Macrotec Consulting, LLC.
9724 Mild Weather Ct. · Las Vegas, NV 89148 Phone: (702) 338-8213 · Fax: (702) 629-5677
Environmental Investigation Report Asbestos & Lead Based Paint Survey
Project Information:
Bldg. 423 Nellis AFB, Nevada
Report Info:
Macrotec Project # 09649 July 29, 2009
Prepared For:
Vincent Bowers 99th CES/CEOSM 6020 Beale Ave.
Nellis AFB, NV 89191
Prepared By:
Dustin McAllister - Macrotec Consulting, LLC.
Table of Contents:
Introduction Scope of Services Site Description Sample Collection Methodology Sample Analysis Methodology Asbestos Sample Assessment Lead Sample Assessment Recommendations Inspection Limitations
Appendix A Asbestos Assessment Appendix B Lead Assessment Appendix C Sample Location Diagram Appendix D Laboratory Reports
FA4861-10-B-A029
Attachment #2, Appendix A
Asbestos and Lead Paint Survey Macrotec Project # 09649 NAFB, Building 423 Page 2
INTRODUCTION
Macrotec Consulting performed an inspection for Asbestos-Containing Building Materials and Lead Based Paint (LBP) between July 21 and July 27, 2009. The inspection was conducted for the project defined as: Renovation of the interior of building 423.
The intent of this inspection was to identify materials containing asbestos or lead paint, within the subject site, that may be impacted during planned renovation activities. Macrotec’s inspection services were conducted at the request of Vincent Bowers of 99th CES/CEOSM.
SCOPE OF SERVICES
Asbestos
Macrotec’s inspection services were conducted to identify the presence of any materials containing asbestos pursuant to the requirements of NAC 618.960 and in accordance with the inspection requirements of the EPA’s: 40 CFR Part 61 National Emission Standard for Hazardous Air Pollutants (NESHAP).
These regulations outline inspection and abatement requirements for materials containing asbestos, prior to renovation and/or demolition activities.
Lead
Macrotec collected paint chip samples to identify the presence and content level of lead for compliance with the Occupational Safety and Health Administration’s (OSHA) and the Environmental Protection Agency’s (EPA) regulatory requirements pertaining to worker protection and waste disposal.
SITE DESCRIPTION
The subject site was the interior of a one-story building.
Macrotec’s inspection was limited to the location within the site planned for renovation as described above.
SAMPLE COLLECTION METHODOLOGY
An initial walk through of the subject site was conducted to identify homogeneous suspect materials containing asbestos and lead based paint, and their respective locations. This information was then used to develop a sample collection strategy.
Samples were collected by pre-wetting sample areas with water, then cutting or scraping the sample from the substrate with an appropriate sampling tool.
NAFB, Building 423 Page 3
Whenever possible, samples were collected from areas previously damaged or deteriorating. To avoid potential contamination due to unknown asbestos and lead based paint content; no building systems, components, or structures were demolished to obtain samples of potentially hidden materials containing asbestos or lead.
Each suspect bulk sample was sealed in its own zip lock plastic container and labeled with a unique identification number. Sampling tools were individually cleaned before and after each sample was collected to avoid sample cross contamination. Decontamination was accomplished using single use, pre-moistened cloths.
Samples were recorded on Macrotec’s chain-of-custody form. This form accompanied the samples to Triangle Enivronmental Service Center, Inc.
(TESC), located in Moseley, Virginia. The National Voluntary Laboratory Accreditation Program (NVLAP) accredits TESC for analysis of bulk building material samples for asbestos. The American Industrial Hygiene Association (AIHA) accredits Schneider Laboratories Inc. in Richmond Virginia, for analysis of paint chip samples for lead.
SAMPLE ANALYSIS METHODOLOGY
Asbestos
Suspect asbestos samples were subjected to analysis by polarized light microscopy (PLM). Bulk sample analysis was conducted in accordance with the EPA’s “Test Method for the Determination of Asbestos in Bulk Building Materials, EPA/600/R-93/116, 1993.
Lead
To determine lead content, the samples were submitted for analysis. Suspect paint chip samples were subjected to analysis in accordance with the EPA’s Method SW846-7420.
ASBESTOS SAMPLE ASSESSMENT
Macrotec’s inspection of the subject site found Thirty three (33) separate suspect asbestos building materials, of which a total of Sixty five (65) samples were collected and submitted for analysis.
The following table summarizes the materials that were found to be asbestos containing, the locations where the material is located, the material’s friability and its NESHAP classification.
