Atch_1_-_SOAZ_PWS_23_June_2016.doc

DOC document 195 KB Posted

Attached to
Special Operations Assault Zone (SOAZ) Service Federal contract opportunity
Solicitation number
FA4855-16-R-0004
Issued by
Department of the Air Force Air Combat Command

About this file

Attachment 1 - Performance Work Statement (PWS)

View the file

Other files for this federal contract opportunity

Other files attached to Special Operations Assault Zone (SOAZ) Service, newest first.
File Type Posted
Amendment_0004__8_July_2016.doc DOC document
Amendment_0002__5_July_2016.doc DOC document
Attachment_3_WD_Rev_2_dated_1_March_2016.doc DOC document
Amendment_0001_29_June_2016.doc DOC document
Atch_3_WD__-_word_2003.doc DOC document
24_June_1449_Solicitation.pdf PDF
Atch_2_SOAZ_Scheduled_Govt_Furnished_Property_.pdf PDF
Atch_4_DD_Form_254_SOAZ.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation No.: FA4855-16-R-0004

Attachment 1 Contract No.:

PERFORMANCE WORK STATEMENT

FOR

SPECIAL OPERATIONS ASSAULT ZONE

CANNON AFB/MELROSE AFR NM

REVIEWED BY:

// SIGNED //

MICHAEL L. JANSSEN

Functional Director/Supervisor

KENNETH D. WILLIAMSON

Quality Assurance Program Coordinator

APPROVED BY:

DEMETRI L. HARPER

Contracting Officer 26 March 2016

SECTION I DESCRIPTION OF SERVICES

1.1.

Scope

1.2.

General Task Description

1.2.1. Landing Zones (LZ) Operations

1.2.2. Drop Zones (DZ) Operations

1.2.3. Surveying

1.2.4. Scheduler/Scheduling

1.2.5. Unscheduled Mission Activity

1.3.

Program Management and Specific Requirements

1.4.

Information Management

1.4.1. Manpower Plan

1.4.2. Phase-Out Plan

1.5.

Deliverable/Format

SECTION II SERVICES SUMMARY (SS)

2.1.

Quality Assurance

2.1.1. Contractor Quality Control Plan (QCP)

2.2.

Performance Assessment

2.2.3. Customer Complaints

2.2.4. Quarterly Progress Meetings

SECTION III GOVERNMENT-FURNISHED PROPERTY (GFP)

3.1.

Government Furnished Facilities (GFF)

3.1.2. Facilities

3.2.

Utilities 3.3.

Workspace 3.4.

General Housekeeping Duties 3.5.

Equipment 3.6.

Contractor Acquired Property 3.7.

Applicable Publications and Forms

SECTION IV GENERAL INFORMATION

4. Primary Place of Performance 4.1.

Duty Location

4.1.5.1. Trip Report

4.2.

Contractor Furnished Items and Services 4.3.

Security Government Resources

4.3.1. Key Control

4.3.2. Lock Combinations

4.3.3. Identification Badges

4.4.

Security POC’s 4.5.

Security Requirements

4.5.3. Employee Security Training

4.5.4. Reporting Requirements

4.5.5. For Official Use Only (FOUO)

4.5.6. Management and Administrative Function

4.5.7. Government Required Records

4.6.

Contractor Key Personnel

4.6.4. Physical Security

4.6.5. Traffic Laws

4.6.6. Weapons, Firearms, and Ammunition

4.7.

Safety Operations

4.7.4. Malfunction/Accident/Incident Response

5.

Continuation of Essential DoD Contractor Services During Crisis

6.

Green Procurement Program (GPP)

7.

Contractor Manpower Reporting Requirements SECTION V Appendix

APPENDIX – 1 Applicable Guidance Publications and Forms APPENDIX – 2 Contract Plan and Report Products APPENDIX – 3 Government Furnished Property

SECTION I - DESCRIPTION OF SERVICES

1.1. SCOPE: The contractor shall provide all management, tools, supplies, equipment , certified personnel and labor necessary to support Landing Zone (LZ), Drop Zone (DZ), and Helicopter Landing Zone (HLZ) operations and surveying at Cannon AFB (CAFB), Melrose Air Force Range (MAFR), and other deployment locations as determined by the government. The contractor shall comply with all federal, state, and local laws and regulations. NOTE: in this document, “local includes CAFB”.

1.2. General Task Description. The contractor shall provide Special Operations Assault Zone personnel to schedule, coordinate and control assault zones which consist of LZs, DZs, and HLZs. Contractor Controllers shall show proof of required experience as Combat Controllers via DD Form 214, Certificate of Release or Discharge From Active Duty or equivalent (i.e., proof of graduating courses, resume showing experience; documents showing proof of experience, training/work documents from a Sister Service, etc.), with proposal to operate as Landing Zone Controllers (LZCs) and Drop Zone Controllers (DZCs). Contractor must provide sufficient manning to support up to three (3) concurrent geographically separated mission sets (max two (2) LZs and One (1) DZ). Mission sets are defined as operations in one (1) location (i.e. MAFR, Cannon AFB, etc.) where the LZCs are able to provide control of the aircraft for one duty period of no more than ten (10) hours. Contractors could expect to support multiple mission sets per day (NTE 10 hours per day) and transit between various HLZs, LZs and DZs will be normal. The Melrose Air Force Range (MAFR) has sixteen (16) drop zones and three (3) landing zone.

