Questions_and_Answers_for_Concrete_Pad_and_Canopy_Project_Solicitation_FA4855-17-B-0006.pdf
PDF 100 KB Posted
- Attached to
- Concrete Pad GCE
- Solicitation number
- FA4855-17-B-0006
About this file
Questions and Answers.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_1_Concrete_Pad_&_Canopy.docx | DOCX document | |
| Plans_-_CZQZ_17-0003_SOF_Construct_Concrete_Pad.pdf | ||
| ATCH_2_SOMS.pdf | ||
| ATCH_5_WD_04072017_NM23.pdf | ||
| ATCH_1_SOW_Pad_&_Canopy.pdf | ||
| FA4855-17-B-0006.pdf | ||
| ATCH_6_Drawing_Canopy,_9-28-2013_Rev.2_.pdf | ||
| ATCH_4_Drawing.pdf | ||
| ATCH_3_General_Specs.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Please see below for responses. Thank you.
1.Ref: Statement of Work (SOW) - para 2.1.1.1 - Construct new reinforced concrete pad with concrete pad footings - Provide reinforcement requirements for each.
Answer: Please refer to (Plans) sheet S-101.
2. Ref: Statement of Work (SOW) - para 2.1.1.3 - New concrete pad footings - Advise if over-excavation is required.
Answer: Pad location is currently below the desired grade so it will need to be brought up and compacted with fill. Excavate as necessary to allow for 3 feet deep pad footings for a 8 inch thick concrete pad. Please refer to (Plans) sheet C-200 for top of pad elevations in reference to the southeast corner of existing adjacent concrete pad.
3. Ref: Statement of Work (SOW) - para 2.1.1.4 - New concrete pad turned down edge requirement - Provide detail.
Answer: Please refer to (Plans) sheet S-101.
4. Ref: Statement of Work (SOW) - para 2.1.2 - Construct asphalt paving drive (Refer to drawings) - The As-Built drawings do not indicate location - Please provide to quantify.
Answer: Please refer to (Plans) sheet C-300.
5. Ref: Statement of Work (SOW) - para 2.1.2 - Construct asphalt paving drive (Refer to drawings) - Please provide a detail.
Answer: Please refer to (Plans) sheet C-300 and C-301.
6. Ref: Statement of Work (SOW) - para 2.1.2.3 - All utilities that will cross-over the drive path must be sleeved and concrete encased - The As-Built drawings do not indicate location of the new pad - Please provide to quantify.
Answer: Please refer to (Plans) C-300 and C-302.
7. Ref: Statement of Work (SOW) - para 2.2 - Install government furnished Fabric Shelter - Advise if the shelter will be on site for erection.
Answer: Yes, the shelter will be on site provided by the government.
8. Q. Can mail thumb drive be used instead of CD or DVD?
Answer: We can’t used Thumb Drive for security and system capabilities reason
IAW AFM 33-152.