RKMF 09-0070 Submittal Register.pdf
PDF 1 MB Posted
- Attached to
- Repair Data Lab & FTI Building 423
- Solicitation number
- FA4861-10-R-A029
About this file
Atch 2 Schedule of Material Submittals
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 40 PAGES
Repair Data Lab & FTI Facility, Bldg. 423, Nellis AFB
01 33 00 SD-01 Preconstruction Submittals 1.9Submittal register
03 30 53 SD-03 Product Data 2.1.3.1Air-Entraining Admixture 2.1.3.2Accelerating Admixture 2.1.3.3Water-Reducing or Retarding
Admixture 2.1.11Curing Materials 2.1.5Reinforcing Steel 2.1.6Expansion Joint Filler Strips, Premolded 2.1.7Joint Sealants - Field Molded
Sealants Batching and Mixing Equipment
3.2Conveying and Placing Concrete Concrete Placement
2.2Ready-Mix Concrete 2.2Mix Design Data 2.2Air-Entraining Admixtures 2.2Fly Ash 2.3Steel Reinforcement 2.5.2Curing Compound
SD-06 Test Reports 2.1.2Aggregates 1.3.3Concrete Mixture Proportions 3.10Compressive Strength Testing
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
Attachment #2 Schedule of Material Submittals
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 40 PAGES
03 30 53 3.10Slump SD-07 Certificates
2.1.1Cementitious Materials CPG for recycled materials or appropriate Waiver Form
2.1.2Aggregates 04 20 00 SD-06 Test Reports
1.4.1 GMasonry Inspector Qualifications
SD-08 Manufacturer’s Instructions
2.4.3Masonry Cement 05 40 00 SD-07 Certificates
1.4Load-bearing cold-formed metal framing
3.1.1Welds 06 61 16 SD-06 Test Reports
2.1Solid polymer material 08 11 13 SD-02 Shop Drawings
2.1Doors 2.1Doors 2.5Frames 2.5Frames 2.4Accessories 2.7Weatherstripping
SD-03 Product Data 2.1Doors 2.5Frames
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 40 PAGES
08 11 13 2.4Accessories 2.7Weatherstripping
SD-04 Samples 2.9.4Factory-applied enamel finish
08 51 13 SD-02 Shop Drawings 2.1Windows
SD-04 Samples Finish Samples
08 71 00 SD-02 Shop Drawings 1.3Hardware schedule 2.3.6Keying system
SD-03 Product Data 2.3Hardware items
SD-08 Manufacturer’s Instructions 3.1Installation
SD-11 Closeout Submittals 1.4Key Bitting
08 91 00 SD-02 Shop Drawings 1.4Wall louvers 1.5Wall louvers
SD-03 Product Data 2.2Metal Wall Louvers
09 29 00 SD-03 Product Data 2.1.4Cementitious backer units 2.1.7Accessories 2.1.1Gypsum Board
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 40 PAGES
09 29 00 2.1.5Joint Treatment Materials 1.5.1Local/Regional Materials
SD-08 Manufacturer’s Instructions 2.1Material Safety Data Sheets
SD-10 Operation and Maintenance Data
2.1Manufacturer maintenance instructions
3.8Waste Management SD-11 Closeout Submittals
1.5.1Local/Regional Materials 2.1.1Gypsum Board
09 51 00 SD-02 Shop Drawings 1.3Approved Detail Drawings
SD-03 Product Data Acoustical Ceiling Systems
SD-06 Test Reports Ceiling Attenuation Class and Test
SD-07 Certificates 2.1Acoustical Units
Acoustic Ceiling Tiles 09 65 00 SD-03 Product Data
2.8Resilient Flooring and Accessories
2.4Adhesives
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 40 PAGES
09 65 00 2.1Vinyl Composition Tile 2.2Wall Base
Material Safety Data Sheets
(MSDS)
SD-06 Test Reports 3.3Moisture, Alkalinity and Bond
Tests SD-08 Manufacturer’s Instructions
3.2Surface Preparation 3.1Installation
SD-10 Operation and Maintenance Data
2.8Resilient Flooring and Accessories