1.2.1. LZ Operations: The contractor shall provide qualified LZCs per mission set, with sufficient tools, and supplies to provide Air Traffic Control (ATC) for LZ, DZ, HLZ, and Surveying operations in an airfield environment similar to forward operating locations provide DD Form 214 or equivalent with proposal. LZC operations may occur simultaneously at multiple locations. The LZCs shall meet all qualifications and currency requirements listed in AFI 13-217 Chapter 3 Section 3.10.3.2.1., Drop Zone and Landing Zone Operations, including but not limited to completing the HQ AFSOC formal lesson plan; the class schedule shall be provided to awardee at the pre-performance conference; class shall be scheduled within five (5) working days of contract start; the class shall be completed within thirty (30) calendar days of contract start; and maintain a current FAA Class II flight physical (must be current at proposal and kept current by contractor) provide DD Form 214 or equivalent with proposal. LZCs shall perform the LZSO responsibilities as required in AFI 13-217. Supported aircraft are Light Tactical Fixed Wing (LTFW), MC/C-130, C-17, CV-22 and other supported airframes.

1.2.1.1. The contractor may be tasked to provide a minimum of one LZC for safety oversight of LZ operations conducted by 27 SOW or supported personnel during continuation training. Requests from the government must be received NLT two weeks from the planned operation, and will not impact the performance of other scheduled training missions.

1.2.1.2. Contractor LZCs will operate in the LZSO capacity if off federal property and supporting LZ operations.

1.2.1.3. Airfield Marking Patterns shall be in compliance with AFI 13-217 Chapter 3 and as planned and coordinated by mission specific requirements. If electronic navigational aids (NAVAIDS) are used, the contractor shall ensure the proper frequency is entered and set and the NAVAID is in the correct position and alignment.

1.2.2. DZ Operations: The contractor shall provide a minimum of one DZC per mission to support 27 SOW or supported units conducting airdrop operations. The DZCs shall meet all qualifications and currency requirements listed by AFI 13-217 Chapter 2 Section 2.17.3.1 including but not limited to completing the HQ AFSOC DZC formal lesson plan (class schedule will be provided to awardee at pre-performance Conference) provide DD Form 214 or equivalent with proposal. DZCs will perform all DZC responsibilities identified in AFI 13-217 Chapter 2 Section 2.18 and will assume the DZSO duties for unilateral USAF operations as identified in AFI 13-217 Chapter 2 Section 2.19. The approval authority for contracted personnel to combine DZC/DZSO duties for operations other than unilateral USAF (i.e. Sister Service, multilateral, etc.) is the 27 SOSS/CC. Supported aircraft are LTFW, MC/C-130, C-17, CV-22 and other supported airframes.

1.2.2.1. Airdrops will include, but are not limited to, heavy equipment, container delivery systems, high speed container delivery systems, military free fall and static line personnel.

1.2.2.2. The contractor may be tasked to provide a DZC for safety oversight of DZ operations conducted by 27 SOW or supported personnel during continuation training. Requests must be received NLT two weeks from the planned operation, and will not impact the performance of other scheduled training missions.

1.2.2.3. The DZCs shall possess and provide proof (via DD Form 214 or equivalent with proposal) of previous experience with marking and radio communication procedures required by AFI 13-217, providing DZ scoring for all airdrops IAW AFI 13-217 Chapter 2 Section 2.20, procedures for Ground Marked Release Systems (GMRS) as identified in Section 2.15 and Verbally Initiated Release Systems (VIRS) as identified in Section 2.16. .

1.2.3. LZ, DZ and HLZ Surveying: Contractor personnel performing surveys shall meet the qualifications and requirements identified in AFI 13-217 Chapters 2 and 3. Proof of graduating from the Survey and Assault Zone Assessment (SAAZA) course (Course # L3AZP1C251 0C1A) is considered acceptable via DD Form 214 or equivalent with proposal.

1.2.3.1. The contractor shall conduct LZ, DZ, and HLZ surveys in accordance with AFI 13-217 Chapters 2 and 3, applicable Engineering Technical Letters (ETLs) see Section V: Appendix 1, Technical Orders, and current AMC and 720th Special Tactics Group techniques, tactics and procedures (TTPs). All completed surveys will be forwarded to the Contracting Officer Representative (COR) within one duty day.

1.2.3.2. LZ, DZ, and HLZ surveys shall be conducted when tasked, via e-mail or verbally, by either the COR or 27 SOSS Leadership to include CC, DO, ADO or OSC Flt/CC. Contractor shall coordinate with the 27 SOG Survey Manager to ensure surveys are current.

1.2.4. Scheduler/Scheduling: The contractor shall provide personnel and supervision necessary to coordinate and schedule currency training and mission support for the 27 SOSS/SOAZ designee(s). Scheduling will be accomplished with two (2) separate scheduling systems: one for MAFR/CAFB airspace and one for flying operations outside of MAFR/CAFB airspace. (Note: this position is not a formal wing scheduler and is considered part time.)