NAFB, Building 423 Page 4
Material Number
Material Description
Material Locations
Material Friability
NESHAP
18 12x12 Brown Floor Tile On the floor of the storage room at the southeast corner of the building.
Non- Friable
Category I1
19 Black Floor Mastic On the floor of the storage room at the southeast corner of the building.
Non- Friable
Category II2
33 TSI – Pipe Wrap Atop Fiberglass
On the pipes in the chiller room. Friable RACM3
See Appendix A for a listing of the materials, material locations, samples, sample locations and results for this project.
LEAD SAMPLE ASSESSMENT
Macrotec collected Thirty four (34) paint samples of the predominate paint colors within the subject site.
See Appendix B for a listing of painted surfaces, sample locations and results for this project.
RECOMMENDATIONS
Asbestos
US EPA and Nevada Department of Industrial Relations regulations require the removal of all regulated asbestos-containing materials (RACM) prior to any renovation or demolition that could impact or disturb RACM. In accordance with these regulations Macrotec recommends:
Hiring a Certified Asbestos Consultant to develop a project specification based on this investigation and any other additional findings.
Hiring a Nevada licensed Asbestos Abatement Contractor to remove all asbestos materials, which are either regulated or may become regulated during the course of renovation and/or demolition activities.
Hiring a Certified Asbestos Consultant to monitor the removal activities and to provide final clearance inspection reports.
1 Category I nonfriable asbestos-containing material means asbestos containing packings, gaskets, resilient floor covering, and asphalt roofing products containing more than 1% asbestos as determined by
Polarized Light Microscopy (PLM) 2 Category II non-friable asbestos-containing material means any material, excluding Category I, containing more than 1 percent asbestos 3 RACM – Regulated Asbestos Containing Material means a material which is friable asbestos and is subject to NAC 618.850 to 618.986, which sets forth provisions for the abatement of asbestos.
NAFB, Building 423 Page 5
Lead
US EPA OSHA regulations require the implementation of worker protection if there is a potential that paint with lead in it will be disturbed during demolition activities. In accordance with these regulations Macrotec recommends:
Hiring an EPA Licensed Lead Consultant to develop a project specification based on this investigation and any other additional findings.
Hiring an EPA Licensed Lead Abatement Contractor to stabilize and/or remove all regulated lead painted materials.
Hiring an EPA Licensed Lead Consultant to monitor the removal activities and provide final clearance inspection reports.
INSPECTION LIMITATIONS
The information contained in this report is limited to those areas and suspect materials found to be visually accessible through reasonable means.
Macrotec conducted a non-destructive survey. No demolition of building materials was conducted to determine the presence of asbestos in wall cavities, chases or other inaccessible areas. Macrotec cannot warrant that these areas do not contain asbestos in locations other than those noted in this report, however, a good faith effort was made to conduct a comprehensive survey.
• Macrotec accepts no liability for additional materials or under reporting of asbestos materials that exist below other floor coverings.
• This report is not represented as, nor is it intended to be, an asbestos abatement scope of work or project specification.
• If suspect materials are discovered during future demolition operations, cease all general work activities which could impact the discovered suspect materials, until confirmation sampling can be conducted.
NAFB, Building 423 Page 6
Thank you for allowing Macrotec Consulting to assist you with your environmental consulting needs. Please contact me with any questions regarding this report at (702) 338-8213.
Appendix A
Appendix A - Asbestos Assessment
Macrotec Job #09649 - Bldg. 423; WO# 12591
The following table lists each of the materials suspected to contain asbestos at the subject site. For each material the sample number, location and laboratory result are listed. If the material was found to contain asbestos, the friablity and NESHAP classification is identified.
1 Spray Texture on Walls This material is located on the outer walls of the east offices.
No Asbestos Detected
AB1 E Offices - Office 5 - N wall None Detected
AB2 E Offices - Office 7 - E wall None Detected
AB3 E Offices - Men's Room - W wall None Detected
AB4 E Offices - Storage Room - S wall None Detected
AB5 E Offices - Office 9 - S wall None Detected
AB6 E Offices - Comm Room - E wall None Detected
AB7 E Offices - Office 8 - W wall None Detected
2 Sheet Rock Mud & Tape (New) This material is the component of the newer walls throughout the building.
No Asbestos Detected
AB8 E Offices - Office 5 - NW corner None Detected
AB9 E Offices - Office 6 - NE corner None Detected
AB10 E Offices - Storage Room - NW corner None Detected
AB55 W Bay/Offices -Office 12 - NE corner None Detected
AB56 W Bay/Offices -Office 16 - Adj. door None Detected
3 Yellow Mastic Behind Base Cove This material is behind base cove throughout the building.
No Asbestos Detected
AB11 E Offices - Comm Room - Adj. door None Detected
4 Brown Mastic on Walls This material is in the comm room.
No Asbestos Detected
AB12 E Offices - Comm Room - Adj. door None Detected
5 2x4 Ceiling Tile (2x2 Pattern) This material is in several rooms within the building.
