Attachment_1._Range_Residue_Removal_(R3)_PWS.pdf

PDF 784 KB Posted

Attached to
Range Residue Removal (R3) Federal contract opportunity
Solicitation number
FA4855-17-R-0025
Issued by
Department of the Air Force Special Operations Command

About this file

Performance Work Statement

View the file

Other files for this federal contract opportunity

Other files attached to Range Residue Removal (R3), newest first.
File Type Posted
QA_30_Aug_17.pdf PDF
REVISED_Range_Residue_Removal_(R3)_PWS_Amendment_1.pdf PDF
Attachment_2._Wage_Determination_15-5457_Rev._4.pdf PDF
Attachment_3._MAFR_Contractor_Training,_Access,_and_Scheduling.pdf PDF
RFP__FA4855-17-R-0025.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contract: FA4855-TBD Range Residue Removal (R3) Attachment 1 Solicitation: FA4855-17-R-0025 Performance Work Statement Dated: 28 June 2017

PERFORMANCE WORK STATEMENT (PWS)

TABLE OF CONTENTS

SECTION PAGE

1.0 DESCRIPTION OF SERVICES 3-6

2.0 PERFORMANCE MANAGEMENT REQUIREMENTS 6

3.0 SERVICE SUMMARY/DELIVERABLES 7

4.0 REPORTING REQUIREMENTS 7

5.0 RANGE RESIDUE REMOVAL ACTIVITIES 8-9

6.0 ESTIMATED QUANITITES 9

7.0 DESCRIPTION LIST 9-10

8.0 DISPOSITION 10-11

9.0 GENERAL INFORMATION 11-13

10.0 APPLICABLE DOCUMENTS 13-14

11.0 REPORTS AND DOCUMENTATION 15-18

12.0 APPENDIX 19

1.0 DESCRIPTION OF SERVICES

The contractor shall provide all labor, material, and equipment to provide Range Residue Removal (R3) from Melrose Air Force Range (MAFR) in Floyd, New Mexico, in accordance with (IAW) all federal, state, and local rules and regulations. Work will include, but is not limited to: residue inspection and demilitarization (demil) (including documentation), handling of materials IAW Resource Conservation and Recovery Act (RCRA). Transfer of Low Level Radioactive Waste (LLRW) or RCRA-regulated materials to the Contracting Officer Representative (COR) for Government disposition and transfer of processed range residue to either recycling centers or landfills. The contractor shall provide a third party quality assurance expert (3rd party QA) to provide final certification of all materials prior to release from DoD control.

Contractor shall inspect and document munitions and range-related debris considered Material Potentially Presenting an Explosive Hazard (MPPEH) IAW DoD Instruction 4140.62.

DoD Instruction 4140.62 states, “Munitions and range-related debris are considered MPPEH until properly inspected and documented as Material Determined As Safe (MDAS). Only MDAS will be released to the public. A chain of custody must be maintained until MDAS is released from DoD control and a legible copy of the documentation of MDAS determination will accompany the material when it is transferred.” DoD Explosive Safety Board (DDESB) Technical Paper 18 (TP 18) specifies personnel qualifications to inspect and/or certify MPPEH as safe. Munitions debris is composed of expended munitions and components or fragments. Range debris includes expended target materials such as salvaged vehicles, shipping containers, tires and other materials used to fabricate targets. Hard targets are more durable (tanks, armored personnel carriers and heavy equipment) and may have munitions embedded in them.

MPPEH has been placed in a residue holding area (RHA). Munitions and munitions debris has been segregated and sorted by type of material, i.e. vehicles, heavy equipment, etc., but some debris may be commingled. The debris may contain unexploded ordnance (UXO), explosives or explosive components, LLRW, or RCRA-regulated wastes such as automotive fluids. Military equipment may require demil.

Debris shall be recycled whenever possible. Residue with no recycling value (tires, retarder parachutes, wood, and other debris) shall be processed for release to landfills.

The estimated annual amounts of residue from MAFR is listed in Section 6.0.

1.1. Performance Objectives

1.1.1. The primary goal of this project is to ensure that all processed residue material released to the public is demilitarized, free of hazards to human health and safety, and that all range residue is managed as required by applicable Federal, State and local laws as well as DoD and Air Force directives.