1.2.4.1. The contractor shall plan, coordinate, and schedule local airspace and range use for pre-deployment and continuation training involving 27 SOW, DoD, and Foreign assets IAW AFIs, local plans, emergency and safety procedures. Prepare for and attend weekly range and scheduling briefings. Additionally, contractor shall meet with group/squadron commanders or designated representatives daily, as required.

1.2.5. Unscheduled Mission Activity: The contractor shall support unscheduled mission events when required. The contractor shall record user information for utilization tracking. Currently, on average there is one (1) unscheduled event per week, but could change as training expands.

1.3. Program Management and Specific Requirements. 27 SOW flying missions are normally conducted within 100 miles of CAFB. The contractor shall be required to follow a flexible schedule, as training mission locations may vary by scenario. The contractor shall be required to perform SOAZ missions at other locations, possibly simultaneous locations, as the flying schedule dictates.

1.3.1. The contractor shall be ready to provide SOAZ support services thirty (30) minutes prior to any mission start time as determined by the wing flying schedule and/or Center Scheduling Enterprise. The contractor shall provide SOAZ services as designated by the training scenario until mission completion for the mission.

1.3.2. The contractor shall use Air Traffic Control (ATC) terminology, marking and procedural guidance specific to LZ, DZ, and HLZ operations as specified in FAAJO7110.65, Air Traffic Control, and AFI 13-217 Chapters 2 and 3. The contractor shall comply with regulatory guidance as required by the 18th Flight Test Squadron, 720th Special Tactics Group (STG); update notifications will be provided by the COR, to meet mission requirements.

1.3.3. The contractor shall follow procedures as outlined in the MAFR operating directives. If missions are conducted outside of the MAFR/CAFB area of responsibility, the contractor shall follow procedures and guidance in accordance with that specific area of operation. Obtaining that information will be the responsibility of the contractor. Fourteen (14) days advance notification will be provided for missions outside MAFR/CAFB to the maximum extent possible.

1.3.4. The contractor shall be required to fly on military aircraft or travel to any location as specified by the training mission in accordance with this PWS.

1.3.5. The contractor shall provide SOAZ support in austere locations, inclement weather and under high stress conditions for extended periods. The contractor shall maintain required certifications to operate specialized equipment, to include but not limited to: laser pointers, night vision devices (NVDs), GPS, overt/covert lighting and marking devices, and use of UHF/VHF/FM/HF/SATCOM radios in secure communication security (COMSEC) mode. The contractor shall maintain flight line driving certification for special and general purpose vehicles. The contractor shall handle munitions and pyrotechnic devices IAW this PWS and applicable laws and regulations.

1.3.6. The contractor shall conduct limited weather observations and at a minimum provide estimated altimeter setting, temperature and surface wind velocity/direction as requested by supported aircraft. The contractor shall conduct and report weather observations IAW FAAJO7110.65, Chapter 2, Sections 6 and 7. The contractor may be required to conduct additional weather observations which include: estimating ceiling and visibility, determining obstructions to vision and reporting any observed abnormalities.

1.3.7. The contractor shall perform marshalling services for parking and movement of aircraft as the mission requires IAW AFI 11-218, Chapter 2, Aircraft Operation and Movement on the Ground. This training will be provided by the government after contract award; currency tracking and retraining scheduling is the responsibility of the contractor.

1.4. Information Management. The contractor shall provide all plans and all other appropriate reports as required in the PWS para 1.5. Deliverable/Format and in this section. The contractor shall provide a Manpower Plan (submitted as part of proposal) and Phase-Out Plan. In addition to the information required by the referenced paragraph, all reports shall be on contractor letterhead. Plans shall clearly identify the following:

Contract Number

Title of Report/Plan

Date of Report/Plan

1.4.1. Manpower Plan. The contractor shall submit a Manpower Plan with detailed manpower numbers, the associated job position and skill level for each employee to accomplish services required along with the methodology that will be utilized for recruiting, hiring, retaining and replacing employees throughout the life of the contract IAW the PWS to include paragraphs 1.2., 1.2.1., 1.2.2., 1.2.3., 1.2.4., 1.4.1., 4.6.1., and others as required. Contractor employees shall be required to maintain the minimum qualifications, experience, and education requirements of the positions to which they are assigned. It is the contractor’s responsibility to ensure sufficient personnel manning levels in daily operations to support all PWS requirements consistently.

1.4.2. Phase-Out Plan. In the event a follow-on contract is awarded to other than the incumbent, the contractor shall provide a phase-out plan for CO approval. This plan shall be provided 120 days prior to contract completion. During the phase-out period, the incumbent shall be fully responsible for operation. The Government reserves the right to conduct site visits in all contractor-operated government-owned facilities in conjunction with the solicitation of offers for the follow-on contract. The incumbent contractor shall cooperate to the extent required to permit an orderly change over to the successor contractor. With regard to the successor contractor’s access to incumbent employees, a recruitment notice may be placed at the Government’s facilities.

1.5. Deliverable. The contractor shall keep the COR, and others as designated by the CO, informed of task status and progress by regular correspondence or meetings. Provide the government the following products:

1.5.1. Status Report. As a minimum monthly status report will include total daily man-hours, total mission hours, crew rest impact, daily number of operations supported, missions not supported, and reasons for non-support and equipment usage. Contractor shall also include a detailed status report on Melrose Air Force Range and other tasked dirt Landing Zones to include type aircraft and number of landings per type aircraft. The contractor shall submit the first report no later than ten (10) calendar days after the first full month after contract award. Subsequent submittals shall be monthly no later than ten (10) calendar days after the end of each month.

