RKMF 09-0070 Submittal Register.pdf

PDF 1 MB Posted

Attached to
Repair Data Lab & FTI Building 423
Solicitation number
FA4861-10-R-A029
Issued by

About this file

Atch 2 Schedule of Material Submittals

View the file

Other files

File Type Posted
FA486110BA029-0002.pdf PDF
FA486110BA029-0001.pdf PDF
Atch3_TechSpecs.pdf PDF
UFC 3-580-01 Telecommunications.pdf PDF
FA486110BA029_Nellis_DataLab_IFB.pdf PDF
Atch2_SOW.pdf PDF
UFC 4-010-01 Antiterrorism Standards.pdf PDF
Atch5_FinancialForm.pdf PDF
UFC 3-600-01 Fire Protection.pdf PDF
38EIGHB33-01a.pdf PDF
Bldg 423 Environmental Investigation Report.pdf PDF
ETL_02-12 1 .pdf PDF
Atch4_Dwgs.pdf PDF
UFC 4-021-01 Mass Notification.pdf PDF
Atch1_WageRate.pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 40 PAGES

Repair Data Lab & FTI Facility, Bldg. 423, Nellis AFB

01 33 00 SD-01 Preconstruction Submittals 1.9Submittal register

03 30 53 SD-03 Product Data 2.1.3.1Air-Entraining Admixture 2.1.3.2Accelerating Admixture 2.1.3.3Water-Reducing or Retarding

Admixture 2.1.11Curing Materials 2.1.5Reinforcing Steel 2.1.6Expansion Joint Filler Strips, Premolded 2.1.7Joint Sealants - Field Molded

Sealants Batching and Mixing Equipment

3.2Conveying and Placing Concrete Concrete Placement

2.2Ready-Mix Concrete 2.2Mix Design Data 2.2Air-Entraining Admixtures 2.2Fly Ash 2.3Steel Reinforcement 2.5.2Curing Compound

SD-06 Test Reports 2.1.2Aggregates 1.3.3Concrete Mixture Proportions 3.10Compressive Strength Testing

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

Attachment #2 Schedule of Material Submittals

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 40 PAGES

03 30 53 3.10Slump SD-07 Certificates

2.1.1Cementitious Materials CPG for recycled materials or appropriate Waiver Form

2.1.2Aggregates 04 20 00 SD-06 Test Reports

1.4.1 GMasonry Inspector Qualifications

SD-08 Manufacturer’s Instructions

2.4.3Masonry Cement 05 40 00 SD-07 Certificates

1.4Load-bearing cold-formed metal framing

3.1.1Welds 06 61 16 SD-06 Test Reports

2.1Solid polymer material 08 11 13 SD-02 Shop Drawings

2.1Doors 2.1Doors 2.5Frames 2.5Frames 2.4Accessories 2.7Weatherstripping

SD-03 Product Data 2.1Doors 2.5Frames

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 40 PAGES

08 11 13 2.4Accessories 2.7Weatherstripping

SD-04 Samples 2.9.4Factory-applied enamel finish

08 51 13 SD-02 Shop Drawings 2.1Windows

SD-04 Samples Finish Samples

08 71 00 SD-02 Shop Drawings 1.3Hardware schedule 2.3.6Keying system

SD-03 Product Data 2.3Hardware items

SD-08 Manufacturer’s Instructions 3.1Installation

SD-11 Closeout Submittals 1.4Key Bitting

08 91 00 SD-02 Shop Drawings 1.4Wall louvers 1.5Wall louvers

SD-03 Product Data 2.2Metal Wall Louvers

09 29 00 SD-03 Product Data 2.1.4Cementitious backer units 2.1.7Accessories 2.1.1Gypsum Board

