DEPARTMENT OF THE AIR FORCE

27TH SPECIAL OPERATIONS CONTRACTING SQUADRON

CANNON AIR FORCE BASE NEW MEXICO

AIR COMMANDOS

10 May 2021

MEMORANDUM FOR ALL CONTRACTORS

FROM: 27 SOCONS/PKB

110 E. Alison Ave Cannon AFB, NM 88101

SUBJECT: RFI 001 for Solicitation FA485521B0001 – CZQZ 20-0071 Renovate B600 for ALS

1. What is the width of the new drywall on Sheet G003? The Specs list both ½” and 5/8”

The SOW states 5/8” thickness.

2. Is the new carpet on Sheet G005 to be broad loom or carpet tile?

Carpet shall match existing (I believe it is broad loom but we can verify at the site visit). For those will not be at the site visit, findings/updates will be published on beta.sam.gov.

3. Sheet G006 says to install new breakroom cabinets, counter top and kitchen sink in Room 2018. The sheet before G008 shows a new counter at room 2108 does not indicate whether base cabinets and wall cabinets are to be installed as well.

Just base cabinets. Also cabinets are only being installed in one room (Room 2108 as indicated on the drawings).

4. The Specs list several types of Counter top material. Which are to be used for the new counter tops?

Particle Board, Hard Wood and Granite are all acceptable as long as the pattern/design meets base architectural standards. Since award will be based on the lowest priced bid that is responsive to the terms of the solicitation, special consideration will NOT be given to a contractor who selects nicer material (i.e. hard wood or granite).

5. The Drawing Index doesn’t match what is in the actual drawings. Are the drawings complete or are there pages missing? Also there are pages in the drawings that aren’t listed in the index.

The drawings are complete and show the entire scope of the project. Disregard the Drawing Index.