Atch_14_AFI_32-1044_Visual_Air_Navigation_Systems.pdf
PDF 238 KB Posted
- Attached to
- Nellis AFB Multiple Award Construction Contract (MACC) Solicitation Federal contract opportunity
- Solicitation number
- FA4861-16-R-A100
About this file
Atch 14_AFI 32-1044_Visual Air Navigation Systems
View the file
Other files for this federal contract opportunity
Show all 50
Nellis AFB Multiple Award Construction Contract (MACC) Solicitation has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BY ORDER OF THE
SECRETARY OF THE AIR FORCE
AIR FORCE INSTRUCTION 32-1044
24 DECEMBER 2014
Civil Engineering
VISUAL AIR NAVIGATION SYSTEMS
COMPLIANCE WITH THIS PUBLICATION IS MANDATORY
ACCESSIBILITY: Publications and forms are available for downloading or ordering on the e-
Publishing website at www.e-Publishing.af.mil.
RELEASABILITY: There are no releasability restrictions on this publication.
OPR: AF/A4CX
Supersedes: AFI32-1044, 29 May 2013
Certified by: AF/A4CX
(Col Valerie L. Hasberry)
Pages: 9
This instruction implements Air Force policy directive (AFPD) 32-10, Installations and
Facilities. It defines requirements and establishes standards for all visual air navigation facilities at U.S. Air Force facilities within the continental United States (CONUS) and at overseas locations supporting Air Force flight operations. The airfield lighting systems engineer at Air
Force Civil Engineer Center, Operations Directorate (AFCEC/CO), is the primary point of contact for definitions and guidance contained within this instruction. Use this instruction when programming, designing, constructing, and installing visual air navigation systems and related facilities. Consult Unified Facilities Criteria (UFC) 3-535-01, Visual Air Navigation Facilities, for detailed information on standard configurations and equipment. This instruction applies to
Air Force Reserve Command (AFRC) and Air National Guard (ANG) units. This publication may be supplemented at any level, but all direct Supplements must be routed to the Office of
Primary Responsibility (OPR) of this publication for coordination prior to certification approval.
The authorities to waive wing/unit level requirement in this publication are identified with a Tier
(“T-0, T-1, T-2, T-3”) number following the compliance statement. See AFI 33-360, Publications and Forms Management, for a description of the authorities associated with the Tier numbers. Submit requests for waivers through the chain of command to the appropriate Tier waiver approval authority, or alternately, to the Publication OPR for non-tiered compliance items. Refer recommended changes and questions about this publication to the OPR using the
AF Form 847, Recommendation for Change of Publication; route AF Forms 847 from the field through the appropriate functional chain of command. Ensure that all records created as a result of processes prescribed in this publication are maintained in accordance with Air Force Manual
(AFMAN) 33-363, Management of Records, and disposed of in accordance with the Air Force http://www.e-publishing.af.mil./
2 AFI32-1044 24 DECEMBER 2014
Records Disposition Schedule (RDS) located in the Air Force Records Information Management
System (AFRIMS). The use of the name or mark of any specific manufacturer, commercial product, commodity, or service in this publication does not imply endorsement by the Air Force.
SUMMARY OF CHANGES
This document has been substantially revised and must be completely reviewed. Major changes include the addition of Tier levels as required by AFI 33-360. Guidance in this publication is based on requirements prescribed by 14 CFR Part 77, Safe, Efficient Use, and Preservation of the
Navigable Airspace, and 14 CFR, Part 91, General Operating and Flight Rules.
1. PURPOSE. This instruction defines requirements for all visual air navigation systems at Air
Force facilities. See UFC 3-535-01 for standard configurations and approved equipment characteristics.
2. BACKGROUND.
2.1. The term “visual air navigation systems” refers to lights, signs, symbols, and other devices and/or systems located on and in the vicinity of an airfield that provide visual reference and guidance to pilots when operating aircraft on the ground and in the air. They supplement the guidance provided by markings and electronic aids such as tactical air navigation (TACAN), precision approach radar (PAR), and instrument landing system (ILS) for operating aircraft.
2.2. Visual air navigation systems must be standardized for operational safety.
Standardization requires lights with the same intended use to be identical in color and configuration at each airfield (refer to UFC 3-535-01 for specific requirements) to enable pilots to interpret the guidance readily, with assurance of accuracy and minimal distraction.