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 40 PAGES

09 29 00 2.1.5Joint Treatment Materials 1.5.1Local/Regional Materials

SD-08 Manufacturer’s Instructions 2.1Material Safety Data Sheets

SD-10 Operation and Maintenance Data

2.1Manufacturer maintenance instructions

3.8Waste Management SD-11 Closeout Submittals

1.5.1Local/Regional Materials 2.1.1Gypsum Board

09 51 00 SD-02 Shop Drawings 1.3Approved Detail Drawings

SD-03 Product Data Acoustical Ceiling Systems

SD-06 Test Reports Ceiling Attenuation Class and Test

SD-07 Certificates 2.1Acoustical Units

Acoustic Ceiling Tiles 09 65 00 SD-03 Product Data

2.8Resilient Flooring and Accessories

2.4Adhesives

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 40 PAGES

09 65 00 2.1Vinyl Composition Tile 2.2Wall Base

Material Safety Data Sheets

(MSDS)

SD-06 Test Reports 3.3Moisture, Alkalinity and Bond

Tests SD-08 Manufacturer’s Instructions

3.2Surface Preparation 3.1Installation

SD-10 Operation and Maintenance Data

2.8Resilient Flooring and Accessories

09 68 00 SD-03 Product Data 2.1Carpet 3.1Surface Preparation

Warranty SD-04 Samples

2.1Carpet SD-07 Certificates

2.1Carpet 1.4Regulatory Requirements

SD-10 Operation and Maintenance Data

2.1Carpet

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 40 PAGES

09 68 00 3.3Cleaning and Protection Maintenance Service

09 69 13 SD-05 Design Data 1.3Compliance with ICC-ES AC300

Seismic Calculations 09 90 00 SD-07 Certificates

1.3Applicator's qualifications 1.4.1.2Qualification Testing

SD-08 Manufacturer’s Instructions Application instructions

3.5.2Mixing 1.7.2Manufacturer's Material Safety

Data Sheets 10 14 02 SD-10 Operation and Maintenance

Data 3.1Approved Manufacturer's

Instructions 10 28 13 SD-07 Certificates

2.2Accessory Items 13 48 00.00 10 SD-02 Shop Drawings

Coupling and Bracing 3.1Flexible Couplings or Joints 1.3Equipment Requirements

1.2.4 GContractor Designed Bracing

SD-03 Product Data GCoupling and Bracing

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 40 PAGES

13 48 00.00 10 1.3 GEquipment Requirements

1.2.4 GContractor Designed Bracing

SD-07 Certificates 2.2Flexible Ball Joints

21 13 13.00 10 SD-02 Shop Drawings

1.4.3 GShop Drawings

3.8As-Built Drawings

SD-03 Product Data 1.4.1Fire Protection Related

Submittals

2.3 GMaterials and Equipment

1.6Spare Parts

3.7 GPreliminary Tests

3.8 GFinal Acceptance Test

3.9 GOnsite Training

1.4.1 GFire Protection Specialist

1.4.2 GSprinkler System Installer

SD-05 Design Data

1.4.3 GSway Bracing

1.2.1.3 GHydraulic Calculations

SD-06 Test Reports

3.8 GPreliminary Test Report

3.8 GFinal Acceptance Test Report

SD-07 Certificates

3.3 GInspection by Fire Protection

Specialist

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 40 PAGES

21 13 13.00 10 SD-10 Operation and Maintenance Data

3.9Operating and Maintenance Instructions

22 00 00 SD-02 Shop Drawings 3.9.1Plumbing System

SD-03 Product Data Environmental Data

2.1Materials 2.4Fixtures 2.4.1Flush valve water closets

Flush valve urinals 2.4.2Countertop lavatories 2.4.3Kitchen sinks 2.4.4Mop Sink 2.4.5Drinking-water coolers

Emergency eye wash & shower 2.9Water heaters

Pulse Power Water treatment system

2.10Pumps 3.9.1.1Backflow prevention assemblies 1.5.1Welding 3.4Vibration-Absorbing Features 3.9.1Plumbing System

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 40 PAGES

22 00 00 3.9Tests, Flushing and Disinfection 3.9.1.1Test of Backflow Prevention

Assemblies SD-07 Certificates

1.3Materials and Equipment 2.1.1Bolts

SD-10 Operation and Maintenance Data

3.9.1Plumbing System 22 05 48.00 20 SD-02 Shop Drawings

2.7Inertia bases 2.6Machinery bases 2.6Platforms 2.6Rails 2.6Saddles

SD-03 Product Data 2.3Isolators 2.8Flexible connectors 2.9Flexible duct connectors 2.11Pipe guides 2.10Seismic snubbers 3.1.3Vertical stops 2.12Thrust restraints 2.7Inertia bases 2.6Machinery bases