1.1.2. The secondary goal is to provide sound stewardship of natural and man-made resources.

1.1.3. Since range residue addressed in this project may contain explosives, ignitable residue, LLRW and RCRA managed hazardous wastes, the contractor shall:

1.1.3.1. Separate materials by categories;

1.1.3.2. Demilitarize weapon systems, munitions and equipment, IAW DoDI 4160.28-M;

1.1.3.3. Certify that MDAS is free of energetic material according to DoDI 4140.62;

1.1.3.4. Notify Contracting Officers Representative (COR) and Contracting Officer (CO) if LLRW or RCRA regulated material is encountered;

1.1.3.5. Segregate LLRW within the RHA;

1.1.3.6. COR will notify the Installation Radiation Safety Officer (IRSO);

1.1.3.7. Characterize the RCRA regulated material and remove from the RHA to the Initial

Accumulation Point (IAP), notify the COR;

1.1.3.8. Temporarily halt processing activities and notify the COR if any UXO, or suspected UXO is identified;

1.1.3.9. Dispose of all waste material in accordance with applicable regulations and requirements;

1.1.3.10. Document RHA clean-up data in the close out report;

1.1.3.11. Use chain-of-custody procedures to track all MDAS leaving the range;

1.1.3.12. Obtain all required Federal, State, and Local permits.

1.2. Performance Phase:

Deliverables: Contractor shall provide the following 15 days after contract award.

See Appendix A.

1.2.1. Spill Prevention Plan: IAW Cannon AFB Spill Plan

1.2.2. Safety Plan: IAW OSHA, Federal, State, and local regulations. Contractor shall include all safety procedures and personal protective equipment (PPE). See Attachment 3.

1.2.3. Quality Control (QC) Plan: IAW all applicable Federal, State, and local regulations.

The plan must describe the MPPEH post-processing QC sampling method.

1.2.4. Schedule: The contractor shall develop a mobilization plan for MAFR to describe the schedule of equipment arriving on site.

1.2.2. Residue Processing: The contractor shall perform on-site inspection, processing and certification of all residue as MDAS. Certification shall be documented IAW DoDI

4140.62 Paragraph 3.2. Tasks include, but are not limited to: radiological sweep and explosive safety inspection, demil of military equipment and all associated documentation/certification of these actions; UXO reporting, shearing or crushing; site safety; chain-of-custody control and documentation; handling of LLRW; handling and characterization of RCRA-regulated material; and work site collection of fragments/residue resulting from processing activities.

1.2.3. Range Residue (MPPEH and Miscellaneous Debris): The contractor shall have UXO technicians inspect all range residue before and post-processing. The contractor must ensure MDAS is secured where it cannot be contaminated with MPPEH. The contractor shall have UXO technicians assess any suspect UXO. Known or suspected UXO will be assessed for movement to a secure, approved UXO holding area (RHA) to await destruction by government EOD personnel. If the UXO is deemed unsafe for movement the contactor shall stop work, cordon off the area, and notify the COR.

1.2.4. Target vehicles: The contractor shall inspect all expended target vehicles (including heavy equipment and armored vehicles) for embedded munitions. Large driveline components with visual evidence of munitions impact shall be drained, cut open, and visually inspected by the contractor. The contractor shall collect vehicle fluids. Fluids shall be delivered to the government waste IAP at the range.

1.2.5. Disposition: The contractor shall dispose of MDAS as soon as practical following the residue processing phase. Contractor shall maintain the chain-of-custody and MDAS integrity until final disposition. Recycle MDAS to the maximum extent possible. Dispose of all MDAS IAW federal, state, and local laws and procedures. LLRW and/or RCRA-regulated materials will be handled IAW federal and installation program requirements.

1.2.6. Certification: Munitions and range debris require the following certifications. All processed material shall be accompanied by full documentation/certification and a completed DD Form 1348-1A (Issue Release/Receipt Document), AF Form 2005 (Issue/Turn-In Request), and chain-of-custody termination documentation with receipt by a recycler or landfill. An example DD Form 1348-1A is shown in Section 10.3. The Senior UXO Supervisor (SUXOS) maintains overall responsibility for all on-site range residue certifications.

1.2.7. MPPEH will be documented as MDAS. Contractor shall provide a UXO Technician III or higher to certify MDAS. The SUXOS is responsible for all on-site MPPEH inspection activities. This individual shall provide certifications with documentation of specialized training in the type of MPPEH expected at MAFR. The 3rd party QA will provide final certification of MDAS prior to transport off the range.

