This document is a Statement of Work (SOW) for the installation of kitchen equipment at Buildings 1225 and 4625 at Cannon Air Force Base (CAFB) in New Mexico. The contractor shall provide all labor, materials, and supervision necessary to remove existing equipment and install new kitchen equipment as specified in Attachments 1 and 2. The work includes electrical and plumbing modifications as required. The contractor must adhere to security requirements, including background checks for all personnel, and prevent any damage to government property. Unsatisfactory performance will result in the work being re-accomplished at the contractor's expense. The work must be completed within 90 days of contract award.

The related federal contract opportunity is for the modernization of the Dining Facility (DFAC) equipment at CAFB. This is a sources sought announcement, and no solicitation is available at this time. The government is seeking 36 specific pieces of kitchen equipment, including combi ovens, refrigerators, fryers, and work tables. The estimated installation and delivery services are included in the listing. The contracting agency is the Department of the Air Force Special Operations Command.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

Equipment Installation, Bldg. 1225 & 4625

27th Special Operations Force Support Squadron, Cannon AFB, NM

21 June 2024

1. GENERAL INFORMATION: The contractor shall provide all required kitchen equipment, tools, and equipment necessary to install all equipment in accordance with this Statement of Work (SOW).

1.1. DELIVERY DATE: Delivery and installation of furniture shall be completed no more than 90 days after award of contract.

1.2. HOURS OF OPERATION: Contractor personnel shall perform the installation during normal business hours until completion. Exceptions to those hours will be weekends, holidays, and AFSOC indicated down-days.

Scheduled coordination will be conducted at contract award.

2. POC INFORMATION: Name and point of contact information will be provided upon award of the contract.

3. SCOPE OF WORK: The contractor shall provide all labor, materials, equipment, and supervision necessary to complete the renovation of the kitchen equipment as outlined in this SOW. The work includes, but is not limited to, the following tasks: 1) Removal and disposal of existing kitchen equipment, 2) Installation of new kitchen equipment, and 3) Electrical and plumbing modifications as required.

3.1. The spaces where the kitchen equipment will be installed are specific. For design purposes, pictures of the kitchen layout will be provided in Attachments 1 & 2.

3.2. Once the contract has been awarded, it becomes the responsibility of the contractor to validate the actual site conditions as well as any specific programming needs of the customer. Design work after evaluation may result in changes to the sizing or other necessary modifications tot he specifications provided. It is understood that the actual site parameters or certain customer requirements may deviate from the standard typical layouts, therefore any deviation that causes an increase in the price submitted during the bid process must be documented in writing and submitted to the Contracting Officer for review, along with a floorplan reference to show just cause. A final furniture layout and Bill of Materials (BOM) shall then be provided meeting the customer requirements and accommodating the physical environment.

4. SPECIFIC REQUIREMENTS

4.1. BUILDING 1225 & 4625: Reference Attachments 1 & 2

4.1.1. Removal and Disposal – Safety disconnect and remove all specified outdated kitchen equipment.

Dispose of removed equipment in accordance with local regulation and Air Force policies.

4.1.1.1. Install new kitchen equipment as specified in the equipment list (Attachment 1). Ensure all installations comply with manufacturer specifications and Air Force safety standards. Perform all necessary electrical and plumbing modifications to accommodate new equipment.

4.1.1.2. Testing and Commissiong – Test all installed equipment to ensure proper operation. Address and correct any deficiencies identified during testing. Provide a commissioning report detailing the testing process and results.

4.2. SECURITY REQUIREMENTS

4.2.1. All work in Pecos Trail Dining Facility and High Plains Café must be done within a secure area. All personnel subjected to this Statement of Work must adhere to 27 SOW security requirements. All works must be cleared and escorted by 27 SOFSS personnel. No unapproved electronic devices are allowed.

5. REQUIREMENTS: The required work shall be performed in accordance with this Statement of Work and all applicable Federal, State, local laws, and regulations.

5.1. MANDATORY BACKGROUND CHECK/SECURITY REQUIREMENTS: All Contractor personnel supporting the installation shall undergo a thorough security background check to ensure supporting personnel meet the required clearance in accordance with the DoD guidance and REAL ID Act of 2005. To enable the security checks to be conducted in a timely manner, the Contractor shall submit to the Contractor Officer (CO) and the 27th Special Operations Contractor Squadron Project Supervisor, within three (3) duty days after the contract award, to the following information for each employee that will require to be escorted on Cannon AFB in support of the kitchen equipment delivery and installation.

• Full Name (including middle name, if any):

• Date of Birth:

• Social Security Number:

• State ID Number of Driver’s License Number and State of Issue:

In addition, a rental agreement or vehicle registration and insurance shall be provided for each employee that will be operating a vehicle in the premises of the base.

5.2. DAMAGE/SAFETY: The Contractor shall conform to the safety requirements contained in the contract for all activities related to the accomplishment of the work as required by OSHA. The Contractor shall provide protection to government property to prevent damage during the period of time the property is under the control or in possession of the Contractor. Any damage caused by the Contractor during installation is the responsibility of the Contractor and must be reported to the Contractor Officer or designated Contractor Officer.

Representative promptly (within two (2) hours) along with all available facts relating to each instance of damage to government property or injury to either Contractor or Government personnel.

5.3. UNSATISFACTORY PERFORMANCE: Unsatisfactory performance shall result in work being re-accomplished at the Contractor’s expense with no additional cost to the Government.

5.4. PHOTOS: No worker shall take photos at any time while on Cannon AFB. All photos shall be coordinated with 27 SOW/SSO office via Mr. Nicholas Kingsley and Mr. Robert Brewster.

5.5. STORAGE: The Contractor shall store and safeguard materials until the contractor has prepared the worksite for installation. No storage is available on Cannon AFB unless authorized by the CO.

Attachments:

1. CAFB B1225 27 SOFSS EQUIPMENT LAYOUT

2. CAFB B4625 27 SOFSS EQUIPMENT LAYOUT