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 40 PAGES

22 05 48.00 20 3.1.13Machinery foundations and subbases

2.6Platforms 2.6Rails 2.6Saddles 1.4.2Machinery manufacturer's sound data SD-05 Design Data

2.7Inertia bases 2.6Machinery bases 2.6Platforms 2.6Rails 2.6Saddles 1.4.3machinery 1.4.4machinery over 300 pounds

SD-06 Test Reports 2.10Seismic snubbers 3.2.3.1Equipment vibration tests 3.2.3.2Equipment sound level tests 2.4Protected spring isolators

SD-08 Manufacturer’s Instructions 3.1.1Vibration and noise isolation components 2.13Seismic protection components

22 07 19 SD-02 Shop Drawings 3.1Installation Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 40 PAGES

22 07 19 SD-03 Product Data 2.2Adhesives 2.6Coatings

Insulating Cement 2.1Insulation Materials 2.5Jacketing 2.7Tape

SD-08 Manufacturer’s Instructions 2.1Insulation Materials

23 00 00 SD-02 Shop Drawings 1.4.5Detail Drawings

SD-03 Product Data 2.1Standard Products 2.9.1.1Metallic Flexible Duct 2.9.1.2Insulated Nonmetallic Flexible

Duct Runouts 2.9.1.2Duct Connectors 2.9.2.1Duct Access Doors 2.9.2.2Manual Balancing Dampers 2.9.2.3Automatic Smoke-Fire Dampers 2.9.5Sound Attenuation Equipment

Acoustical Duct Liner 2.9.6.1Diffusers 2.9.6.2Registers and Grilles 2.9.7Louvers

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 40 PAGES

23 00 00 Air Vents, Penthouses, and Goosenecks

2.10.1.1In-Line Centrifugal Fans Room Fan-Coil Units

2.11.1.1Variable Volume, Single Duct Terminal Units

Test Procedures 1.2.1Diagrams 3.14Operation and Maintenance

Training SD-06 Test Reports

3.12Performance Tests 3.14Performance Tests 3.10Damper Acceptance Test

SD-07 Certificates 1.4.1Bolts

SD-08 Manufacturer’s Instructions 3.2Manufacturer's Installation

Instructions 3.14Operation and Maintenance

Training SD-10 Operation and Maintenance Data

3.14Operation and Maintenance Manuals

2.9.2.2Manual Balancing Dampers

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 40 PAGES

23 00 00 2.9.2.3Automatic Smoke-Fire Dampers 2.10.1.1In-Line Centrifugal Fans

Room Fan-Coil Units 2.11.1.1Variable Volume, Single Duct

Terminal Units 23 05 15 SD-01 Preconstruction Submittals

1.2Material, Equipment, and Fixture Lists

SD-02 Shop Drawings 1.2Record Drawings 1.2Connection Diagrams 1.2Coordination Drawings 1.2Fabrication Drawings 3.1Installation Drawings

SD-03 Product Data 2.1Pipe and Fittings 2.2Piping Specialties 2.3Valves 2.4Miscellaneous Materials 2.5Supporting Elements 1.2Equipment Foundation Data

SD-04 Samples 1.2Manufacturer's Standard Color

Charts SD-05 Design Data

2.1Pipe and Fittings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 40 PAGES

23 05 15 2.2Piping Specialties 2.3Valves

SD-06 Test Reports 3.1Hydrostatic Tests 3.1Air Tests 3.1Valve-Operating Tests 3.1Drainage Tests 3.1Pneumatic Tests 3.1Non-Destructive Electric Tests 3.1System Operation Tests

SD-07 Certificates 1.2Listing of Product Installations 1.2Records of Existing Conditions 3.1Surface Resistance 3.1Shear and Tensile Strengths 3.1Temperature Ratings 3.1Bending Tests 3.1Flattening Tests 3.1Transverse Guided Weld Bend

Tests SD-10 Operation and Maintenance Data

3.9Operation and Maintenance Manuals

23 05 48 SD-02 Shop Drawings 1.2Installation Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 40 PAGES