1.5.2. Mishap Report. Provide a complete mishap report to the Contracting Officer and 27th Special Operations Support Squadron immediately following a mishap, incident or Off DZ occurrence, per Paragraph 4.7.1.2. of this PWS. Provide follow-up information, as required.

1.5.3. AF Form 4304, Drop Zone Landing Zone Control Log. Complete AF Form 4304 for every mission set and each individual zone and file in contractor’s work area. Completed forms will be readily available for inspection by the COR at any time. Copies of control logs will be provided by the contractor to the CO or COR upon request.

SECTION II SERVICE SUMMARY

2. The contractor service delivery requirements are summarized into performance objectives that relate directly to standards of performance required to meet mission essential needs. For the Performance Objective to be met, service delivery must be in substantial compliance with applicable performance thresholds. The Performance Threshold describes the minimum overall levels of service delivery required for acceptable quality control. Failure to meet these Performance Thresholds means that contractor Quality Control is unacceptable. A critical defect includes the loss of life, limb, and eyesight or equipment damage. The following is a list of the key performance objectives that will be verified as contractually compliant by government personnel; however, inspection of any contract requirement is authorized.

SERVICE SUMMARY

SS

Item

Performance Objective
PWS Paragraph
Performance Threshold
1
Incident Response and Reporting
Para 1.5.2., 4.7.4. through 4.7.4.6.
Report for all malfunctions. Shall not exceed 24 hours.
2
Program management; Effective quality, security, environmental plan execution.
Para 1.3. through 1.3.7., Para 4.3. through 4.5.7., Para 4.6.4., 4.7.1.3., 4.7.2., 4.7.2.1.
No more than two (2) critical defects in a contract year (12 month) period.
3
LZ/DZ Operations
Para 1.2. through 1.2.2.3.
Zero (0) critical defects in a contract year (12 month) period.
4
DZ (Drop Zone), LZ (Landing Zone), HLZ (Helicopter Landing Zone), surveying
Para 1.2.3. through 1.2.3.2.
No more than four (4) discrepancies in a contract year (12 month) period.
5
Perform proper handling and employing of munitions.
Para 1.3.5., 4.6.3.5., 4.7.3.
Zero (0) critical defects in a contract year (12 month) period.
6
Safety and Health (S&H) Plan Compliance with occupational, safety, and health (OSHA) requirements
Para 4.7. through 4.7.1.1., Para 4.7.1.2. and 4.7.1.3.
No more than one (1) critical defects in a contract year (12 month) period.
7
Contract Files
Personnel Records and Contract documentation, Para’s: 1.2.5., 1.3.5., 1.3.7., 1.5. – 1.5.3., 3.5., 4.5.6., 4.5.7., 4.6.2., 4.6.2.2., 4.6.3.5., 4.6.3.7.
No more than four (4) discrepancies in a contract year (12 month) period.
8
Program management: Effective management of personnel, qualifications, and scheduling missions
Para 1.2.4. through 1.2.5., 1.3.
No more than four (4) discrepancies in a contract year (12 month) period.

2.1. Quality Assurance: The government will inspect and evaluate the contractor’s performance to ensure services are received IAW requirements set forth in this contract. The COR will use the contractor’s work schedule or modified version thereof, to record validation results. Results of the validation then become the official Air Force record of the contractor’s performance. When a performance threshold has not been met or contractor performance has not been accomplished, the COR will initiate and provide the CO a Contract Discrepancy Report (CDR) for issuance to the contractor. The contractor shall respond to the CDR IAW instructions provided and return it to the CO within 10 calendar days of receipt.

2.1.1. Contractor Quality Control Plan (QCP): The contractor’s QCP shall be submitted to CO within ten (10) days of contract award and contain, as a minimum the following:

2.1.1.1. Contractor shall keep the records of inspections and make them available to the government throughout the contract performance period after which they will be turned over to the COR.

2.1.1.2. A description of the inspection system to cover all services. Description shall include specifics as to the areas to be inspected on a scheduled and unscheduled basis, frequency of inspections, and the title and organizational placement of the inspector(s).

2.2. Performance Assessment: This method requires the COR to employ a random style of evaluation. Periodic validations will be conducted on a scheduled basis (daily, weekly, monthly, quarterly, semi-annual or annually) and may be adjusted, based on quality trends.

2.2.1. Any unsatisfactory inspection (defect) result shall be recorded, and the CO/COR will determine if a repeat inspection is required and the time limit for correction after notification.

2.2.2. Failing to stay within the performance thresholds identified in the Service Summary table for any performance objectives in any listed time period will result in a Corrective Action Report (CAR) from the CO.

2.2.3. Customer Complaints: The COR will receive and investigate complaints. The COR will be responsible for initially validating customer complaints. The CO will make final determination of the validity of customer complaint(s) in cases of disagreement with the COR and the contractor. Validated customer complaints shall be evaluated by the COR within ten (10) business days.

