Contactor Signature(s) and a Contracting Office Signature This block must be completed and signed by both parties.

For specific projects, each month a Contractor Hazardous Material Usage Data Sheet must be completed by the contractor and submitted to the Contracting Office for any project over sixty days. Projects less than sixty days are required to turn in a usage data sheet after completion of project. The Contracting Office will forward this information to the Project Inspector or QAE, who will in turn forward the information to the Contractor HAZMAT Review Subcommittee.

Civilian Contractor Environmental Guide 15

ATTACHMENT A-2

DMAFB CONTRACTOR HAZARDOUS MATERIAL REVIEW

TO: 355 CONS/MSCA

FROM: 355 CES/CEAN (Contractor HAZMAT Review Subcommittee)

RE: CONTRACT NUMBER: PROJECT NUMBER:

DATE:

The Contractor HAZMAT Review Subcommittee has received / reviewed the attached AF-EESOH-MIS Contractor Worksheets and associated Material Safety Data Sheets. Documents and the attached packet may require additional action. Please see below comments.

Comment 1 Tagged MSDS(s) need replacing because it is illegible or outdated.

Comment 2 No action required, these items do not require tracking in the EESOH-MIS database.

______ Worksheets are incomplete, additional information required. See comments below.

______ AF-EESOH-MIS Contractor Worksheets must be filled out for each attached MSDS.

Return worksheet and MSDS to the Contracting Office for input into the EESOH-MIS database to create a hazardous material tracking account.

______ The MSDSs that were submitted have been reviewed and information entered into the hazardous materials tracking data base. The attached hazardous materials list will be the items that the Hazardous Material Office will track on a monthly basis using the Contractor Hazardous Material Usage Data worksheet.

If any additional or different types of hazardous materials will be used on this or any future project, MSDSs must be submitted for review.

______ No action needed, documents are complete and will be entered into the hazardous materials tracking database.

Comment 3 Other Comments.

Comment 1A:

RAWL anchors are listed in the 3- ring binder index, but the MSDS for RAWL anchors is missing. If the product is still used, include the MSDS.

Comment 1B: The OXYSEAL MSDS is dated 1993. This MSDS is probably outdated.

Comment 1C: The Purple Rages MSDS was prepared in 1990. The MSDS is outdated. Is this product still used, and if so, what is this product used for?

Comment 2:

Aside from those MSDSs identified in Comment 1, no action is required for the other lists products/MSDSs.

Comment 3

Civilian Contractor Environmental Guide 16

ATTACHMENT A-3

CONTRACTOR HAZARDOUS MATERIAL USAGE DATA

Contractor:_____________________________________ AF-EESOH-MIS Shop Code:___________

Contract/NKAK Number:_______________________

Location:_______________________________

The following information is required for tracking of hazardous materials on-base.

- For purchase orders/contracts LESS than six months, this form is required at start and completion of work.

- For contracts EXCEEDING six months, this form is required to be filed out monthly and submitted to the Contracting Office

The Contracting Office will forward it to HAZMART - Bldg 5227, Attention: Contractor HAZMAT Review Subcommittee. This information is required in order to comply with Environmental Laws and Regulations.

Hazardous Material Name

Manufacturer Part #, NSN #, or

LPN #

Initial Quantity at the start of each project

Additional Quantity Each Month

Submitted by Contractor: ____________________________________________ Date: _________________ (Print) (Sign)

Received by Contracting Office: ______________________________________ Date: _________________ (Print) (Sign)

Civilian Contractor Environmental Guide 17

APPENDIX B

CONSTRUCTION AND DEMOLITION (C&D) DEBRIS

DMAFB is required to report the quantity of waste landfilled and the quantity of waste recycled on a quarterly basis. Because Construction and Demolition (C&D) debris can be a large portion of the waste generated in any quarter, DMAFB encourages the recycling of C&D debris.

Types of C&D debris include, but are not limited to:

Aluminum cans (e.g., soda cans) Asphalt Bricks Cardboard Concrete Drywall Electrical wiring and components Green waste (palm fronds, scrub brush, land clearing debris, etc.)

Landscaping stone Plaster Plumbing fixtures and piping Roof coverings (e.g., shingles or tiles) Metal scraps (from stud trim, ductwork, rebar, piping, roofing, banding, etc.)

Wood (scrap wood)

At least 3 weeks prior to the start of construction, submit the C&D Debris Diversion Plan to the Contracting Office. This plan describes how the contractor will recycle (or dispose) of C&D debris (refer to Attachment B-1 for an example C&D Debris Diversion Plan).

For contracts less than 60 days, the Contractor will submit the “Summary of C&D Debris Recycling and Landfilling” (refer to Attachment B-2) to the Contracting Office prior to the start of the contracted work, and again at the completion of the contract.