23 05 48 1.2Outline Drawings SD-03 Product Data

1.2Equipment and Performance Data

2.1.2Mountings 2.1.3Bases 2.3Isolators 2.3.1Floor-Mounted Piping 2.3.2Vertical Piping

SD-06 Test Reports 2.1Type of Isolator 2.1Type of Base 2.1Allowable Deflection 2.1Measured Deflection

23 05 93 SD-01 Preconstruction Submittals 1.3Records of Existing Conditions 1.3.3Records of Existing Conditions 1.5.4.1TAB Firm 1.2TAB team assistants 1.2TAB team engineer 1.5.4.2TAB Specialist 1.2TAB team field leader

SD-02 Shop Drawings 1.3.3TAB Schematic Drawings and

Report Forms SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 40 PAGES

23 05 93 1.3Equipment and Performance Data

1.5.4.4 GTAB Related HVAC Submittals

1.5.2Calibration 1.3.3Systems Readiness Check 1.5.5TAB Execution 1.5.5.3TAB Verification

SD-06 Test Reports 3.7DALT and TAB Work Execution

Schedule 3.7DALT and TAB Procedures

Summary 1.3.3Design review report 1.7.3.1Design review report 3.7Design review report 1.5.3Pre-Final DALT report 1.7.3Pre-Final DALT report 3.3.5Pre-Final DALT report 1.5.3Final DALT report 1.7.3Final DALT report 3.3.8Final DALT report 1.5.6.2TAB report for Season 1 3.7TAB report for Season 1

SD-07 Certificates 1.5.1Independent TAB agency and personnel qualifications

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 40 PAGES

23 05 93 1.5.1Independent TAB agency and personnel qualifications

3.3.2Advance notice of Pre-Final DALT field work

3.7Completed Pre-Final DALT Work Checklist

3.7Completed Pre-Final DALT Work Checklist

3.7Advance Notice of Season 1 TAB Field Work

3.7Completed Season 1 Pre-TAB Work Checklist

1.5.4.1TAB Firm

1.7.1 GDALT and TAB Submittal and

Work Schedule

1.7.3 GDALT and TAB Submittal and

Work Schedule 1.3.3Design review report 1.7.3.1Design review report 3.7Design review report 1.7.3.2Pre-field DALT preliminary notification 1.7.3.3Pre-field TAB engineering report 1.7.3Advanced notice for Season 1

TAB field work

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 40 PAGES

23 05 93 1.7.3Prerequisite HVAC Work Check Out List For Season 1

23 07 00 SD-02 Shop Drawings 3.2.2.4MICA Plates 2.3Pipe Insulation Systems 3.2Pipe Insulation Systems 3.3Duct Insulation Systems 3.4Equipment Insulation Systems

SD-03 Product Data 2.3Pipe Insulation Systems 3.2Pipe Insulation Systems 3.3Duct Insulation Systems 3.4Equipment Insulation Systems

SD-04 Samples 2.2.1.3Thermal Insulation

SD-08 Manufacturer’s Instructions 2.3Pipe Insulation Systems 3.2Pipe Insulation Systems 3.3Duct Insulation Systems 3.4Equipment Insulation Systems

23 08 00.00 10 SD-02 Shop Drawings 1.5.2.2Commissioning Plan

SD-03 Product Data 3.2.1Pre-Functional Performance Test

Checklists 3.2.2Functional Performance Tests

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 40 PAGES

23 08 00.00 10 SD-06 Test Reports 3.3Commissioning Report

SD-07 Certificates 1.5.1Commissioning Firm 1.5.2Commissioning Specialist

23 09 23.13 20 SD-02 Shop Drawings 1.4.1.1Control system drawings title sheet 1.4.1.2List of I/O Points 1.4.1.3Control System Components List 1.4.1.4Control system schematics 1.4.1.5HVAC Equipment Electrical

Ladder diagrams 1.4.1.6Component wiring diagrams 1.4.1.7Terminal strip diagrams 1.4.1.8BACnet communication architecture schematic SD-03 Product Data