1.2.8. The contractor shall document the demilitarization of military aircraft, equipment and munitions signed by demil qualified personnel and the 3rd party QA.

1.2.9. The contractor shall document a radiological survey of all residues signed by the 3rd party QA.

1.2.10. Work Documentation: The contractor shall prepare and submit to both the Contracting Officer (CO) and Contracting Officer Representative (COR) documentation related to work performance, to include a close-out report. Documentation shall include:

completed chain-of-custody (DD From 1348-1) for all MDAS terminating in receipt by a recycler or landfill; weight tickets for shipment of all material transported from the site;

and summaries of quantities processed, i.e. documentation of the quantity of each item managed on-site.

1.2.11. Third Party Quality Assurance (3rd party QA): Provide 3rd party QA expert to perform final review, certification, and documentation of all MDAS prior to transport off-range for recycling or disposal. No site activity will take place without 3rd party QA personnel on-site. The 3rd party QA will have “stop work” authority and will monitor R3 activities unless otherwise specified. The 3rd party QA shall not be an employee of the contractor. The 3rd party QA shall be the second signatory to certify MDAS, weight, and contents of each shipment prior to leaving work site.

2.0 PERFORMANCE MANAGEMENT REQUIREMENTS

2.1. Identification of Responsible Personnel:

2.1.1. Government Personnel:

2.1.1.1. Contracting Officer (CO)

2.1.1.2. Contracting Officer Representative (COR)

2.1.2. Contractor Personnel:

All work site personnel must have a current OSHA 40-hour Hazardous Waste Operations (HAZWOPER) training IAW DDESB TP 18 Table 4.1.

Contractor shall provide a list of required personnel certifications to the CO and COR within 15 days of contract award and submit changes within 5 days.

2.1.2.1. Program Manager. Program management experience of range residue removal, munitions response or remediation at UXO contaminated sites. The Program Manager shall have regular contact with the CO and daily contact with the COR to update them on site progress. An alternate Program Manager shall be assigned.

2.1.2.2. Program Safety Officer. Shall meet the requirements of DDESB TP 18.

2.1.2.3. Senior UXO Supervisor (SUXOS). Shall meet the requirements of DDESB TP 18, Table 4.2. The SUXOS or acting site manager must also have 8-hour HAZWOPER Supervisor training. No site activity will take place without the presence of a qualified

SUXOS.

2.1.2.4. 3rd Party QA. Shall meet the requirements of DDESB TP 18.

UXO Technician I must not perform inspection duties designated for higher qualified personnel.

2.2 Coordination:

Contractor shall coordinate UXO procedures with the COR. The Safety Plan shall include procedures for notification if UXO are found, use of a UXO holding area and procedures when EOD cannot respond immediately. See Appendix A.

2.3 Government Furnished Services

The Government will provide the following Services:

2.3.1. Range safety briefing.

2.3.2. Environmental and cultural resource protection training as needed.

2.3.3. Points of contact (CORs).

2.3.4. Radios required for range access and movement control.

Space will be made available for a contractor-provided office trailer; however, utility connections will be at the contractor’s expense. Electricity may or may not be available, depending on the location. Potable water or sanitary facilities are not provided.

3.0 SERVICE SUMMARY (SS) /DELIVERABLES

Table 1 lists the performance objective and performance threshold for each task in the contract. This performance threshold provides a vehicle to align performance with the government standard/business objective and provides a focus on critical success factors in meeting these objectives.

PERFORMANCE

OBJECTIVE

PWS REF.

PERFORMANCE

THRESHOLD

METHOD OF

ASSESSMENT

REMEDY

Identify, recover, turn-in and/or notify the government of the presence of items/materials which present a safety or environmental hazard

1.1.3.

1.1.3.10.

5.3.1.

100% of all items identified, recovered, segregated, transported, appropriate personnel notified and material turned over to the government, as needed

Random Inspections

Re-performance

IAW all federal, state, and local regulations

Demilitarization Requirements

1.1.3.2.

5.3.2.

100% compliance with DoD 4160.21-M and DoD 4160.28-M

Random Inspections

Re-performance prior to shipment

3rd Party QA 1.2.8.

1.2.9.

1.2.11 2.1.2.4.