3. APPLICATION. Use this instruction and its complement, UFC 3-535-01, for planning, design, construction, sustainment, restoration, and modernization of new visual air navigation systems at Air Force installations, fields, ranges, and expeditionary locations. Do not install visual air navigation equipment or configurations not covered in this instruction and UFC 3-535-
01 without an appropriate waiver. (T-0)
4. RESPONSIBILITIES.
4.1. Air Force Director of Civil Engineers (AF/A4C). Establishes policies for visual air navigation systems at Air Force facilities.
4.2. Air Force Civil Engineer Center (AFCEC). Establishes technical requirements through unified facilities criteria (UFC), in accordance with mission requirements and enforces UFCs and AF policies for visual air navigation systems. Clarifies intent of AF policies and provides final interpretation of UFCs, as they apply to Air Force systems, for Air
Force and Air National Guard installations. (T-1)
4.3. Base Civil Engineer (BCE). (T-1)
4.3.1. Maintains airfield lighting and associated grounding systems, in accordance with
UFC, NEC and Federal Aviation Administration requirements. (T-0)
AFI32-1044 24 DECEMBER 2014 3
4.3.2. Performs required testing to validate condition of air navigation systems. Tests may be used as justification for replacement of systems or subsystems. (T-1)
4.3.3. Programs projects necessary to construct, maintain, or repair visual air navigation systems. (T-1)
4.3.4. Provides inspection of completed projects to validate contract compliance, prior to project acceptance. (T-1)
5. BASE RIGHTS. Construction of an airfield in a foreign country requires a grant of operational control which normally is accomplished pursuant to an international agreement (as defined in Department of Defense Directive (DODD) 5530.3, International Agreements) with the host nation. This agreement may take the form of a Defense Cooperation Agreement, a Base
Rights Agreement, an Implementing Agreement, a Host Nation Funded (Construction)
Agreement (HNFA), a Bilateral Infrastructure Agreement (BIA), or an agreement by a different title. Provisions of these agreements must be observed, but in instances where construction does not conform to international standards or standards of the host nation, seek legal advice. Many of these agreements require the United States to consult with and/or obtain approval from the host nation before beginning construction. An HNFA allocates the responsibilities for construction funding between the United States and the host nation. NATO members execute
BIAs, which are financed by mutual agreement among the parties to the BIA. If it appears a new international agreement will be necessary, follow the procedures outlined in DODD 5530.3 and
AFI 51-701, Negotiating, Concluding, Reporting, and Maintaining International Agreements.
Seek legal advice prior to taking any action that could result in an international agreement. (T-0)
6. VISUAL AND ELECTRONIC AIDS. Air Force installations will use visual air navigation aids and associated electronic aids for operational categories outlined in Tables 1 and 2 within
Attachment 2, Visual Landing Aids Requirements. (T-0 for all “R” required aids and T-1 for all other aid determinations as noted within Tables 1 and 2)
JUDITH A. FEDDER, Lieutenant General, USAF
DCS/Installations, Logistics, & Mission Support
4 AFI32-1044 24 DECEMBER 2014
Attachment 1
GLOSSARY OF REFERENCES AND SUPPORTING INFORMATION
References
14 CFR Part 77, Safe, Efficient Use, and Preservation of the Navigable Airspace, (last reviewed on 21 July 2010)
14 CFR Part 91, General Operating and Flight Rules, (last reviewed on 22 April 2014)
DODD 5530.3, International Agreements, 11 June 1987
AFI 13-213, Airfield Management, 29 January 2008
AFI 33-360, Publications and Forms Management, 25 September 2013
AFMAN 11-225_IP, United States Standard Flight Inspection Manual, 1 October 2005
AFMAN 33-363, Management of Records, 1 March 2008
AFPD 13-2, Air Traffic, Airfield, Airspace, and Range Management, 7 August 2007
AFPD 32-10, Installations and Facilities, 4 Mar 2010
UFC 3-535-01, Visual Air Navigation Facilities, 17 November 2005
Prescribed Forms
AF Form 847, Recommendation for Change of Publication, 22 September 2009
Adopted Forms
None.