No Asbestos Detected
AB13 E Offices - Comm Room - Center None Detected
Asbestos Survey
Bldg. 423
Macrotec Job #09649
Page 1Page 8 of 41
Macrotec Job #09649 - Bldg. 423; WO# 12591
6 2x4 Ceiling Tile (1x1 Pattern) This material is in several rooms within the building.
No Asbestos Detected
AB14 E Offices - Office 5 - Center None Detected
7 Yellow Mastic Beneath Carpet This material is beneath the carpet within the building.
No Asbestos Detected
AB15 E Offices - Comm Room - NE corner None Detected
8 2x4 Ceiling Tile (Light Pock) This material is on several ceilings within the building.
No Asbestos Detected
AB16 E Offices - Office 3 - Center None Detected
9 2x4 Ceiling Tile (6" Square Pattern) This material is on several ceilings within the building.
No Asbestos Detected
AB17 E Offices - Break Room - Center None Detected
10 2x4 Ceiling Tile (Heavy Pock) This material is on several ceilings within the building.
No Asbestos Detected
AB18 E Offices - Storage Room - Center None Detected
11 Yellow Mastic Behind Ceramic Wall Tile This material is on the walls of the restrooms and janitor closet.
No Asbestos Detected
AB19 E Offices - Janitor Closet - N wall None Detected
12 Pre-fab Sheet Rock (No Mud) This material is on the walls of the restrooms and janitor closet.
No Asbestos Detected
AB20 E Offices - N Hall - Adj. office 5 None Detected
13 Sheet Rock Mud & Tape (Original / This material is the component of the original walls throughout the building.
No Asbestos Detected
AB21 E Offices - Comm Room - Adj. door None Detected
AB22 E Offices - N Hall - Adj. N door None Detected
AB23 E Offices - Office 3 - NE corner None Detected
AB24 E Offices - Office 7 - E wall None Detected
Asbestos Survey
Bldg. 423
Macrotec Job #09649
Page 2Page 9 of 41
AB25 E Offices - Break Room - NW corner None Detected
AB26 E Offices - Office 9 - SW corner None Detected
AB27 E Offices - Office 8 - NE corner None Detected
AB51 W Bay/Offices - Equip Storage - S wall None Detected
AB52 W Bay/Offices - Office 11 - N wall None Detected
AB53 W Bay/Offices - Break Room 3 - N wall None Detected
AB61 Mech Rooms - Electrical - N wall None Detected
14 Brick - 4"x16" This material is the component of several walls throughout the building.
No Asbestos Detected
AB28 E Offices - N Hall - SW corner None Detected
15 Mortar Between Bricks This material is the component of several walls throughout the building.
No Asbestos Detected
AB29 E Offices - N Hall - SW corner None Detected
16 Plaster Walls This material is the component of the walls in the restrooms and janitor closet.
No Asbestos Detected
AB30 E Offices - Janitor Closet - E wall None Detected
AB31 E Offices - Janitor Closet - N wall None Detected
AB32 E Offices - Women's Room - S wall None Detected
AB33 E Offices - Women's Room - E wall None Detected
AB34 E Offices - Men's Room - Center None Detected
17 HVAC Duct Wrap This material is on the metal ducts throughout the building.
No Asbestos Detected
AB35 E Offices - Comm Room - Center above ceiling None Detected
AB36 E Offices - Office 7 - Center above ceiling None Detected
AB37 E Offices - Office 3 - Center above ceiling None Detected
18 12x12 Brown Floor Tile This material is in the storage room at the SE corner of the building.