2.2.4. Quarterly Progress Meetings: The CO, Functional Commander/Supervisor, COR, other government personnel as appropriate, and the contractor shall meet quarterly to discuss the contractor’s performance. The following issues shall be discussed; opportunities to improve the contract, any modifications required of the contract, unsatisfactory inspections, valid complaints against each performance objective observed, and steps taken by the contractor to prevent repeat complaints. The contractor shall provide a summation of unsatisfactory inspections and customer complaints and provide insight into any identified trends. The minutes of these meetings will be reduced to writing, signed by the CO and any other signatures as deemed appropriate, distributed to the functional area and the contractor. Should the contractor not concur with the minutes, the contractor shall provide a written notification to the Contracting Office identifying areas of non-concurrence for resolution.

SECTION III GOVERNMENT FURNISHED PROPERTY (GFP)

3. General: The government will provide the contractor with materials, equipment, and other property deemed necessary by the government to accomplish the requirements outlined in the contract. The listing of GFP is located on Attachment Two. The CO is the final authority on all GFP determined to be necessary in support of this contract.

3.1. Government Furnished Facilities (GFF).

3.1.1. The contractor shall get registered with the Wide Area Workflow e-Business website (wawf.eb.mil) to access the IUID Registry which is required for Government Furnished Facilities and Equipment. The contractor shall select the appropriate links for Setup, Getting Started and Web Based Training to become familiar with the IUID Registry system. This training shall be accomplished within five (5) working days of contract award. An inventory of all government furnished facilities and equipment shall be accomplished with the COR within six (6) working days of contract award and an inventory shall be accomplished with the COR within five (5) working days before the end of each period of performance thereafter with updates add to the IUID Registry immediately. Once initial inventory has been accomplished, the contractor shall add the validated inventory list into the iRAP IUID Registry under this contract for tracking purposes within ten (10) working days of contract award.

3.1.2. Facilities: The Government will furnish or make available to the Contractor approximately 400 square feet in Building 300, Room 148 on Cannon AFB, NM. The Contractor shall return the facility to the Government in the same condition as received, with the exception of normal fair wear and tear (and any approved alterations).

3.1.2.1. The Contractor shall not make alterations to the facility without written approval from the contracting officer. The Contractor shall submit detailed documentation of the alterations requested. Alterations to Government furnished facilities shall be made at the Contractor’s expense, except for alterations made as a result of compliance with the Occupational Safety and Health Act (OSHA).

3.2. Utilities: Government furnished utilities include water, electricity, sewage, and heating, ventilation, and cooling for the facility for the accomplishment of the services required by this PWS.

3.2.1. The contractor shall be responsible for operating under conditions which prevent the waste of utilities when this service is being provided.

3.3. Workspace: The government will provide a work area to store equipment, conduct briefings, coordinate missions, and post schedules to support this contract.

3.3.1. The government will provide desks, chairs, cabinets for storage, telephones for official use only, and scheduling boards to display all current mission information. The contractor shall maintain the workspace in a clean and orderly fashion.

3.4. General Housekeeping Duties: The Contractor shall be required to perform general housekeeping duties in and around their office to maintain a clean and presentable appearance. The contractor shall perform all custodial services as required to the office.

3.5. Equipment: The government will provide specific equipment, listed on Attachment Two, necessary to support each specific tactical training mission or scenario. The contractor shall maintain a control log available for viewing by the government at any time, and have a system of internal controls to manage GFP in its possession.

3.5.1. The government will provide personal protective equipment (PPE) to the contractor. The contractor shall be responsible for wearing PPE as required by the mission or training scenario. The contractor shall maintain all issued PPE and ensure it remains in good working condition. Any damage that surpasses normal wear and tear or loss shall be at the expense of the contractor.

3.5.2. The government will provide radios to meet mission requirements. The contractor shall be responsible for the care and security of all government provided radios. The contractor shall maintain issued radios and equipment in good working condition. The government is responsible for preventative maintenance and repair of radios that occurs from normal usage. Any damage that surpasses normal wear and tear or loss shall be at the expense of the contractor.

3.6. Contractor Acquired Property. If a deliverable item is to be retained by the contractor for use after inspection and acceptance by the government, it shall be made accountable to the contract through a contract modification adding the item as GFP to the listing through iRAP updating the IUID.

3.7. Applicable Publications and Forms. Guidance publications and forms that apply to this PWS are listed at Appendix One. The government shall provide or allow access via the Internet to all publications and forms listed in this PWS, at the start of the contract and thereafter the contractor shall be responsible for obtaining updates. Supplements or amendments to listed publications from any organizational level may be issued during the life of the contract. The contractor shall immediately implement changes that result in a decrease or no change in the contract price and notify the Contracting Officer in writing of such change. Should a decrease in contract price result, the contractor shall provide the Contracting Officer a proposal for a reduction in the contract price. Before implementing any change that will result in an increase in contract price, the contractor shall submit to the Contracting Officer a price proposal within thirty (30) calendar days following receipt of the change by the contractor. The Contracting Officer and the contractor shall negotiate the change into the contract under the provisions of the contract clause entitled “Changes.” Failure of the contractor to submit a price proposal within thirty (30) calendar days following receipt of the change entitles the government to performance according to such change at no increase in contract price, unless the time requirement is waived by the Contracting Officer in accordance with the Changes clause.