09 68 00 SD-03 Product Data 2.1Carpet 3.1Surface Preparation
Warranty SD-04 Samples
2.1Carpet SD-07 Certificates
2.1Carpet 1.4Regulatory Requirements
SD-10 Operation and Maintenance Data
2.1Carpet
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 40 PAGES
09 68 00 3.3Cleaning and Protection Maintenance Service
09 69 13 SD-05 Design Data 1.3Compliance with ICC-ES AC300
Seismic Calculations 09 90 00 SD-07 Certificates
1.3Applicator's qualifications 1.4.1.2Qualification Testing
SD-08 Manufacturer’s Instructions Application instructions
3.5.2Mixing 1.7.2Manufacturer's Material Safety
Data Sheets 10 14 02 SD-10 Operation and Maintenance
Data 3.1Approved Manufacturer's
Instructions 10 28 13 SD-07 Certificates
2.2Accessory Items 13 48 00.00 10 SD-02 Shop Drawings
Coupling and Bracing 3.1Flexible Couplings or Joints 1.3Equipment Requirements
1.2.4 GContractor Designed Bracing
SD-03 Product Data GCoupling and Bracing
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 40 PAGES
13 48 00.00 10 1.3 GEquipment Requirements
1.2.4 GContractor Designed Bracing
SD-07 Certificates 2.2Flexible Ball Joints
21 13 13.00 10 SD-02 Shop Drawings
1.4.3 GShop Drawings
3.8As-Built Drawings
SD-03 Product Data 1.4.1Fire Protection Related
Submittals
2.3 GMaterials and Equipment
1.6Spare Parts
3.7 GPreliminary Tests
3.8 GFinal Acceptance Test
3.9 GOnsite Training
1.4.1 GFire Protection Specialist
1.4.2 GSprinkler System Installer
SD-05 Design Data
1.4.3 GSway Bracing
1.2.1.3 GHydraulic Calculations
SD-06 Test Reports
3.8 GPreliminary Test Report
3.8 GFinal Acceptance Test Report
SD-07 Certificates
3.3 GInspection by Fire Protection
Specialist
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 40 PAGES
21 13 13.00 10 SD-10 Operation and Maintenance Data
3.9Operating and Maintenance Instructions
22 00 00 SD-02 Shop Drawings 3.9.1Plumbing System
SD-03 Product Data Environmental Data
2.1Materials 2.4Fixtures 2.4.1Flush valve water closets
Flush valve urinals 2.4.2Countertop lavatories 2.4.3Kitchen sinks 2.4.4Mop Sink 2.4.5Drinking-water coolers
Emergency eye wash & shower 2.9Water heaters
Pulse Power Water treatment system
2.10Pumps 3.9.1.1Backflow prevention assemblies 1.5.1Welding 3.4Vibration-Absorbing Features 3.9.1Plumbing System
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 40 PAGES
22 00 00 3.9Tests, Flushing and Disinfection 3.9.1.1Test of Backflow Prevention
Assemblies SD-07 Certificates
1.3Materials and Equipment 2.1.1Bolts
SD-10 Operation and Maintenance Data
3.9.1Plumbing System 22 05 48.00 20 SD-02 Shop Drawings
2.7Inertia bases 2.6Machinery bases 2.6Platforms 2.6Rails 2.6Saddles
SD-03 Product Data 2.3Isolators 2.8Flexible connectors 2.9Flexible duct connectors 2.11Pipe guides 2.10Seismic snubbers 3.1.3Vertical stops 2.12Thrust restraints 2.7Inertia bases 2.6Machinery bases
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 40 PAGES
22 05 48.00 20 3.1.13Machinery foundations and subbases
2.6Platforms 2.6Rails 2.6Saddles 1.4.2Machinery manufacturer's sound data SD-05 Design Data
2.7Inertia bases 2.6Machinery bases 2.6Platforms 2.6Rails 2.6Saddles 1.4.3machinery 1.4.4machinery over 300 pounds
SD-06 Test Reports 2.10Seismic snubbers 3.2.3.1Equipment vibration tests 3.2.3.2Equipment sound level tests 2.4Protected spring isolators