100% presence during all R3 activities Final signatory of MDAS status

Random Inspections

Stop Work until 3rd Party

QA on-site

Certification and validation of all residue

1.2.2.

1.2.3. 100% documentation of all inspections, demilitarization actions and MDAS status accompanies the material

Random Inspections

Re-performance prior to shipment

Chain of Custody 1.1.3.11.

1.2.10.

7.2.2.

7.3.1.

100% chain of custody documentation for all processed material through final disposition

100% Inspections

Re-performance by next working day

4.0 REPORTING REQUIREMENTS

4.1. Close-out Report:

The contractor shall also submit a close-out report with a summary of all material shipment, discovery logs for UXO, LLRW, and RCRA materials, any lessons learned and full accounting of recyclable material quantities. A sample Shipping Summary is shown in Section 10.2.

5.0 RANGE RESIDUE REMOVAL ACTIVITIES

5.1. Radioactive Material.

5.1.2. The contractor shall perform a radiological survey of all range debris (particularly military aircraft, vehicles, and hardware) prior to processing. LLRW is usually found in luminous dials on military vehicles, but may be found as structural material (Magnesium- Thorium alloy) or in electronic components. LLRW will be removed, segregated, and packaged for transfer. The contractor shall notify the COR of the presence of LLRW for coordination with the IRSO. The Government will schedule pick-up and final disposal of LLRW. The contractor shall document the material, quantity, detection instrument make/model and readings obtained and will place a copy of the LLRW discovery report with the packaged material, provide a copy to the COR and include a copy in the close-out report. The contractor shall notify the COR if LLRW is widespread. The contractor shall maintain a log of LLRW discovered during the work effort and document radiological surveys.

The contractor will follow Table 1 of the Nuclear Regulatory Guide 1.86. Documentation will be certified on the DD Form 1348-1 and AF Form 2005 (see section 10.3 and 10.4).

5.2. RCRA-Regulated Material.

5.2.1. The contractor shall survey range debris for the presence of RCRA-regulated materials such as batteries, antifreeze, oil, asbestos, PCBs, etc. RCRA materials shall be characterized, collected and delivered to the nearest on-range hazardous waste IAP permitted to receive it for eventual disposal by the government. The contractor shall coordinate with the COR to ensure proper receipt of the material. The contractor shall comply with requirements in 40 CFR and the installation hazardous waste program. The contractor shall notify the COR if RCRA-regulated materials are widespread. The contractor shall also maintain a log of RCRA materials discovered at the work site.

5.3. Processing:

5.3.1. Inspection.

All MPPEH will undergo a 100% inspection and a second 100% re-inspection by qualified personnel IAW PWS 2.1.2.1 through 2.1.2.4. to determine the presence of UXO, explosives or explosive components. The contractor shall move UXO and explosive components to a secure, approved UXO holding area (RHA), or stop work and notify COR.

Use of a DDESB-approved processing method (crushing, shearing, etc.) may take the place of the first inspection, but will be followed by the required second 100% inspection or a post-processing QC inspection using an approved sampling method. The contractor shall maintain a log of UXO or explosive components discovered during the work effort and document explosive safety inspections.

5.3.2. Demilitarization.

Military aircraft, vehicles, equipment, and munitions shall be demilitarized by qualified personnel IAW DoD manuals 4160.21-M and 4160.28-M. The contractor shall process munitions to the extent that they shall not be recognizable as munitions and interior cavities shall be exposed.

Sub-scale practice munitions (e.g. BDU-33), expended rockets and warheads, inert projectiles, guided missile and guided bomb components will be run through a process that reduces these items into 4-inch pieces or smaller. Full-scale inert bombs will be cut into at least four pieces. The inert filler (normally vermiculite and concrete) will be removed and left on site.

5.3.3. Crushing.

Items subjected to crushing will be broken down such that 85% of the end product is not more than 4 inches and interior cavities are exposed IAW DoD manual 4160.28-M, Appendix to Enclosure 3 - Category II, Guns and Armament and Category III, Ammunition/Ordnance.

5.3.4. Shearing.

An industrial shear may be used to cut or disassemble bombs, aircraft, light vehicles, CONEX containers or other miscellaneous metals to meet inspection, demil or recycling requirements.

6.0 ESTIMATED QUANTITIES

The quantities listed below are estimates of the materials at MAFR to be removed by the contractor. The actual amounts may vary.