Abbreviations and Acronyms
AC—advisory circular
AF/A3O—AOA—Director of Operations, Air Force Operations Group
AFCEC—Air Force Civil Engineer Center
AFCEC/CO—Air Force Civil Engineer Center, Operations Directorate
AFFSA/A3A—Air Force Flight Standards Agency, Airspace Ranges and Airfield Operations
AFI—Air Force Instruction
AFMAN—Air Force Manual
AFPD—Air Force Policy Directive
AFRC—Air Force Reserve Command
AFRIMS—Air Force Records Information Management System
AFSEC/SEFF—Air Force Safety Center Aviation Safety Branch
AHJ—Authority Having Jurisdiction
AIR STD—Air and Space Interoperability Council Air Standard
AFI32-1044 24 DECEMBER 2014 5
ALSF—1—Approach Lighting System with Sequenced Flashing Lights for Category I
Meteorological Conditions
ALSF—2—Approach Lighting System with Sequenced Flashing Lights for Category II
Meteorological Conditions
ANG—Air National Guard
ASIC—Air and Space Interoperability Council
BCE—Base Civil Engineer
BIA—Bilateral Infrastructure Agreement
CFR—Code of Federal Regulations
CONUS—continental United States
DODD—Department of Defense Directive
FAA—Federal Aviation Administration
HAPI—helicopter approach path indicator
HIRL—high intensity runway edge lights
HNFA—Host Nation Funded (Construction) Agreement
ICAO—International Civil Aviation Organization
IAW—in accordance with
ILS—instrument landing system
IMC—instrument meteorological conditions
IP—Interservice Publication
LED—light-emitting diode
MAJCOM—Major Command
MALSR—medium intensity approach light system
MAS—Military Agency for Standardization
MIRL—medium intensity runway edge lights
MLS—microwave landing system
NA—not applicable
NATO—North Atlantic Treaty Organization
OPR—Office of Primary Responsibility
OPT—optional
PAPI—precision approach path indicator
PAR—precision approach radar
R—required
6 AFI32-1044 24 DECEMBER 2014
RCL—runway centerline lights
RDM—runway distance markers (or distance remaining markers (DRM))
REIL—runway end identifier lights
RVR—runway visual range
SALS—short approach lighting system
SSALR—simplified short approach system
STANAG—Standardization Agreement
TACAN—tactical air navigation
TDZL—touchdown zone lights
TERPS—terminal instrument procedures
UFC—Unified Facilities Criteria
VFR—visual flight rules
VMC—visual meteorological conditions
VORTAC—Very High Frequency Omnidirectional Range with TACAN
Terms
Bilateral Infrastructure Agreement (BIA)—An agreement relative to infrastructure which concerns two NATO members and is financed by mutual agreement between them (e.g., facilities required for the use of forces of one NATO member in the territory of another).
Host Nation Funded Construction Agreement (HNFA)—An agreement between the United
States and its host nation that outlines the responsibilities for funding construction on that installation.
Instrument Runway—A runway served by non-visual aids giving directional guidance adequate for a straight-in approach. It may be further classified as:
Category I Precision Approach Runway—A runway served by an ILS, a Microwave Landing
System (MLS), or a precision approach radar (PAR) and visual aids intended for operations down to 60 meters (200 feet) decision height, and down to a runway visual range (RVR) on the order of 720 meters (2400 feet). These criteria also apply to visual lighting aids supporting Air
Force PAR approaches down to a decision height of 30 meters (100 feet) and an RVR on the order of 360 meters (1200 feet).
Category II Precision Approach Runway—A runway served by an ILS or a MLS, or a PAR and visual aids intended for operations down to 30 meters (100 feet) decision height and down to an RVR on the order of 360 meters (1200 feet).
Category III Precision Approach Runway—A runway served by ILS or MLS (no decision height being applicable) and:
Category IIIa—By visual aids intended for operations down to an RVR on the order of 210 meters (700 feet).
AFI32-1044 24 DECEMBER 2014 7
Category IIIb—By visual aids intended for operations down to an RVR on the order of 45 meters (150 feet).
Category IIIc—Intended for operations without reliance on external visual reference.
Nonprecision Instrument Approach Runway—A runway served by a nonprecision aid (such as TACAN or Very High Frequency Omnidirectional Range with TACAN [VORTAC]) providing directional guidance adequate for a straight-in approach.
Joint—use Airfields—Military airfields that allow general aviation use or airfields for which a joint use agreement granting equal privileges has been executed by both parties.