SD-08 Manufacturer’s Instructions 3.1.1Vibration and noise isolation components 2.13Seismic protection components
22 07 19 SD-02 Shop Drawings 3.1Installation Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 40 PAGES
22 07 19 SD-03 Product Data 2.2Adhesives 2.6Coatings
Insulating Cement 2.1Insulation Materials 2.5Jacketing 2.7Tape
SD-08 Manufacturer’s Instructions 2.1Insulation Materials
23 00 00 SD-02 Shop Drawings 1.4.5Detail Drawings
SD-03 Product Data 2.1Standard Products 2.9.1.1Metallic Flexible Duct 2.9.1.2Insulated Nonmetallic Flexible
Duct Runouts 2.9.1.2Duct Connectors 2.9.2.1Duct Access Doors 2.9.2.2Manual Balancing Dampers 2.9.2.3Automatic Smoke-Fire Dampers 2.9.5Sound Attenuation Equipment
Acoustical Duct Liner 2.9.6.1Diffusers 2.9.6.2Registers and Grilles 2.9.7Louvers
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 40 PAGES
23 00 00 Air Vents, Penthouses, and Goosenecks
2.10.1.1In-Line Centrifugal Fans Room Fan-Coil Units
2.11.1.1Variable Volume, Single Duct Terminal Units
Test Procedures 1.2.1Diagrams 3.14Operation and Maintenance
Training SD-06 Test Reports
3.12Performance Tests 3.14Performance Tests 3.10Damper Acceptance Test
SD-07 Certificates 1.4.1Bolts
SD-08 Manufacturer’s Instructions 3.2Manufacturer's Installation
Instructions 3.14Operation and Maintenance
Training SD-10 Operation and Maintenance Data
3.14Operation and Maintenance Manuals
2.9.2.2Manual Balancing Dampers
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 40 PAGES
23 00 00 2.9.2.3Automatic Smoke-Fire Dampers 2.10.1.1In-Line Centrifugal Fans
Room Fan-Coil Units 2.11.1.1Variable Volume, Single Duct
Terminal Units 23 05 15 SD-01 Preconstruction Submittals
1.2Material, Equipment, and Fixture Lists
SD-02 Shop Drawings 1.2Record Drawings 1.2Connection Diagrams 1.2Coordination Drawings 1.2Fabrication Drawings 3.1Installation Drawings
SD-03 Product Data 2.1Pipe and Fittings 2.2Piping Specialties 2.3Valves 2.4Miscellaneous Materials 2.5Supporting Elements 1.2Equipment Foundation Data
SD-04 Samples 1.2Manufacturer's Standard Color
Charts SD-05 Design Data
2.1Pipe and Fittings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 40 PAGES
23 05 15 2.2Piping Specialties 2.3Valves
SD-06 Test Reports 3.1Hydrostatic Tests 3.1Air Tests 3.1Valve-Operating Tests 3.1Drainage Tests 3.1Pneumatic Tests 3.1Non-Destructive Electric Tests 3.1System Operation Tests
SD-07 Certificates 1.2Listing of Product Installations 1.2Records of Existing Conditions 3.1Surface Resistance 3.1Shear and Tensile Strengths 3.1Temperature Ratings 3.1Bending Tests 3.1Flattening Tests 3.1Transverse Guided Weld Bend
Tests SD-10 Operation and Maintenance Data
3.9Operation and Maintenance Manuals
23 05 48 SD-02 Shop Drawings 1.2Installation Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 40 PAGES
23 05 48 1.2Outline Drawings SD-03 Product Data
1.2Equipment and Performance Data
2.1.2Mountings 2.1.3Bases 2.3Isolators 2.3.1Floor-Mounted Piping 2.3.2Vertical Piping
SD-06 Test Reports 2.1Type of Isolator 2.1Type of Base 2.1Allowable Deflection 2.1Measured Deflection
23 05 93 SD-01 Preconstruction Submittals 1.3Records of Existing Conditions 1.3.3Records of Existing Conditions 1.5.4.1TAB Firm 1.2TAB team assistants 1.2TAB team engineer 1.5.4.2TAB Specialist 1.2TAB team field leader
SD-02 Shop Drawings 1.3.3TAB Schematic Drawings and