Non-Friable, Category I
AB38 E Offices - Storage Room - Adj. door to hall 2% Chrysotile
19 Black Mastic Beneath Floor Tile This material is in the storage room at the SE corner of the building.
Non-Friable, Category II
AB39 E Offices - Storage Room - Adj. door to hall 5% Chrysotile
Asbestos Survey
Bldg. 423
Macrotec Job #09649
Page 3Page 10 of 41
20 Brown Mastic Behind Base Cove This material is behind base cove within the building.
No Asbestos Detected
AB40 E Offices - Storage Room - Adj. door to hall None Detected
21 Light Pink 12x12 Floor Tile This material is in most rooms of the east office area.
No Asbestos Detected
AB41 E Offices - S Hall - NW corner None Detected
22 Yellow Mastic Beneath Floor Tile This material is in most rooms of the east office area.
No Asbestos Detected
AB42 E Offices - S Hall - NW corner None Detected
23 Floor Coating This material is throughout the west bay/office area.
No Asbestos Detected
AB43 W Bay/Offices - Equip Storage - NW corner None Detected
24 Heavy Texture on Walls This material is on the walls of the offices, break rooms and storage room.
No Asbestos Detected
AB44 W Bay/Offices - Equip Storage - NW corner None Detected
AB45 W Bay/Offices - Office 10 - W wall None Detected
AB46 W Bay/Offices - Office 12 - S wall None Detected
AB47 W Bay/Offices - Hall - Adj. office 11 None Detected
AB48 W Bay/Offices - Office 15 - N wall None Detected
AB49 W Bay/Offices - Break Room 3 - NW corner None Detected
AB50 W Bay/Offices - Loading Bay - E wall None Detected
25 Yellow Mastic Behind Wood Paneling This material is in the equipment storage room.
No Asbestos Detected
AB54 W Bay/Offices - Equip Storage - NW corner None Detected
26 2x4 Ceiling Tile (Heavy Dot) This material is on several ceilings within the building.
No Asbestos Detected
AB57 W Bay/Offices -Office 11 - N wall None Detected
Asbestos Survey
Bldg. 423
Macrotec Job #09649
Page 4Page 11 of 41
27 12x12 Light Brown Floor Tile This material is in the vault.
No Asbestos Detected
AB58 W Bay/Offices - Vault - SW corner None Detected
28 Yellow Mastic Beneath Floor Tile This material is in the vault.
No Asbestos Detected
AB59 W Bay/Offices - Vault - SW corner None Detected
29 Mud on HVAC Duct Insulation This material is on the ducts in the electrical room.
No Asbestos Detected
AB60 Mech Rooms - Electrical - SE corner None Detected
30 Gasket on Green Chiller Tank This material is in the mechanical room.
No Asbestos Detected
AB62 Mech Rooms - Chiller - Center None Detected
31 Gasket on Deluge Valve This material is in the mechanical room.
No Asbestos Detected
AB63 Mech Rooms - Chiller - SE corner None Detected
32 Black Foam Pipe Insulation This material is in the mechanical room.
No Asbestos Detected
AB64 Mech Rooms - Chiller - Center None Detected
33 White Pipe Wrap Atop Fiberglass (TSI) This material is on the pipes in the chiller room.
Friable, RACM
AB65 Mech Rooms - Chiller - SE corner 3% Chrysotile
Asbestos Survey
Bldg. 423
Macrotec Job #09649
Page 5Page 12 of 41
Appendix B
Appendix B - Lead Assessment
Macrotec Job #09649 - Bldg. 423; WO# 12591
The following table lists each of the painted surfaces suspected to contain lead at the subject site. For each painted surface, the sample number, location and laboratory result are listed.