Description

Unit MAFR

Subscale practice munitions* Ton 135 500# Inert Bomb Each 175 750# Inert Bomb Each 0 1,000# Inert Bomb Each 4 2,000# Inert Bomb Each 0 Tank, Armored Each 9 APC / Light Vehicles / Aircraft Ton 200 Miscellaneous Metal Debris Ton 200 Trash Disposal Ton 60

* BDU-33/MK 106/2.75-inch rockets

7.0 DESCRIPTION LIST

7.1. Sub-scale practice munitions

Description: Consists of BDU-33, MK 76, MK 106, 5-inch and 2.75-inch rockets, and other similar sized munitions, either whole or their components, which require demil. Interior cavities will be exposed to allow for visual inspection. 85% of output will be no longer than 4 inches.

7.2. 500lb inert bomb Description: Consists of MK 82, BDU-45 or BDU-50 full-scale inert bombs. Processing will remove the nose and tail of the bomb and cut the center section into at least two (2) pieces. The inner filling (normally low-strength concrete and vermiculite) will be removed and left on site.

7.3. 750lb inert bomb Description: Consists of M117 750lb class bombs. Processing will remove the nose and tail of the bomb and cut the center section into at least two (2) pieces. The inner filling (normally low-strength concrete and vermiculite or sand) will be removed and left on site.

7.4. 1000lb inert bomb Description: Consists of MK 83 1000lb class bombs. Processing will remove the nose and tail of the bomb and cut the center section into at least two (2) pieces. The inner filling (normally low-strength concrete and vermiculite or sand) will be removed and left on site.

7.5. 2000lb inert bomb Description: Consists of MK 84, BDU-56 or BLU-109 full-scale inert bombs. Processing will remove the nose and tail of the bomb and cut the center section into at least two (2) pieces. The inner filling (normally low-strength concrete and vermiculite) will be removed and left on site.

7.6. Tank, armored

Description: Consists of heavily armored, tracked fighting vehicle with a main battle gun (usually 105MM or greater) intended to be employed in combat. These vehicles will be demilitarized IAW DoD 4160.28-M.

7.7. APC, light vehicles, aircraft

Description: Consists of lightly armored, tracked vehicles (armored personnel carriers (APC)), howitzers, tank cranes, light and general purpose wheeled vehicles, construction equipment, aircraft and other “non-tank” armored vehicles. These will be demilitarized IAW DoD 4160.28-M.

7.8. Miscellaneous metal debris

Description: Consists of miscellaneous recyclable metal materials. Examples include:

pipes, culverts, expended ammunition and brass cartridges, CONEX containers, sheet metal, angle iron, rebar, dumpsters, etc.

7.9. Trash disposal

Description: Consists of all trash disposal operations. Includes (but is not limited to) sorting, certification, validation, demil, radiation monitoring, chain of custody, etc.

7.10. Waste characterization

Description: Consists of testing to determine or “characterize” an unknown waste material.

May include full testing or a lesser level of testing if material is known but confirmation is needed.

7.11. Third Party UXO Quality Assurance

Description: A third party individual qualified to perform duties described in Section 1.2.11.

8.0 DISPOSITION

8.1. Recycling:

8.1.1. MDAS described as scrap metal will be recycled to the maximum extent possible.

Once the recyclables are removed from the site, the contractor shall provide the COR the weights of the recyclables on the close-out report. Proceeds from the recycling shall be used to offset the costs for range residue removal.

8.1.2. Transportation. The contractor and 3rd party QA shall perform a final radiological and UXO check of each transport load, the load will be sealed, locked and weighed, and this information documented on the shipping papers. Radiation limits are established in the Nuclear Regulatory Guide 1.86, Table 1, Acceptable Surface Contamination Levels.

8.2. Trash:

8.2.1. MDAS with no recycle value will be disposed of by the contractor IAW all Federal, State, and Local laws.

8.2.2. Shipment Weights:

Scale sheets and/or weight tickets shall be used by the contractor to track loads, weights and receivers in support of the chain-of-custody and provide positive control of all material leaving the site.

8.3. RCRA-Regulated Materials:

8.3.1. All RCRA-regulated materials such as batteries, antifreeze, oil and other materials encountered shall be delivered to the nearest on-range hazardous waste IAP. The contractor shall coordinate with the COR to ensure proper receipt and chain of custody of the items. The contractor shall comply with requirements in 40 CFR 260-270 and installation procedures.