8 AFI32-1044 24 DECEMBER 2014
Attachment 2
VISUAL LANDING AIDS REQUIREMENTS
Table 1. Visual Landing Aids Requirements for Airfields. Note: This table does not apply to expeditionary or contingency airfield lighting systems.
Facility
Operational Category
Night
Non-
VMC Precision I II III
APPROACH AIDS
High Intensity Approach Light System (ALSF-1) NA NA R(1) NA NA High Intensity Approach Light System (ALSF-2) NA NA NA R R Short Approach Light (SALS) NA OPT NA NA NA Simplified Short Approach Light (SSALR)
(1)
NA OPT OPT NA NA
Medium Intensity Approach Light System (MALSR)
(1)
NA
NA
OPT NA NA
Precision Approach Path Indicator (PAPI) R(2) R(2) OPT NA NA
RUNWAY AIDS
High Intensity Runway Edge Lights (HIRL)
(8) R R R R R
Medium Intensity Runway Edge Lights (MIRL) (9)
OPT OPT OPT NA NA
Threshold Lights R R R R R Runway End Lights R R R R R Runway Distance Markers (RDM) R R R R R Runway Centerline Lights (RCL) NA NA NA R R Touchdown Zone Lights (TDZL) NA NA NA R R
TAXIWAY AIDS
Taxiway Edge Lights R R R R R Taxiway Centerline Lights NA NA NA OPT R Taxiway Clearance Bar (Hold Point) NA NA NA OPT OPT Runway Guard Lights – Elevated, FAA Type L-804 Runway Guard Lights – Inset, FAA Type L-852G
OPT
OPT
OPT
OPT
OPT
OPT
R
OPT
R R
Runway Exit Lights Runway Stop Bar
OPT
OPT
OPT
OPT
OPT
OPT
OPT
OPT
R R
Guidance Signs (Information) (6)
R R R R R Guidance Signs (Mandatory)
(6) R R R R R
MISCELLANEOUS AIDS
Airfield Rotating Beacons R R R R R Wind Cones OPT OPT OPT NA NA Obstruction Lights
(7) R R R R R
Emergency Power (3)
Apron Area Flood Lighting
(5)
Apron Edge Lights
R R R
R R R
R R R
R R R
R R R
Legend:
R Required.
OPT Option as recommended by the installation commander and approved by the MAJCOM.
NA Not applicable. Not part of the standard configuration for this system, IAW FAA requirements for this type system.
(1) MAJCOM approval is required to substitute MALSR or SSALR for an ALSF-1.
(2) Required only on primary runways.
AFI32-1044 24 DECEMBER 2014 9
Facility
Operational Category
Night
Non-
VMC Precision I II III
(3)
(4)
(5)
(6)
(7)
(8)
(9)
Emergency power required for all “R” equipment.
Wind direction indicators are required to meet ICAO Annex 14 (para. 5.1.1.1)
Flood lighting is not required for night operations (refueling, loading, maintenance, etc.).
All guidance signs are internally lighted.
LED Obstruction Lights are not approved for use on Air Force installations
High intensity LED Runway Edge Lights are not approved for use on AF installations
Medium intensity LED Runway Edge Lights require AF approval prior to project programming and installation.
Table 2. Visual Landing Aids Requirements for Helipads.
FACILITY
Helipad
Helicopter Runway Precision
Instrument Category I
VMC IMC
Day Non-
Instrument
Night No-
Instrumen t
Non- Precision
Instrument
Precision Instrument Category I
Perimeter Lights NA R - - - Approach Direction
Lights
NA OPT
Landing Direction Lights NA OPT - - - Approach Lights Category
I
NA NA
Floodlights NA OPT - - - Visual Glide Slope
Indicator System
NA OPT
Obstruction Lighting R R - - - Identification Beacon R R - - - Apron Flood Lighting NA OPT - - - Apron Edge Lighting NA OPT - - - Wind Direction Indicator R
(1) R - - -
Emergency Power (2)
NA R - - -
Legend:
R Required OPT Optional NA Not applicable. Not part of the standard configuration for this system, IAW FAA requirements for this type system.
(1) Not lighted for DAY VMC.
(2) Emergency power required for all “R” equipment.
File details come from the government source that posted it. Updated .