Sample
Painted Surface Description
Sample Location Description
Lab Result (Parts per Million)
L2 E Offices - Comm Room - E side Below Reportable LimitWhite Sheet Rock Wall
L3 E Offices - Comm Room - W side Below Reportable LimitWhite Brick Wall
L4 E Offices - Office 4 - W doorway 1,508Brown Metal Door Frame
L5 E Offices - Office 1 - NW corner 2,038Brown Metal Window Frame
L6 E Offices - N Hall - N doorway Below Reportable LimitBrown Metal Door
L7 E Offices - Office 5 - W doorway Below Reportable LimitWhite Wood Door
L8 E Offices - Office 6 - N doorway Below Reportable LimitWhite Wood Door Frame
L9 E Offices - S Hall - N doorway Below Reportable LimitBrown Wood Door Frame
L10 E Offices - Office 9 - W doorway Below Reportable LimitGray Wood Door
L11 E Offices - Office 9 - N doorway Below Reportable LimitGray Wood Door Frame
L12 E Offices - Office 8 - W doorway 338Gray Metal Door Frame
L13 E Offices - Janitor Closet - Adj. door Below Reportable Limit1x1 Brown Ceramic Tile
L14 E Offices - Janitor Closet - N wall 5244x4 Beige Ceramic Tile
L15 E Offices - Men's Room - W wall Below Reportable Limit12x12 Blue Ceramic Tile
L16 E Offices - Women's Room - Center Below Reportable LimitBeige Metal Stall Divider
L17 E Offices - Men's Room - Center Below Reportable LimitBlue Metal Stall Divider
L18 E Offices - N Hall - E wall Below Reportable LimitBeige Sheet Rock Wall (On original wall)
L20 W Bay/Offices - Equip Storage - NW corner
Below Reportable LimitYellow Sheet Rock Wall
Asbestos / Lead Paint Survey
Bldg. 423
Macrotec Job #09649
Page 1Page 14 of 41
Appendix B
Sample
Painted Surface Description
Sample Location Description
Lab Result (Parts per Million)
L21 W Bay/Offices - Equip Storage - SE corner
Below Reportable LimitYellow Brick Wall
L22 W Bay/Offices - Equip Storage - S doorway
3,039Gray Metal Door Frame
L23 W Bay/Offices - Office 12 - SE corner Below Reportable LimitWhite Sheet Rock Wall
L24 W Bay/Offices - Office 12 - E doorway Below Reportable LimitWhite Wood Door Frame
L25 W Bay/Offices - Office 12 - SE corner Below Reportable LimitGray Metal Electrical Box
L26 W Bay/Offices - Office 15 - S wall Below Reportable LimitPink Sheet Rock Wall
L27 W Bay/Offices - Hall - Adj. door to bay 1,202Gray Metal Door
L28 W Bay/Offices - Loading Bay - N doorway
Below Reportable LimitGray Wood Door Frame
L29 W Bay/Offices - Loading Bay - S door 166Gray Metal Roll Door
L30 W Bay/Offices - Vault - SW corner Below Reportable LimitTan Block Wall
L31 Mech Rms. - Chiller - NE corner Below Reportable LimitWhite Brick Wall
L32 Mech Rms. - Chiller - NE corner Below Reportable LimitWhite Metal Stand
L33 Mech Rms. - Chiller - NE corner Below Reportable LimitWhite Metal Electrical Box
L34 Mech Rms. - Chiller - Center 742Green Metal Chiller Tank
L35 Mech Rms. - Chiller - SE corner 650White Metal Pipe
L36 Mech Rms. - Chiller - E doorway 115White Metal Door Frame
Asbestos / Lead Paint Survey
Bldg. 423
Macrotec Job #09649
Page 2Page 15 of 41
Appendix C
Asbestos & Lead Based Paint Survey
Nellis AFB, Bldg. 423
Macrotec Project # 09649
Appendix C
* Diagram Not Drawn To Scale
Sample Location Diagram N
AB3
AB23
AB38
AB62
AB1
Office
Office
Office
Office
Office
7Break Room
S to ra g e
ElectricalMechanicalChiller
Office
Office
Vault Comm Room
Equip Storage
Break Room 2
Office
Office
Office
Office
Office
Office
Office
Office
Break Room 3
Load Bay
Bay
Men’s
Women’s
N HallS Hall
AB16
AB60 AB61
AB22
AB34
AB33
AB32
AB19
AB30
AB31
AB54
AB43
AB44
AB51
AB45
AB55
AB46
AB57
AB52
AB47
AB56
AB48
AB49
AB53
AB50
AB58
AB59
AB63
AB65
AB64
AB13
AB35
AB11
AB12
AB15
AB7
AB26
AB5
AB27
AB41
AB42
AB39
AB40
AB4
AB18 AB10
AB8
AB14
AB9AB17 AB25 AB24 AB2
Asbestos & Lead Based Paint Survey
Nellis AFB, Bldg. 423
Macrotec Project # 09649
Appendix C
* Diagram Not Drawn To Scale
Sample Location Diagram N
L35
Office
Office
Office
Office
Office
7Break Room
S to ra g e
ElectricalMechanicalChiller
Office
Office
Vault Comm Room
Equip Storage
Break Room 2
Office
Office
Office
Office
Office
Office
Office
Office
Break Room 3
Load Bay
Bay
Men’s
Women’s
N HallS Hall
L36
L34
L33
L32
L31
L9
L11
L12
L10
L28
L30
L29
L26
L27
L25
L24
L23
L22
L4
L8
L7
L18
L5
L6
L17
L2
L15
L16
L21
L14
L13
L20
L3
Appendix D
File details come from the government source that posted it. Updated .