8.4. Low Level Radioactive Wastes (LLRW):

LLRW, such as luminous dials, shall be packaged and secured by the contractor in an on-site storage area designated by the COR. The contactor shall provide a copy of the LLRW discovery report to the COR when LLRW is placed at the secure, approved holding area (RHA). The report shall describe the material, quantity, detection instrument make/model and readings obtained.

9.0 GENERAL INFORMATION

9.1. Hours of Operation. Range hours of operation are 0800-1700. The contractor may work, with prior approval of the CO, extended hours to ensure timely completion of work at no additional cost to the government.

9.2. Federal Holidays.

New Year’s Day – 1 January Martin Luther King Day – 3rd Monday in January Washington’s Birthday – 3rd Monday in February Memorial Day – Last Monday in May Independence Day – 4 July Labor Day – 1st Monday in September Columbus Day – 2nd Monday in October Veteran’s Day – 11 November Thanksgiving Day – 4th Thursday in November Christmas Day – 25 December

If these holidays fall on Saturday, the preceding Friday will be observed. If these holidays fall on Sunday, the following Monday will be observed.

The Contractor is not required to perform services on Federal Holidays.

9.3. Contractor/Employee Base Pass and Identification, Special Clearance and Vehicle Passes. The Contractor shall comply with all requirements and procedures IAW FAR 5353.242-9000, Contractor Access to Air Force Installations. In addition, the contractor shall comply with MAFR Mission and Contractor Access. See Attachment 3.

9.4. Traffic Laws. The contractor and its employees shall comply with MAFR traffic regulations.

9.5. Weapons, Firearms, and Ammunition. Contractor employees are prohibited from possessing weapons, firearms, or ammunition, on themselves or within their Contractor-owned or privately owned vehicle while on MAFR.

9.6. For Official Use Only (FOUO). The contractor shall comply with DoD 5400-7-R, Chapter 4, DoD Freedom of Information Act (FOIA) Program requirements. This regulation sets policy and procedures for the disclosure of records to the public and for marking, handling, transmitting, and safeguarding FOUO material.

9.7. Reporting Requirements. Contractor personnel shall report to an appropriate authority any information or circumstances of which they are aware may pose a threat to the security of DoD personnel, contractor personnel, resources, and classified or unclassified defense information.

9.8. Physical Security. The contractor shall be responsible for safeguarding all government property and controlled forms provided for contractor use. At the end of each work periods, all government facilities, equipment, and materials shall be secured.

9.9. Personnel. Contractor personnel shall present a neat appearance. Contractor personnel shall be easily recognizable while on the installation in conjunction with this contract. This shall be accomplished through the wear of distinctive clothing, overcoats, or hats, bearing the company name or logo. The coloring or design of the items selected should be such that identifies personnel easily and quickly for reasons of safety and personal protection. The government is authorized to restrict the employment under the contract of any contractor employee or prospective contractor employee, who is identified as a potential threat to the health, safety, security, general well-being, or operational mission of the installation and its population.

9.10. Contracting Officer (CO) and Contracting Officer Representative (COR). The CO will appoint a primary and alternate representative for management of the day-to-day activities of the contract. The identity, title, and authority of this representative will be provided in writing to the contractor after contract award.

9.11. Safety Requirements and Reports. The contractor shall perform work in a safe manner as required by OSHA Safety and Health Requirements. Provide a verbal report to the CO as soon as possible of each occurrence of damage to Government property or an accident resulting in death, injury, occupational disease, or adverse environmental impact. Provide a complete copy of required Accident Investigation Reports to the CO within five (5) calendar days of each occurrence.

10.0 APPLICABLE DOCUMENTS

The following laws and regulations, at a minimum, apply to R3 activities on MAFR:

Clean Air Act: Contractor shall evaluate the local situation, determine, and obtain permits as necessary.

Clean Water Act: Spill prevention and control is required for fuel storage, runoff, and retention of any spillage of automotive fluids from salvage of expended target vehicles.

Endangered Species Act: Specific restrictions on operations is imposed on vehicle and equipment operations and work hours to protect endangered species that may exist.

Resource Conservation and Recovery Act (RCRA): RCRA requirements apply to the disposition of all material removed from the site.