Report Forms SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 40 PAGES
23 05 93 1.3Equipment and Performance Data
1.5.4.4 GTAB Related HVAC Submittals
1.5.2Calibration 1.3.3Systems Readiness Check 1.5.5TAB Execution 1.5.5.3TAB Verification
SD-06 Test Reports 3.7DALT and TAB Work Execution
Schedule 3.7DALT and TAB Procedures
Summary 1.3.3Design review report 1.7.3.1Design review report 3.7Design review report 1.5.3Pre-Final DALT report 1.7.3Pre-Final DALT report 3.3.5Pre-Final DALT report 1.5.3Final DALT report 1.7.3Final DALT report 3.3.8Final DALT report 1.5.6.2TAB report for Season 1 3.7TAB report for Season 1
SD-07 Certificates 1.5.1Independent TAB agency and personnel qualifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 40 PAGES
23 05 93 1.5.1Independent TAB agency and personnel qualifications
3.3.2Advance notice of Pre-Final DALT field work
3.7Completed Pre-Final DALT Work Checklist
3.7Completed Pre-Final DALT Work Checklist
3.7Advance Notice of Season 1 TAB Field Work
3.7Completed Season 1 Pre-TAB Work Checklist
1.5.4.1TAB Firm
1.7.1 GDALT and TAB Submittal and
Work Schedule
1.7.3 GDALT and TAB Submittal and
Work Schedule 1.3.3Design review report 1.7.3.1Design review report 3.7Design review report 1.7.3.2Pre-field DALT preliminary notification 1.7.3.3Pre-field TAB engineering report 1.7.3Advanced notice for Season 1
TAB field work
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 40 PAGES
23 05 93 1.7.3Prerequisite HVAC Work Check Out List For Season 1
23 07 00 SD-02 Shop Drawings 3.2.2.4MICA Plates 2.3Pipe Insulation Systems 3.2Pipe Insulation Systems 3.3Duct Insulation Systems 3.4Equipment Insulation Systems
SD-03 Product Data 2.3Pipe Insulation Systems 3.2Pipe Insulation Systems 3.3Duct Insulation Systems 3.4Equipment Insulation Systems
SD-04 Samples 2.2.1.3Thermal Insulation
SD-08 Manufacturer’s Instructions 2.3Pipe Insulation Systems 3.2Pipe Insulation Systems 3.3Duct Insulation Systems 3.4Equipment Insulation Systems
23 08 00.00 10 SD-02 Shop Drawings 1.5.2.2Commissioning Plan
SD-03 Product Data 3.2.1Pre-Functional Performance Test
Checklists 3.2.2Functional Performance Tests
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 40 PAGES
23 08 00.00 10 SD-06 Test Reports 3.3Commissioning Report
SD-07 Certificates 1.5.1Commissioning Firm 1.5.2Commissioning Specialist
23 09 23.13 20 SD-02 Shop Drawings 1.4.1.1Control system drawings title sheet 1.4.1.2List of I/O Points 1.4.1.3Control System Components List 1.4.1.4Control system schematics 1.4.1.5HVAC Equipment Electrical
Ladder diagrams 1.4.1.6Component wiring diagrams 1.4.1.7Terminal strip diagrams 1.4.1.8BACnet communication architecture schematic SD-03 Product Data
2.1.1Direct Digital Controllers BACnet Gateways
2.1.3BACnet Protocol Analyzer 2.2Sensors and Input Hardware 2.3Output Hardware 2.4.2Surge and transient protection 2.5Indicators 2.6Variable frequency (motor) drives
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 40 PAGES
23 09 23.13 20 SD-05 Design Data 3.4.2Performance Verification Testing
Plan 3.4.4Pre-Performance Verification
Testing Checklist SD-06 Test Reports
3.4.11Performance Verification Testing Report
SD-07 Certificates 1.6.6Contractor's Qualifications
SD-09 Manufacturer’s Field Reports