SECTION IV GENERAL INFORMATION

4. Primary Place of Performance. CAFB/MAFR.

4.1. Duty Location. In addition to the primary place of performance, the contractor shall perform duties at local and off-station training areas/ranges. Training locations outside of the primary assigned duty location will be designated by the COR with fourteen days advance notice.

4.1.1. Hours of Operation: The standard hours of operations will be in accordance with the designated times as coordinated and scheduled. Hours and days of operation shall coincide with the local flying schedule. The contractor may be requested to support missions outside of normal business hours. The contractor will receive at least a two (2) week notice if required to work weekend hours. The contractor shall effectively manage the personnel assignments in such a manner as to maximize qualified coverage of the dynamic training support mission without denying scheduled services. The Government will notify the contractor of any changes to the schedule as soon as possible. The hours of operation will coincide with the mission. Contractor employees shall not exceed 40 hours each week. In the event the contractor needs additional hours for their employees to support the mission, due to changes to the mission schedule beyond a 40 hour work week, the contractor must obtain pre-approval from the CO.

4.1.1.2. Federal Holidays. The following federal legal holidays are observed under this contract.

New Year’s Day 1 January (or as observed by the Government) Martin Luther King’s Birthday Third Monday in January

President’s Day Third Monday in February Memorial Day Last Monday in May

Independence Day 4 July (or as observed by the Government)

Labor Day First Monday in September

Columbus Day Second Monday in October

Veteran’s Day 11 November (or as observed by the Government)

Thanksgiving Day Fourth Thursday in November

Christmas Day 25 December (or as observed by the Government)

4.1.2. Travel outside the local area may be required to support the requirements of this contract. All travel must be directed and approved in advance, submitted to the COR and approved by the CO, on a Letter of Intent (LOI) and shall not exceed the travel line item funding for this requirement. Contractor personnel are not authorized to travel on government invitational travel orders. The contractor shall provide a trip report following each trip as required.

4.1.3 Additional Operation Hours (AOH): The government may periodically require additional operation hour (AOHs) to the normal schedule required as referenced section 4.1.1 to support training requirements potentially including federal holidays. The contractor shall support such AOH requirements, as directed via an AOH request by the government COR or designated representative and pre-approval through the CO. Contractor employees shall be paid for actual additional hours of support provided. For all requests, the contractor shall receive a written explanation of the need for operations mission support, the projected equipment to be used and the number of operational hours (not man-hours) budgeted to support the mission. Hours budgeted shall include routine startup (if required) and shutdown procedures, but shall not include time for maintenance (emergency or routine). The contractor shall provide the name, labor category and number of hours requested to the COR in-turn to the CO for pre-approval prior to actually working any hours outside the normal duty hours, i.e. additional operation hours. The CO’s written pre-approval shall be submitted as supporting documentation along with the invoice. The COR will certify to the CO the actual amount of AOH used.

4.1.4. Overtime: The Team Lead or alternate shall be able to recall contractor employees for quick response during emergency situations. Short notice/emergency overtime may be approved by the Functional Director and CO. Overtime will be minimized as much as possible based on the emergency.

4.1.5. Duty day begins with the first scheduled duty. This includes show times at designated duty location/office for mission preparation. After ten (10) hours of continuous duty, contractor personnel on duty may no longer perform LZC/DZC duties. A 12-hour uninterrupted break must occur before the LZC’s/DZC’s next scheduled duty time/show time requiring performance of controller/flight following duties. Duty day shall not exceed fourteen (14) hours. Exception: When duty includes flying back from off station duty location, crew duty day can be extended to 16 hours with the CO/COR approval.

4.1.5.1. The contractor shall mitigate fatigue during heavy traffic periods as required by AFI 13-217. Deviations from this requirement will be only at the discretion and as directed by the government.

4.1.6. The contractor shall submit a LOI for CO approval to allow off-base travel to another base or site to provide LZ/DZ support. The contractor shall be paid IAW the JTR for travel and per diem rates. At no time will duty day restrictions as stated in para 4.1.4 be violated.

4.1.6.1. Trip Report: Trip reports (contractor format) shall be on contractor letterhead and submitted within five (5) calendar days of travel return and as an attachment to the monthly status report. The trip report shall include, at a minimum LOI number, name of traveler/s, the purpose of the trip, destination, dates traveled, organizations/persons contacted, and a discussion of the results of the travel, i.e. overview, recommendations/conclusions and/or summary.

4.1.7. The FPCON level may change for real world events or for exercise scenarios which may prevent contractor employees from entering or leaving the base until the situation has lessened. Depending on the situation, contractor employees shall react to FPCON requirements and participate based on 27 SOW guidance provided through the CO or COR.

4.2. Contractor-Furnished Items and Services.

4.2.1. Except for the items or services specifically stated in Section 3, Government-Furnished Property and Services, the contractor shall furnish everything needed to perform this contract in accordance with all its terms and conditions. The contractor shall provide administrative supplies required for the support of the contract to include, but not limited to, paper and ink for the government-provided printer.

4.3. Security Government Resources: Contractor personnel shall have a minimum of a secret security clearance to perform services under this contract. Contractor personnel that only perform duties as a scheduler do not require a SECRET security clearance. The government will provide contractor personnel anti-terrorism and Essential Elements of Friendly Information (EEFI) briefings to cover all security issues as determined by the Air Force.