Standards for Protection Against Radiation 10 CFR 20: Operations must fulfill the requirements of the regulations.

Demilitarization of MPPEH and Specified Equipment: Contractor shall follow DoD Manuals 4160.21 Volumes 1-4, 4160.28-M, Volumes 1-3, and DoDI 4140.62 and establish means to track the custody of demilitarized items from the site to the recycling vendor.

Occupational Safety and Health (OSHA): Contractor shall follow all applicable OSHA rules.

Material Potentially Presenting an Explosive Hazard (MPPEH): Contractor shall follow DoDI 4140.62 and AFMAN 91-201 to ensure material released from DoD control does not pose an explosive hazard to the public.

DoD Explosive Safety Board (DDESB) Technical Paper (TP) #18: Provides the minimum qualification for personnel conducting UXO related operations in support of the Department of Defense.

Guidance and reference documents include, but are not limited to, the following:

10.1. Federal, State and Local Regulations

10.1.1. 10 CFR 20, Standards for Protection Against Radiation

10.1.2. 29 CFR 1910.120, Occupational Safety and Health Standards, Hazardous Waste Operations and Emergency Response

10.1.3. 40 CFR 260-270, Environmental Protection Agency Hazardous Waste Management System, the Military Munitions Rule

10.2. DoD Regulations

10.2.1. DoD Instruction 4140.62, Material Potentially Presenting an Explosive Hazard

10.2.2. DoD 4145.26-M, DoD Contractor’s Safety Manual for Ammunition and

Explosives

10.2.3. DoD 4160.21-M, Defense Material Disposition Manual

10.2.4. DoD 4160.28-M, Defense Demilitarization Manual

10.2.5. AFI 32-7042, Solid and Hazardous Waste Compliance

10.2.6. AFI 32-7086, Hazardous Materials Management

10.2.7. AFI 40-201, Radioactive Materials (RAM) Management (Section 1.1.7.)

10.2.8. DoD Explosives Safety Board Technical Paper 18, Minimum Qualifications for

Unexploded Ordnance (UXO) Technicians and Personnel

10.3. Acronyms

AFSOC – Air Force Special Operations Command BDU – Bomb Dummy Unit DDESB – DoD Explosive Safety Board DoD – Department of Defense EOD – Explosive Ordnance Disposal HE – High Explosive IAP – Initial Accumulation Point IRSO – Installation Radiation Safety Officer LLRW – Low Level Radioactive Waste MAFR – Melrose Air Force Range MDAS – Material Determined As Safe MPPEH – Material Potentially Presenting an Explosive Hazard PCBs – Polychlorinated Biphenyls RCRA – Resource Conservation Recovery Act RHA – Residue Holding Area UXO – Unexploded Ordnance

11.0 REPORTS AND DOCUMENTATION

11.1. An example Close-Out Report.

11.2. An example Shipping Summary.

11.3. An example DD Form 1348-1A.

10.3. An example DD Form 1348-1A.

11.4. An example AF 2005.

APPENDIX A

DELIVERABLES

All deliverables must meet professional standards and the requirements set forth in the applicable contractual documents. The Contractor shall be responsible for delivering all end items specified. The following items are outputs, which fall within the scope of this effort and which are illustrative of the type of work the Government expects to require.

The following table lists deliverables.

Title Date Submission Distribution Copies

Spill Prevention Plan 15 calendar days after award 27 SOCONS/LGCA 1 Each Safety Plan 15 calendar days after award 27 SOCONS/LGCA 1 Each Quality Control (QC) Plan 15 calendar days after award 27 SOCONS/LGCA 1 Each

Schedule 15 calendar days after award 27 SOCONS/LGCA 1 Each

DoD Instruction 4140.62 states, “Munitions and range-related debris are considered MPPEH until properly inspected and documented as Material Determined As Safe (MDAS). Only MDAS will be released to the public. A chain of custody must be maintained u...
3.0 SERVICE SUMMARY (SS) /DELIVERABLES
Table 1 lists the performance objective and performance threshold for each task in the contract. This performance threshold provides a vehicle to align performance with the government standard/business objective and provides a focus on critical succe...
* BDU-33/MK 106/2.75-inch rockets
11.0 REPORTS AND DOCUMENTATION
11.1. An example Close-Out Report.
11.2. An example Shipping Summary.

File details come from the government source that posted it. Updated .