3.4.1Pre-PVT Checklist SD-10 Operation and Maintenance Data
1.4BACnet Direct Digital Control Systems
3.3Controls System Operators Manuals
2.6.2VFD Service Manuals SD-11 Closeout Submittals
3.5.1Training documentation 23 11 25 SD-02 Shop Drawings
1.4.3Gas Piping System 2.2Gas Piping System
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 40 PAGES
23 11 25 1.5Pipe and Fittings 1.4.3Gas equipment connectors
LPG containers and accessories 1.4.3Gas Piping System 2.2Gas Piping System 2.1Pipe Coating Materials and application procedures 2.6Pressure regulators 2.4Risers 2.2.8Transition fittings 2.3Valves
Valve box 2.2.4Warning and identification tape
SD-06 Test Reports 3.13Testing 3.13.1Pressure Tests
Pressure Tests for Liquified Petroleum Gas
3.13.2Test With Gas SD-07 Certificates
1.4.1Welders procedures and qualifications
1.4.1assigned number, letter, or symbol
SD-08 Manufacturer’s Instructions 1.4.2PE pipe and fittings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 40 PAGES
23 11 25 2.1pipe coating materials and application procedures
SD-10 Operation and Maintenance Data
1.2.1Gas facility system and equipment operation
1.2.2Gas facility system maintenance 1.2.3Gas facility equipment maintenance 23 21 13.00 20 SD-02 Shop Drawings
1.3.1Hot water heating system SD-03 Product Data
2.3.1Pumps 2.3.2Expansion tanks 2.3.5Flow measuring equipment 2.3.4Backflow preventers 2.3.3External air separation tanks 2.1.1Hot water heating pipe
SD-06 Test Reports 3.3.1Hydrostatic test of piping system 3.3.2Auxiliary equipment and accessory tests SD-07 Certificates
1.5.4Backflow preventer certification 1.5.2.1Report of prior installations 1.5.2.2Welding procedures
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 40 PAGES
23 21 13.00 20 1.5.2.3Welder's qualifications 23 23 00 SD-02 Shop Drawings
2.3Refrigerant Piping System SD-03 Product Data
2.3Refrigerant Piping System 1.5.2Spare Parts 1.3.1Qualifications 3.5Refrigerant Piping Tests 3.4Demonstrations 3.1Verification of Dimensions
SD-06 Test Reports 3.5Refrigerant Piping Tests
SD-07 Certificates 2.1Service Organization
SD-10 Operation and Maintenance Data
1.5Maintenance 3.4Operation and Maintenance
Manuals 23 36 00 SD-01 Preconstruction Submittals
1.3Records of Existing Conditions SD-02 Shop Drawings
2.1Single-Duct Variable Volume Air Terminal Units
1.3Record Drawings 1.3Spare Parts
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 40 PAGES
23 36 00 SD-03 Product Data 2.1Single-Duct Variable Volume Air
Terminal Units SD-10 Operation and Maintenance Data
3.3Operation and Maintenance Manuals
23 37 13 SD-01 Preconstruction Submittals 2.1Material, Equipment, and Fixture
Lists 2.1Records of Existing Conditions
SD-02 Shop Drawings 2.1Fabrication Drawings 3.1Installation Drawings
SD-03 Product Data 1.3Equipment and Performance
Data SD-04 Samples Manufacturer's Standard Color Chart
SD-10 Operation and Maintenance Data Type TS Supply Troffer Type TSR Combination Supply and Return Troffer
23 52 43.00 20 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 40 PAGES
23 52 43.00 20 1.3.1Fuel train 1.3.1Wiring diagram
SD-03 Product Data 2.1Boilers
;G 2.3Boiler trim and control equipment 2.2Burners and control equipment 2.3.15Stack, breeching, and supports
SD-06 Test Reports 3.4.1Operational tests 1.3.2Water analysis