For contracts greater than 60 days, the Contractor will submit the “Summary of C&D Debris Recycling and Landfilling” (refer to Attachment B-2) to the Contracting Office prior to the start of the contracted work, each month of the contract, and at the completion of the contract.

It is acceptable to combine the table included in the C&D Debris Diversion Plan and the monthly reporting requirements into one, comprehensive table (as shown in Attachment B-2).

Civilian Contractor Environmental Guide 18

ATTACHMENT B-1

EXAMPLE SUBMITTAL

C&D DEBRIS DIVERSION PLAN

Project Number and Title: FBVN06-A601, Demolish Dormitory

Project Waste Management Coordinator(s): Ms. Jane Doe, Mr. John Smith

Waste Management Project Guidelines

1. This project shall generate the least amount of waste possible by planning and ordering carefully, following proper storage and handling procedures to reduce damaged, expired, and broken materials, and reusing materials wherever possible. Waste materials generated shall be salvaged for donation or resale, or separated for recycling to the extent that is economically feasible.

2. The Waste Management Chart (below) identifies the waste materials expected to be generated on this project, the disposal method for each material, and any handling requirements.

3. Waste diversion activities will be discussed at each safety meeting. Each contractor and subcontractor will receive this WMP and be provided a tour of the job site and shown the containers to be used for recycling or disposal. Each subcontractor will be expected to make sure all work crews comply with the WMP. All containers will be clearly labeled and lists of accepted/unaccepted materials will be posted throughout the site.

Material Anticipated

Quantity for the project

Recycling or Disposal Method Handling Procedure (Good Housekeeping)

Wood cabinets

20 ea.

Donated to ‘Help for the Homeless

Ensure cabinets are not damaged at job site while awaiting transport to donation store.

Green waste (brush)

2 tons

John and Jack’s Crushing Company (to be mulched for reused/resale)

Avoid contamination of green waste with other construction debris

Scrap metal (steel window frames, copper pipe, etc.)

0.5 tons

Western Iron and Metal

Deposit all metals in roll-off labeled “Scrap metal”

Concrete

10 tons

Roadbase Material Recycling (to be crushed for reuse/resale)

To be collected in piles then trucked to the recycling facility

Clean asphalt

Dee’s Inert Landfill

To be trucked to the landfill on the day that it is removed

Aluminum soda cans

10 lbs

Pima County Transfer Station

Avoid contamination of cans with garbage

Remaining wastes (e.g., garbage and material that cannot be recycled)

8 tons

COT Los Reales Landfill

Keep job site free of windblown debris. Remove garbage daily.

Civilian Contractor Environmental Guide 19

ATTACHMENT B-2

EXAMPLE SUBMITTAL

SUMMARY OF C & D DEBRIS RECYCLING AND LANDFILLING

Project Number and Title: FBVN06-A601, Demolish Dormitory

Project Waste Management Coordinator(s): Ms. Jane Doe, Mr. John Smith

Material Anticipated Quantity for the project

Recycling or Disposal Method Handling Procedure (Good Housekeeping)

For the month of

__JUNE_ 20XX_

Project totals to date

Recycled Landfilled Recycled Landfilled

Wood cabinets

20 ea.

Donated to ‘Help for the Homeless’

Ensure cabinets are not damaged at job site while awaiting transport to donation store.

20 ea

20 ea

Green waste (brush)

John and Jack’s Crushing Company (to be mulched for reused/resale)

Avoid contamination of green waste with other construction debris

1.5 ton

Scrap metal (steel window frames, copper pipe, etc.)

Western Iron and Metal

Deposit all metals in roll-off labeled “Scrap metal”

0.5 ton

0.5

Concrete

10 tons

Roadbase Material Recycling (to be crushed for reuse/resale)

To be collected in piles then trucked to the recycling facility

Clean asphalt

Dee’s Inert Landfill

To be trucked to the landfill on the day that it is removed

Aluminum soda cans

10 lbs

Pima County Transfer Station

Avoid contamination of cans with garbage

2 lbs

4 lbs

Remaining wastes (e.g., garbage and material that cannot be recycled)

8 tons

COT Los Reales Landfill

Keep job site free of windblown debris. Remove garbage daily.

1 ton

3 tons

Civilian Contractor Environmental Guide 20

APPENDIX C

HAZARDOUS, PCB, AND UNIVERSAL WASTE:

PROPER MANAGEMENT AND DISPOSAL

Hazardous Waste, PCB, and Universal Waste: The Contractor is required to manage and dispose of hazardous waste, PCB waste, and universal waste in accordance with local, state, and federal laws. It is the Contractor’s responsibility to determine whether any of these wastes will be generated by a particular project and to properly manage such wastes.