2.1.1Direct Digital Controllers BACnet Gateways

2.1.3BACnet Protocol Analyzer 2.2Sensors and Input Hardware 2.3Output Hardware 2.4.2Surge and transient protection 2.5Indicators 2.6Variable frequency (motor) drives

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 40 PAGES

23 09 23.13 20 SD-05 Design Data 3.4.2Performance Verification Testing

Plan 3.4.4Pre-Performance Verification

Testing Checklist SD-06 Test Reports

3.4.11Performance Verification Testing Report

SD-07 Certificates 1.6.6Contractor's Qualifications

SD-09 Manufacturer’s Field Reports

3.4.1Pre-PVT Checklist SD-10 Operation and Maintenance Data

1.4BACnet Direct Digital Control Systems

3.3Controls System Operators Manuals

2.6.2VFD Service Manuals SD-11 Closeout Submittals

3.5.1Training documentation 23 11 25 SD-02 Shop Drawings

1.4.3Gas Piping System 2.2Gas Piping System

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 40 PAGES

23 11 25 1.5Pipe and Fittings 1.4.3Gas equipment connectors

LPG containers and accessories 1.4.3Gas Piping System 2.2Gas Piping System 2.1Pipe Coating Materials and application procedures 2.6Pressure regulators 2.4Risers 2.2.8Transition fittings 2.3Valves

Valve box 2.2.4Warning and identification tape

SD-06 Test Reports 3.13Testing 3.13.1Pressure Tests

Pressure Tests for Liquified Petroleum Gas

3.13.2Test With Gas SD-07 Certificates

1.4.1Welders procedures and qualifications

1.4.1assigned number, letter, or symbol

SD-08 Manufacturer’s Instructions 1.4.2PE pipe and fittings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 40 PAGES

23 11 25 2.1pipe coating materials and application procedures

SD-10 Operation and Maintenance Data

1.2.1Gas facility system and equipment operation

1.2.2Gas facility system maintenance 1.2.3Gas facility equipment maintenance 23 21 13.00 20 SD-02 Shop Drawings

1.3.1Hot water heating system SD-03 Product Data

2.3.1Pumps 2.3.2Expansion tanks 2.3.5Flow measuring equipment 2.3.4Backflow preventers 2.3.3External air separation tanks 2.1.1Hot water heating pipe

SD-06 Test Reports 3.3.1Hydrostatic test of piping system 3.3.2Auxiliary equipment and accessory tests SD-07 Certificates

1.5.4Backflow preventer certification 1.5.2.1Report of prior installations 1.5.2.2Welding procedures

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 40 PAGES

23 21 13.00 20 1.5.2.3Welder's qualifications 23 23 00 SD-02 Shop Drawings

2.3Refrigerant Piping System SD-03 Product Data

2.3Refrigerant Piping System 1.5.2Spare Parts 1.3.1Qualifications 3.5Refrigerant Piping Tests 3.4Demonstrations 3.1Verification of Dimensions

SD-06 Test Reports 3.5Refrigerant Piping Tests

SD-07 Certificates 2.1Service Organization

SD-10 Operation and Maintenance Data

1.5Maintenance 3.4Operation and Maintenance

Manuals 23 36 00 SD-01 Preconstruction Submittals

1.3Records of Existing Conditions SD-02 Shop Drawings

2.1Single-Duct Variable Volume Air Terminal Units

1.3Record Drawings 1.3Spare Parts

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 40 PAGES

23 36 00 SD-03 Product Data 2.1Single-Duct Variable Volume Air

Terminal Units SD-10 Operation and Maintenance Data

3.3Operation and Maintenance Manuals

23 37 13 SD-01 Preconstruction Submittals 2.1Material, Equipment, and Fixture

Lists 2.1Records of Existing Conditions

SD-02 Shop Drawings 2.1Fabrication Drawings 3.1Installation Drawings

SD-03 Product Data 1.3Equipment and Performance

Data SD-04 Samples Manufacturer's Standard Color Chart

SD-10 Operation and Maintenance Data Type TS Supply Troffer Type TSR Combination Supply and Return Troffer

23 52 43.00 20 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 40 PAGES

23 52 43.00 20 1.3.1Fuel train 1.3.1Wiring diagram

SD-03 Product Data 2.1Boilers

;G 2.3Boiler trim and control equipment 2.2Burners and control equipment 2.3.15Stack, breeching, and supports