SD-07 Certificates 2.1Boilers 2.2Burners and control equipment 2.3Boiler trim and control equipment
SD-08 Manufacturer’s Instructions 2.1Boilers
SD-10 Operation and Maintenance Data
2.1Boilers SD-11 Closeout Submittals
2.1boilers ;G
23 73 13 SD-02 Shop Drawings 3.1Installation Drawings
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 40 PAGES
23 73 13 1.2Equipment and Performance Data
2.2Unit Cabinet 2.3Fan 2.4Drain Pans 2.5Insulation
Plenums 1.2Spare Parts
SD-07 Certificates 3.1Listing of Product Installations 2.2Unit Cabinet 2.3Fan 2.4Drain Pans 2.5Insulation
Plenums 1.2Spare Parts
SD-10 Operation and Maintenance Data
3.5Operation and Maintenance Manuals
23 81 23.00 20 SD-03 Product Data
2.1 GComputer room air conditioning
units 2.2.2Space temperature control system drawings Environmental Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 40 PAGES
23 81 23.00 20 SD-06 Test Reports 2.4.2CRACU production schedule and factory test schedule 2.4.1Manufacturer's factory test plans 2.4.5Factory test reports 3.3.2Field test schedule 3.3.1Manufacturer's field test plans 3.3.6Field test reports
SD-07 Certificates Certificate of Specification Compliance
3.3.3Credentials of the manufacturer's field test representative
SD-08 Manufacturer’s Instructions 3.1.2Installation manual for each type of CRACU SD-10 Operation and Maintenance Data
2.1Computer room air conditioning units
23 82 19 SD-01 Preconstruction Submittals 1.3Material, Equipment, and Product
Installation Lists SD-02 Shop Drawings
1.3Fabrication Drawings
3.1 GInstallation Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 40 PAGES
23 82 19 SD-03 Product Data 1.3Equipment and Performance
Data 2.5Coils 2.3Casing 2.2Enclosure 2.8Motors 2.4Fan 2.6Drain Pans 2.7Filters 2.9Controls 1.3Vibration Isolation
SD-04 Samples 1.3Manufacturer's Standard Color
Chart SD-07 Certificates
1.3Listing of Product Installations 2.5Coils 2.3Casing 2.2Enclosure 2.8Motors 2.4Fan 2.6Drain Pans 2.7Filters 2.9Controls
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 40 PAGES
23 82 19 SD-10 Operation and Maintenance Data
3.3Operation and Maintenance Manuals
26 05 00.00 40 SD-01 Preconstruction Submittals 1.5Material, Equipment, and Fixture
Lists Conduits, Raceway and Fittings
2.6Outlets, Outlet Boxes, and Pull Boxes
2.7Panelboards 3.7Panelboards 2.9Lamps and Lighting Fixtures 3.6Lamps and Lighting Fixtures
SD-03 Product Data 3.1Conduits, Raceway sand Fittings 2.2Wire and Cable 2.3Splices and Connectors 2.4Switches 2.1.7Receptacles 2.5Receptacles 3.4.1Receptacles 2.6Outlets, Outlet Boxes, and Pull
Boxes 2.8Circuit Breakers 2.7Panelboards
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 40 PAGES
26 05 00.00 40 3.7Panelboards 2.9Lamps and Lighting Fixtures 3.6Lamps and Lighting Fixtures 3.8Dry-Type Distribution
Transformers SD-06 Test Reports
3.11Continuity Test 3.11Phase-Rotation Tests
SD-08 Manufacturer’s Instructions 1.5Manufacturer's Instructions
26 05 71.00 40 SD-01 Preconstruction Submittals Fuses
SD-03 Product Data 2.1Motor Control
SD-07 Certificates 2.9Circuit Tests 3.2dielectric tests
SD-08 Manufacturer’s Instructions 3.1Control Devices 3.1Protective Devices
SD-10 Operation and Maintenance Data
2.1.1Manual Motor Controllers 2.1.2Magnetic Motor Controllers 2.1.3Combination Motor Controllers 2.4Circuit Breakers