4.3.1. Key control: The contractor shall be responsible for safeguarding all GFP identified under this contract at all times.

4.3.1.1. The contractor shall not duplicate any keys issued by the government and prohibit the use of government-issued keys by any persons other than contractor’s employees. The contractor shall also prohibit contractor employees from opening locked areas to permit entrance of persons other than contractor employees engaged in performance of contract work in those areas.

4.3.1.2. The contractor shall immediately report to the COR any occurrences of lost or duplicated keys. In the event keys, other than master keys, are lost or duplicated, the contractor may be required, upon written direction of the CO, to re-key or replace the affected lock or locks without cost to the government. The government may, however, at its option, replace the affected lock or locks or perform re-keying and deduct the cost of such from the monthly payment due the contractor. In the event a master key is lost or duplicated, the government shall replace all locks and keys for that system and the total cost deducted from the monthly payment due the contractor.

4.3.2. Lock Combinations. The contractor shall control access to all government-provided lock combinations to preclude unauthorized entry.

4.3.2.1. The Contractor and employees shall comply with all security requirements of AFI 31-101, Chapter 22, Integrated Defense (FOUO), at all times while on the installation. Contractor personnel shall not enter restricted or controlled areas and/or base facilities unless specifically authorized in performance of their duties. Contractor personnel involved in civil crimes and/or other incidents of misconduct may be refused entry to the installation.

4.3.2.2. The Contractor is responsible for ensuring the Visitor/Vehicle Pass or Common Access Card is returned within three days of employee termination or contract completion. The Contractor shall return the Visitor/Vehicle Pass or Common Access Card to the Security Police Squadron or Pass and ID. The Contractor is responsible to ensure the above items are returned for Contractor employees as well as those of any subcontractors. The loss of any of the items listed above shall be reported to the appropriate agency immediately.

4.3.2.3. The Contractor shall be required to provide a Contractor Pass letter to the Contract Administrator (CA) identifying contractor employees requiring a Common Access Card/Base Pass (Template will be provided). Once signed by the CA, the employee will work with the Contracting Officer’s Representative (COR) and the unit Trusted Agent to get the required CAC from the Military Personnel Flight.

4.3.3. Identification Badges. The contractor shall furnish corporate identification badges to all contractor and subcontractor personnel authorized to work at all Government Installations. Costs for providing the corporate identification badge is the sole responsibility of the contractor. While in Government facilities, all contractor personnel shall conspicuously display their corporate identification badge at all times to allow for easy identification as a contractor employee or authorized subcontractor performing work for the contractor. Subcontractor employees’ identification badges shall identify their respective prime contractor.

4.3.3.1. Contractor personnel and their subcontractors must identify themselves as contractors or subcontractors during all meetings, telephone conversations, in electronic messages, or correspondence related to this contract.

4.4. Security POCs. The contractor shall appoint in writing a primary security manager and an alternate. The contractor shall establish and maintain a security program for protection of facilities, equipment, and classified information, (following local procedures for access locations) and provide it to the government within 10 days of receiving local procedures. The security program shall conform to the provisions of DOD 5220.22-M, National Industrial Security Program Operating Manual, and DD Form 254, Contract Security Classification Specification.

4.4.1. Security Training: The contractor shall comply with Operations Security (OPSEC), COMSEC, COMPUSEC, Emission Security (EMSEC) and base requirements. The government will provide initial COMSEC, OPSEC, COMPUSEC and EMSEC training for two (2) contractor personnel. Training for additional contractor employees, including recurring training, shall be the responsibility of the contractor.

4.5. Security Requirements. The contractor shall obtain the following pass and identification items:

4.5.1. The contractor shall provide an Entry Authorization Letter request with the name of contractor personnel and their social security number requiring access to restricted areas to each restricted area security manager for approval within 5 working days of the contract start date.

4.5.2. CONTRACTOR/EMPLOYEE BASE PASS AND IDENTIFICATION, SPECIAL CLEARANCES AND VEHICLE PASSES. The Contractor shall comply with all requirements and procedures In Accordance With (IAW) AFFARS Clause 5352.242-9000, Contractor Access to Air Force Installations. All documentation shall be submitted at the pre-performance conference.

4.5.3. Employee Security Training. The Government will provide all necessary security training for contractor personnel. The Government will also give all necessary briefings and tests pertaining to Cannon AFB regulations. The Contractor shall maintain records of each individual’s training and certifications.

4.5.3.1. The Contractor shall ensure that all contractor personnel receive initial and recurring security education training from the sponsoring agencies security manager.

4.5.4. Reporting Requirements. Contractor personnel shall report to the CO or COR any information or circumstances of which they are aware may pose a threat to the security of DoD personnel, contractor personnel, resources, and classified or unclassified defense information. Contractor personnel shall be briefed by their immediate supervisor upon initial on-base/range assignment.

4.5.5. For Official Use Only (FOUO). The contractor shall comply with DoD 5400-7-R, Chapter 4, DoD Freedom of Information Act (FOIA) Program, requirements. This regulation sets policy and procedures for the disclosure of records to the public and for marking, handling, transmitting, and safeguarding FOUO material.

4.5.6. Management and Administrative Function. The contractor shall establish and maintain a management and administrative function with responsibilities for scheduling, maintaining historical files and submitting reports.