SD-06 Test Reports 3.4.1Operational tests 1.3.2Water analysis

SD-07 Certificates 2.1Boilers 2.2Burners and control equipment 2.3Boiler trim and control equipment

SD-08 Manufacturer’s Instructions 2.1Boilers

SD-10 Operation and Maintenance Data

2.1Boilers SD-11 Closeout Submittals

2.1boilers ;G

23 73 13 SD-02 Shop Drawings 3.1Installation Drawings

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 40 PAGES

23 73 13 1.2Equipment and Performance Data

2.2Unit Cabinet 2.3Fan 2.4Drain Pans 2.5Insulation

Plenums 1.2Spare Parts

SD-07 Certificates 3.1Listing of Product Installations 2.2Unit Cabinet 2.3Fan 2.4Drain Pans 2.5Insulation

Plenums 1.2Spare Parts

SD-10 Operation and Maintenance Data

3.5Operation and Maintenance Manuals

23 81 23.00 20 SD-03 Product Data

2.1 GComputer room air conditioning

units 2.2.2Space temperature control system drawings Environmental Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 40 PAGES

23 81 23.00 20 SD-06 Test Reports 2.4.2CRACU production schedule and factory test schedule 2.4.1Manufacturer's factory test plans 2.4.5Factory test reports 3.3.2Field test schedule 3.3.1Manufacturer's field test plans 3.3.6Field test reports

SD-07 Certificates Certificate of Specification Compliance

3.3.3Credentials of the manufacturer's field test representative

SD-08 Manufacturer’s Instructions 3.1.2Installation manual for each type of CRACU SD-10 Operation and Maintenance Data

2.1Computer room air conditioning units

23 82 19 SD-01 Preconstruction Submittals 1.3Material, Equipment, and Product

Installation Lists SD-02 Shop Drawings

1.3Fabrication Drawings

3.1 GInstallation Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 40 PAGES

23 82 19 SD-03 Product Data 1.3Equipment and Performance

Data 2.5Coils 2.3Casing 2.2Enclosure 2.8Motors 2.4Fan 2.6Drain Pans 2.7Filters 2.9Controls 1.3Vibration Isolation

SD-04 Samples 1.3Manufacturer's Standard Color

Chart SD-07 Certificates

1.3Listing of Product Installations 2.5Coils 2.3Casing 2.2Enclosure 2.8Motors 2.4Fan 2.6Drain Pans 2.7Filters 2.9Controls

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 40 PAGES

23 82 19 SD-10 Operation and Maintenance Data

3.3Operation and Maintenance Manuals

26 05 00.00 40 SD-01 Preconstruction Submittals 1.5Material, Equipment, and Fixture

Lists Conduits, Raceway and Fittings

2.6Outlets, Outlet Boxes, and Pull Boxes

2.7Panelboards 3.7Panelboards 2.9Lamps and Lighting Fixtures 3.6Lamps and Lighting Fixtures

SD-03 Product Data 3.1Conduits, Raceway sand Fittings 2.2Wire and Cable 2.3Splices and Connectors 2.4Switches 2.1.7Receptacles 2.5Receptacles 3.4.1Receptacles 2.6Outlets, Outlet Boxes, and Pull

Boxes 2.8Circuit Breakers 2.7Panelboards

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 40 PAGES

26 05 00.00 40 3.7Panelboards 2.9Lamps and Lighting Fixtures 3.6Lamps and Lighting Fixtures 3.8Dry-Type Distribution

Transformers SD-06 Test Reports

3.11Continuity Test 3.11Phase-Rotation Tests

SD-08 Manufacturer’s Instructions 1.5Manufacturer's Instructions

26 05 71.00 40 SD-01 Preconstruction Submittals Fuses

SD-03 Product Data 2.1Motor Control

SD-07 Certificates 2.9Circuit Tests 3.2dielectric tests

SD-08 Manufacturer’s Instructions 3.1Control Devices 3.1Protective Devices

SD-10 Operation and Maintenance Data

2.1.1Manual Motor Controllers 2.1.2Magnetic Motor Controllers 2.1.3Combination Motor Controllers 2.4Circuit Breakers