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 40 PAGES
26 05 71.00 40 2.6Time Switches 2.7Protective Relays 2.8Indicating Instruments
26 08 00 SD-06 Test Reports
3.1 GAcceptance tests and inspections
SD-07 Certificates
1.4.1 GQualifications
1.4.3 GAcceptance test and inspections
procedure 26 09 23.00 40 SD-03 Product Data
2.1Photoconductive Control Devices 2.4Dimming ballast controls 2.5Light Level Sensor 2.6Dimmer Switch 2.7Lighting Contactor 2.9Occupancy Sensors
SD-10 Operation and Maintenance Data
2.1 GLighting Control System, Data
Package 5
26 20 00 SD-02 Shop Drawings Panelboards Transformers
2.5Cable trays 2.21Wireways
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 40 PAGES
26 20 00 2.12 GReceptacles GCircuit breakers
2.11 GSwitches
GTransformers GEnclosed circuit breakers
2.14 GMotor controllers
26 23 00.00 40 SD-02 Shop Drawings
1.5.2 GSwitchboard Drawings
SD-03 Product Data
2.2 GSwitchboard
SD-06 Test Reports
2.5.2 GSwitchboard design tests
2.5.3Switchboard production tests
3.5.1 GAcceptance checks and tests
SD-10 Operation and Maintenance Data
1.6.1 GSwitchboard Operation and
Maintenance
SD-11 Closeout Submittals
1.6.2 GAssembled Operation and
Maintenance Manuals
2.5.1 GEquipment Test Schedule
3.5 GRequest for Settings
26 24 16.00 40 SD-02 Shop Drawings 1.2Detail Drawings 1.2Outline Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 40 PAGES
26 24 16.00 40 SD-03 Product Data 2.1Panelboards 2.3Directory Card and Holder 2.4Filtered Panelboard
SD-04 Samples 2.1keys
SD-06 Test Reports 3.2Continuity Tests 3.2Insulation Tests
SD-07 Certificates 1.2Statements
SD-08 Manufacturer’s Instructions 2.1Panelboards
26 28 21.00 40 SD-02 Shop Drawings 2.2Contacts 2.3Indicating Lights 2.4Terminal Board
SD-03 Product Data 1.3Equipment and Performance
Data 2.2Contacts 2.3Indicating Lights 2.4Terminal Board 2.7Enclosures 2.8Accessories
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 40 PAGES
26 28 21.00 40 1.4Operation Tests SD-08 Manufacturer’s Instructions
2.3Automatic Transfer Switch 26 51 00.00 40 SD-03 Product Data
2.2 GFluorescent lighting fixtures
1.5.1 GFluorescent electronic ballasts
2.2.5 GFluorescent lamps
2.3 GHigh-intensity-discharge (HID)
lighting fixtures
2.3.1 GHID ballasts
2.2.2 GElectronic dimming ballast
2.2.3 GDimming ballast controls
1.5.3.3Energy Efficiency
SD-06 Test Reports 3.3Operating test 3.4Operational Tests
SD-10 Operation and Maintenance Data
1.7Operational Service 26 52 00.00 40 SD-01 Preconstruction Submittals
1.2Material, Equipment, and Fixture Lists
SD-03 Product Data 2.3Emergency Fluorescent Lighting
26 53 00.00 40 SD-01 Preconstruction Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 40 PAGES
26 53 00.00 40 1.2Material, Equipment, and Fixture Lists
2.3Exit Lighting Units SD-02 Shop Drawings
2.3Exit Lighting Units SD-03 Product Data
2.3Exit Lighting Units 27 05 28.36 40 SD-02 Shop Drawings
2.2Fabrication Drawings 3.2Installation Drawings
SD-03 Product Data 3.1Cable Trays 2.3Supports
SD-08 Manufacturer’s Instructions 3.1Manufacturer's Instructions
27 10 00 SD-02 Shop Drawings
1.6.1.1 GTelecommunications drawings
1.6.1.2 GTelecommunications Space
Drawings SD-03 Product Data
2.3 GTelecommunications cabling
2.4.5 GPatch panels
2.5 GTelecommunications
outlet/connector assemblies