Listed below are examples of wastes which can be hazardous waste (this list is not all inclusive):

Acids or caustics Adhesives, calks, roofing cements Empty aerosol cans Items that contain lead (such as lead flashing, lead solder, lead-based paint chips) Items that contain mercury (such as mercury switches, mercury thermostats, fluorescent bulbs) Paints, varnishes, and sealers Pesticides, insecticides, and rodenticides Waste solvents, thinners, cleaners, and fuels Sandpaper, sand blasting residue Rags, gloves, coveralls, masking paper contaminated with hazardous materials.

The following table presents a list of questions that the Contractor may use to help identify whether their work will be generating a hazardous, PCB, or universal waste (these questions are not all inclusive).

What processes will be performed during the project?

Potential Regulated Waste

Will any paint be chipped, sanded, abraded, or chemically removed?

Many paints and primers contain lead, cadmium, or chromium, and these paint residues and sandpaper may be RCRA toxic for heavy metals.

Will any flammable paints, varnishes, cements, adhesives, or other coatings be used?

Many flammable coatings & adhesives contain methyl ethyl ketone (synonyms are MEK & 2-butanone) and brushes, rags, etc. contaminated with these may be RCRA toxic for MEK.

Additionally, if these are to be disposed in liquid form they may be RCRA ignitable.

Will any chemicals be used to clean or strip surfaces?

Many solvents (e.g., chlorinated solvents, benzene, toluene, MEK, xylene, etc.)

are hazardous and the stripping residues along with rags and applicators may be RCRA listed spent solvent wastes.

Corrosive strippers (acids, alkalis, etc.) may be RCRA corrosive if disposed in liquid form.

Depending on what is being removed, the residues may also contain RCRA toxic heavy metals.

Will any aerosol cans be used?

Empty aerosol cans are regulated as RCRA reactive.

Non-empty aerosol cans that are disposed may also be RCRA ignitable.

Will any fluorescent lamps be removed?

Fluorescent lamps contain mercury and are regulated as Universal Waste (No Bulbs may be disposed of in trash receptacles).

Will any electronic equipment be removed (equipment containing circuit boards, switches, thermostats, transformers, soldered parts, CRTs, etc.)?

Some types of equipment may contain heavy metals and be RCRA toxic for mercury, lead, or silver.

Transformers and lamp ballasts may contain Polychlorinated Biphenyls (PCBs).

Some types of equipment may contain batteries that have RCRA toxic metals or are RCRA corrosive or are regulated as Universal Waste.

Will all unused hazardous materials be removed by the contractor at job completion?

Full or partially full containers that are to be disposed may be RCRA wastes.

RCRA wastes must be removed by a licensed hazardous waste transporter and accompanied by a hazardous waste manifest.

Civilian Contractor Environmental Guide 21

APPENDIX D

INVESTIGATION-DERIVED WASTE (IDW):

PROPER MANAGEMENT AND DISPOSAL

Investigation-derived waste (IDW) is often generated during environmental investigation field work. IDW can include (but is not limited to) drill cuttings, excess soil sampling material, and concrete fragments or building materials encountered during investigation activities. IDW also includes personal protective equipment (PPE), and sampling equipment decontamination wash waters and rinse waters.

IDW – Proper Management IDW must be properly managed from the moment of generation. IDW may be accumulated/collected in roll-off bins or drums (as appropriate). Bins must be covered to prevent stormwater intrusion and to prevent IDW from becoming windblown. Alternatively, it is permissible to lay down plastic sheeting (with bermed sides) on which the IDW can be placed. Again, the bermed area must be covered to prevent stormwater intrusion and to the IDW from becoming windblown.

IDW decontamination wash waters and rinse waters are to be contained and allowed to evaporate from the containment.

IDW PPE must be containerized (for example “bagged”) for proper disposal.

IDW – Proper Sampling IDW must be properly sampled to determine the appropriate method of disposal. Waste soil is usually tested for potential listed and characteristic hazardous waste properties. Composite samples of IDW (for instance petroleum contaminated soil or drill cuttings) are often acceptable.

There is no need to sample IDW wash waters and rinse waters as these are containerized and allowed to evaporate.

Unless PPE is extremely contaminated, there is no need to sample IDW PPE.

IDW – Proper Disposal The appropriate avenue for disposal of IDW (for instance soil, drill cuttings, or concrete fragments) is determined based upon the sample analytical results. Non-hazardous IDW is suitable for disposal at a municipal or solid waste landfill (such as the Southwest Regional Landfill in Buckeye Arizona or Los Reales in Tucson). IDW PPE is normally disposed of as solid waste.