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 40 PAGES

26 05 71.00 40 2.6Time Switches 2.7Protective Relays 2.8Indicating Instruments

26 08 00 SD-06 Test Reports

3.1 GAcceptance tests and inspections

SD-07 Certificates

1.4.1 GQualifications

1.4.3 GAcceptance test and inspections

procedure 26 09 23.00 40 SD-03 Product Data

2.1Photoconductive Control Devices 2.4Dimming ballast controls 2.5Light Level Sensor 2.6Dimmer Switch 2.7Lighting Contactor 2.9Occupancy Sensors

SD-10 Operation and Maintenance Data

2.1 GLighting Control System, Data

Package 5

26 20 00 SD-02 Shop Drawings Panelboards Transformers

2.5Cable trays 2.21Wireways

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 40 PAGES

26 20 00 2.12 GReceptacles GCircuit breakers

2.11 GSwitches

GTransformers GEnclosed circuit breakers

2.14 GMotor controllers

26 23 00.00 40 SD-02 Shop Drawings

1.5.2 GSwitchboard Drawings

SD-03 Product Data

2.2 GSwitchboard

SD-06 Test Reports

2.5.2 GSwitchboard design tests

2.5.3Switchboard production tests

3.5.1 GAcceptance checks and tests

SD-10 Operation and Maintenance Data

1.6.1 GSwitchboard Operation and

Maintenance

SD-11 Closeout Submittals

1.6.2 GAssembled Operation and

Maintenance Manuals

2.5.1 GEquipment Test Schedule

3.5 GRequest for Settings

26 24 16.00 40 SD-02 Shop Drawings 1.2Detail Drawings 1.2Outline Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 40 PAGES

26 24 16.00 40 SD-03 Product Data 2.1Panelboards 2.3Directory Card and Holder 2.4Filtered Panelboard

SD-04 Samples 2.1keys

SD-06 Test Reports 3.2Continuity Tests 3.2Insulation Tests

SD-07 Certificates 1.2Statements

SD-08 Manufacturer’s Instructions 2.1Panelboards

26 28 21.00 40 SD-02 Shop Drawings 2.2Contacts 2.3Indicating Lights 2.4Terminal Board

SD-03 Product Data 1.3Equipment and Performance

Data 2.2Contacts 2.3Indicating Lights 2.4Terminal Board 2.7Enclosures 2.8Accessories

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 40 PAGES

26 28 21.00 40 1.4Operation Tests SD-08 Manufacturer’s Instructions

2.3Automatic Transfer Switch 26 51 00.00 40 SD-03 Product Data

2.2 GFluorescent lighting fixtures

1.5.1 GFluorescent electronic ballasts

2.2.5 GFluorescent lamps

2.3 GHigh-intensity-discharge (HID)

lighting fixtures

2.3.1 GHID ballasts

2.2.2 GElectronic dimming ballast

2.2.3 GDimming ballast controls

1.5.3.3Energy Efficiency

SD-06 Test Reports 3.3Operating test 3.4Operational Tests

SD-10 Operation and Maintenance Data

1.7Operational Service 26 52 00.00 40 SD-01 Preconstruction Submittals

1.2Material, Equipment, and Fixture Lists

SD-03 Product Data 2.3Emergency Fluorescent Lighting

26 53 00.00 40 SD-01 Preconstruction Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 40 PAGES