2.4.3 GConnector blocks
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 40 PAGES
27 10 00 3.5.1 GTelecommunications cabling testing
SD-07 Certificates
1.6.2.1 GTelecommunications Contractor
1.6.3 GTest plan
SD-09 Manufacturer’s Field Reports
2.11.1 GFactory reel tests
SD-10 Operation and Maintenance Data
1.10.1 GTelecommunications cabling and
pathway system
SD-11 Closeout Submittals
1.10.2 GRecord Documentation
28 05 26.00 40 SD-01 Preconstruction Submittals 3.5.2Grounding Systems
SD-02 Shop Drawings 1.4Record Drawings
SD-03 Product Data Ground Rods
2.1Ground Wires 2.2Connectors and Fasteners 3.4Bonding
SD-06 Test Reports 3.5.1Bond Resistance Test 3.5.2Ground Resistance Tests
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 40 PAGES
28 05 26.00 40 3.5.3Ground Isolation Test 3.5.4Continuity Isolation Test
SD-08 Manufacturer’s Instructions 3.5.2Grounding Systems
28 31 76 SD-02 Shop Drawings
3.2.1 GWiring Diagrams
1.4.1 GSystem Layout
2.3 GSystem Operation
2.19 GNotification Appliances
2.16 GAmplifiers
3.7.2As-Built Drawings
SD-03 Product Data
1.4.2 GTechnical Data And Computer
Software
1.4.2 GFire alarm control panel
2.14 GFire Alarm And Mass Notification
Control Panel (FACP/FMCP)
3.2.2 GTerminal cabinets
2.18 GManual stations
2.25 GTransmitters
2.13.1 GBatteries
2.13.2 GBattery chargers
2.10 GSmoke sensors
2.26 GWiring
2.19 GNotification appliances
2.7 GAddressable interface devices
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 40 PAGES
28 31 76 2.17 GGraphic annunciator
2.16 GAmplifiers
2.16 GTone generators
2.16 GDigitalized voice generators
2.22 GWaterflow detectors
2.21 GTamper switches
2.23 GElectromagnetic door holders
2.15 GRemote fire alarm control units
2.25.1 GRadio transmitter and interface
panels SD-05 Design Data
2.3 GSystem Operation
2.13.1.2 GBattery power
2.25.1 GBattery power
SD-06 Test Reports 3.7Field Quality Control
3.7.1 GTesting Procedures
2.10.3 GSmoke sensor testing
SD-07 Certificates 1.6.1.4Installer
SD-09 Manufacturer’s Field Reports
1.6.2.2Mass Notification System SD-10 Operation and Maintenance Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 39 OF 40 PAGES
28 31 76 1.8 GOperation and Maintenance (O&M) Instructions
3.8Instruction of Government Employees
32 01 13 SD-03 Product Data 1.2.1Equipment List 3.2.3Inspection Reports
SD-04 Samples
2.2 GFog Seal
SD-06 Test Reports Tests
32 11 23 SD-03 Product Data 1.3Plant, Equipment, and Tools
Waybills and Delivery Tickets SD-06 Test Reports
1.5 GSampling and Testing
1.5.2.4 GField Density Tests
32 16 13 SD-03 Product Data 2.1Concrete
SD-06 Test Reports 3.6Field Quality Control
32 17 24.00 10 SD-03 Product Data
1.2 GEquipment
Composition Requirements 1.4.1Qualifications
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 40 OF 40 PAGES
32 17 24.00 10 2.2Sampling and Testing SD-07 Certificates Volatile Organic Compound
(VOC)
33 11 23 SD-03 Product Data 2.4.3Pressure regulator 2.6Gas equipment connectors 2.4Valves 2.8Warning and identification tape 2.3.2Risers 2.3.3Transition fittings 2.5Gas meter
SD-07 Certificates 1.5.1Welder's qualifications 1.5.2PE welder's qualifications 1.5.1Welder's identification symbols 1.7.1Year 2000 (Y2K) Compliance
Warranty SD-08 Manufacturer’s Instructions PE pipe and fittings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)