Hazardous IDW must be disposed at a RCRA permitted facility. Hazardous IDW must be manifested off-site. It may be possible to arrange for the DM Environmental Office to sign the IDW hazardous waste manifest.

Civilian Contractor Environmental Guide 22

APPENDIX E

ENVIRONMENTAL MANAGEMENT SYSTEM (EMS)

MOST SIGNIFICANT ENVIRONMENTAL ASPECTS AWARENESS FORM

Each of the installation's activities and services are reviewed to identify associated environmental aspects. The environmental aspects identified for each activity and service is then summarized for the entire installation. The identified environmental aspects are prioritized using a risk rating matrix to determine which aspects are considered significant. These significant aspects are reviewed and adjusted as needed. Below is a list of the current significant aspects and the installations objectives to minimize the impact of these aspects.

Significant Environmental Aspects

Objective

1. Withdrawal and use of water for domestic and industrial processes

Reduce water intensity by 2% per year beginning in FY08 using FY07 as a baseline

2. Withdrawal and use of electrical power for domestic and industrial processes

Decrease the amount of electrical power used for domestic and industrial processes

3. Generation/Discharge of wastewater contaminated with oil/grease, solids, cleaning compounds, or metals to sanitary sewer

Reduce the generation/discharge of wastewater contaminated with oil/grease, solids, cleaning compounds, or metals to sanitary sewer

4. Potential release of POLs to land

Reduce the potential to release POLs to the land from the Storage, Use and Transfer of POLs

5. Potential particulate emissions from travel and parking in unpaved areas.

Reduce the potential emissions caused from parking and traveling on unimproved area

6. Noise from Aircraft Operations

Continue to enhance community relationship in relation to aircraft noise

7. Stormwater contamination associated with industrial activities.

Reduce stormwater contamination associated with industrial activities

DEFINITIONS:

Environmental Aspect - an element of an organization's activities, products and services that can interact with the environment (adopted from the ISO 14001 standard)

Environmental Impact - any change to the environment, whether adverse or beneficial, wholly or partially resulting from an organization's activities, products or services (adopted from the ISO 14001 standard)

Significant Environmental Aspect - an environmental aspect that has or can have a significant impact on human health or the environment

I accept full responsibility for the actions of all personnel hired on this project and will ensure they receive a thorough briefing on these procedures and initial EMS Awareness training as applicable.

Contractor’s Printed Name and Signature email Address

Project Name/Company Name Contract Start/Contract Number

Contract Administrator’s Signature Date

Civilian Contractor Environmental Guide 23

APPENDIX F

ENVIRONMENTAL, SAFETY, OCCUPATIONAL HEALTH TRAINING NETWORK

(ESOHtn) LOG ON AND REGISTRATION INSTRUCTIONS

To access and register to the ESOH Training Network:

Go to www.esohtn.com

Click on the to enter, then

Choose Air Combat Command

At the next screen, click on Enter

Find the Registration box on the bottom right side of the screen.

Type “esohtn” into the Registration Password box

Click on Create an Account, and

Follow the instructions on each screen to complete each step of the registration process all blocks with an “ * “ must be filled.

Step 1. First and Last Name and email address

Step 2 Account information User Id and password

Step 3 User Type Select “Construction Contractor “or “Non‐Construction” Next

Step 4 Organization information, Select “Davis‐Monthan”, your company name if listed, if not listed select “Company not Listed”. Select contractor number if applicable—Next.

Step 5 Under Job Functions select “EMS Awareness Level Training”‐‐Next

Step 6 Select “ I agree”

Step 7 Select “Go To Training”

Step 8 Select “Go to my Training Modules”

Step 9 Select “Go to training” and complete training, complete test and print certificate

When training is complete forward certificate to contract administrator.

Civilian Contractor Environmental Guide 24

APPENDIX G

Management System (eMS) Awareness Guide

The environmental Management System (eMS)

Awareness Guide

This guide contains the essential information about the installation eMS you should know.

Civilian Contractor Environmental Guide 25

Three things every airman, civilian employee, and contractor at Davis-Monthan must know about eMS.

1. Know that eMS is the Management System we use to implement the 355th Fighter Wing Commander’s Environmental Policy.

2. Know the basic contents of the Policy Letter (refer to the policy on the back of this page)

Commitment to continual improvement

Commitment to pollution prevention

Promote the conservation and sustainable use of our natural resources

Periodically review and update goals

3. Know the environmental impacts of your job!

Know the possible causes of environmental impacts from the activities you perform and manage your activities using proper procedures.

If you have been designated to perform an activity that could result in a significant environmental impact, you must know how to properly manage that activity.

Significant environmental impacts are those impacts designated by leadership and…