26 53 00.00 40 1.2Material, Equipment, and Fixture Lists

2.3Exit Lighting Units SD-02 Shop Drawings

2.3Exit Lighting Units SD-03 Product Data

2.3Exit Lighting Units 27 05 28.36 40 SD-02 Shop Drawings

2.2Fabrication Drawings 3.2Installation Drawings

SD-03 Product Data 3.1Cable Trays 2.3Supports

SD-08 Manufacturer’s Instructions 3.1Manufacturer's Instructions

27 10 00 SD-02 Shop Drawings

1.6.1.1 GTelecommunications drawings

1.6.1.2 GTelecommunications Space

Drawings SD-03 Product Data

2.3 GTelecommunications cabling

2.4.5 GPatch panels

2.5 GTelecommunications

outlet/connector assemblies

2.4.3 GConnector blocks

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 40 PAGES

27 10 00 3.5.1 GTelecommunications cabling testing

SD-07 Certificates

1.6.2.1 GTelecommunications Contractor

1.6.3 GTest plan

SD-09 Manufacturer’s Field Reports

2.11.1 GFactory reel tests

SD-10 Operation and Maintenance Data

1.10.1 GTelecommunications cabling and

pathway system

SD-11 Closeout Submittals

1.10.2 GRecord Documentation

28 05 26.00 40 SD-01 Preconstruction Submittals 3.5.2Grounding Systems

SD-02 Shop Drawings 1.4Record Drawings

SD-03 Product Data Ground Rods

2.1Ground Wires 2.2Connectors and Fasteners 3.4Bonding

SD-06 Test Reports 3.5.1Bond Resistance Test 3.5.2Ground Resistance Tests

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 40 PAGES

28 05 26.00 40 3.5.3Ground Isolation Test 3.5.4Continuity Isolation Test

SD-08 Manufacturer’s Instructions 3.5.2Grounding Systems

28 31 76 SD-02 Shop Drawings

3.2.1 GWiring Diagrams

1.4.1 GSystem Layout

2.3 GSystem Operation

2.19 GNotification Appliances

2.16 GAmplifiers

3.7.2As-Built Drawings

SD-03 Product Data

1.4.2 GTechnical Data And Computer

Software

1.4.2 GFire alarm control panel

2.14 GFire Alarm And Mass Notification

Control Panel (FACP/FMCP)

3.2.2 GTerminal cabinets

2.18 GManual stations

2.25 GTransmitters

2.13.1 GBatteries

2.13.2 GBattery chargers

2.10 GSmoke sensors

2.26 GWiring

2.19 GNotification appliances

2.7 GAddressable interface devices

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 40 PAGES

28 31 76 2.17 GGraphic annunciator

2.16 GAmplifiers

2.16 GTone generators

2.16 GDigitalized voice generators

2.22 GWaterflow detectors

2.21 GTamper switches

2.23 GElectromagnetic door holders

2.15 GRemote fire alarm control units

2.25.1 GRadio transmitter and interface

panels SD-05 Design Data

2.3 GSystem Operation

2.13.1.2 GBattery power

2.25.1 GBattery power

SD-06 Test Reports 3.7Field Quality Control

3.7.1 GTesting Procedures

2.10.3 GSmoke sensor testing

SD-07 Certificates 1.6.1.4Installer

SD-09 Manufacturer’s Field Reports

1.6.2.2Mass Notification System SD-10 Operation and Maintenance Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 39 OF 40 PAGES

28 31 76 1.8 GOperation and Maintenance (O&M) Instructions

3.8Instruction of Government Employees

32 01 13 SD-03 Product Data 1.2.1Equipment List 3.2.3Inspection Reports

SD-04 Samples

2.2 GFog Seal

SD-06 Test Reports Tests

32 11 23 SD-03 Product Data 1.3Plant, Equipment, and Tools

Waybills and Delivery Tickets SD-06 Test Reports

1.5 GSampling and Testing

1.5.2.4 GField Density Tests

32 16 13 SD-03 Product Data 2.1Concrete

SD-06 Test Reports 3.6Field Quality Control

32 17 24.00 10 SD-03 Product Data

1.2 GEquipment

Composition Requirements 1.4.1Qualifications

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 40 OF 40 PAGES

32 17 24.00 10 2.2Sampling and Testing SD-07 Certificates Volatile Organic Compound

(VOC)

33 11 23 SD-03 Product Data 2.4.3Pressure regulator 2.6Gas equipment connectors 2.4Valves 2.8Warning and identification tape 2.3.2Risers 2.3.3Transition fittings 2.5Gas meter

SD-07 Certificates 1.5.1Welder's qualifications 1.5.2PE welder's qualifications 1.5.1Welder's identification symbols 1.7.1Year 2000 (Y2K) Compliance

Warranty SD-08 Manufacturer’s Instructions PE pipe and fittings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

File details come from the government source that posted it. Updated .