4.5.7. Government-Required Records. The contractor shall be responsible for creating, maintaining, and disposing of the government-required records that are specifically cited in this contract. If requested by the government, the contractor shall provide the original record, or a reproducible copy of any such record, within five (5) working days of receipt of the request.

4.6. Contractor Key Personnel

4.6.1. Team Lead (TL). The TL or alternate(s) shall have full authority to act for the contractor on all contract matters relating to the daily execution of this contract. The name of the TL and alternate(s) shall be designated in writing to the CO at the pre-performance conference and within five (5) working days of any changes thereafter.

4.6.2. The contractor shall provide to the CO the telephone/cell phone numbers and email address of the TL and alternate(s) at the pre-performance conference. The TL and/or alternate shall be available 0800-1600 Monday-Friday either in the government furnished office in building 300 or via phone should they be away from the office, out in the field. The contractor shall maintain a current list of designees throughout the life of the contract. As personnel changes occur, the contractor shall ensure new personnel meet or exceed the qualification requirements as specified in this PWS.

4.6.2.2. The TL shall maintain readily available: qualifications, certificates of training, travel records, and current equipment inventories of all employees performing under this contract, for the life of the contract, for COR review. After the contract has ended, the government reserves the right to retain these records.

4.6.3. All contractor personnel shall be able to read, write, speak, and understand English and possess a valid civilian driver’s license. Contractor employees shall present a neat appearance and be easily recognized as contractor employees.

4.6.3.1. Contractor personnel shall have a working knowledge of the organizational structure of military, federal, state, and local agencies as applicable to all operations within this PWS.

4.6.3.2. Contractor personnel shall maintain the physical capabilities to perform the duties listed in this PWS and be able to safely lift and carry at least fifty (50) pounds.

4.6.3.3. All contractor personnel shall be required to transport and use munitions such as smoke grenades. Contractor personnel designated to handle munitions must obtain and maintain a valid AF Form 483, Certificate of Competence, provided by the 27 SOW Safety Office, to be scheduled after award, for explosive handling and transportation on military installations only. Contractor personnel are required to operate IAW all regulations when handling munitions and explosives. Contractor will ensure training and paperwork is current for all contractor personnel.

4.6.3.4. Contractor personnel shall be proficient in land navigation/map, compass and GPS skills sufficient to read and locate using latitude and longitude, Universal Transverse Mercator (UTM), Military Grid Reference System (MGRS) coordinates, boundaries, point of origin, point of impact, strike points and other locations during all missions.

4.6.3.5. Requirements of 14 CFR 91.17, Alcohol or drugs, apply to the service requirement of this PWS. The contractor shall maintain AF Form 2992, Medical Recommendations for Flying or Special Operational Duty, or equivalent documentation, for all contractor personnel. Contractor personnel shall submit to drug testing as required by the government. Drug testing of contractor personnel requested by the government will be at government expense.

4.6.3.6. Contractor personnel shall have a minimum of four (4) years of experience in Air Force Specialty Code 1C2X1, P273X0, or P272X0D in the performance of LZC/DZC duties as outlined in AFI 13-217, Chapters 2 and 3, and shall have satisfactorily completed USAF Combat Control Operator Course, with proof of graduation provided with proposal via DD Form 214 or equivalent experience in accordance with AFI 13-217 Chapter 2 and 3.

4.6.3.7. Contractor personnel shall complete all local orientation including MAFR Operations, CAFB DZC and LZC training, be certified by letter, signed by the 27 SOG/CC, and MAFR certification as a Tactical Range Safety Officer (TRSO)/Range Lead (RL) within thirty (30) calendar days after contract award.

4.6.3.8. The Contractor shall not employ any person who is an employee of the government if employing that person would create a conflict of interest. Additionally, the Contractor shall not employ any person who is an employee of the USAF, either military or civilian, unless such person seeks and receives approval according to DODD 5500.7-R, Standards of Conduct. The contractor shall not employ any person who is an employee of the USAF if such employment would be contrary to the policies in AFI 64-106, Chapter 3 Section 3.4.2.2.7, Air Force Industrial Labor Relations Activities. The contractor is cautioned that off-duty active military personnel hired under this contract may be subject to permanent change of station, change in duty hours, or deployment. Military Reservists and National Guard members may be subject to recall to active duty. The abrupt absence of these personnel could adversely affect the contractor’s ability to perform; however, their absence at any time shall not constitute an excuse for nonperformance under this contract.

4.6.3.9. The contractor shall not employ persons for work on this contract if such employee is identified to the contractor by the CO as a potential threat to the health, safety, security, general well-being, or operational mission of the installation and its population.

4.6.4. Physical Security. The contractor shall be responsible for safeguarding all government furnished property. At the end of each work period, all government facilities, equipment, and materials shall be secured and ensure that all lights and water are turned off, heat turned down, and all facility doors and windows have been secured.

4.6.5. Traffic Laws. The contractor and their employees shall comply with base and range traffic regulations. Motorcycle operator shall comply with Cannon AFB personal protective equipment regulations.

4.6.6. Weapons, Firearms, and Ammunition. Contractor personnel are prohibited from possessing weapons, firearms, or ammunition, on themselves or within their contractor-owned vehicles or privately-owned vehicle while on Cannon AFB and Melrose Range, New Mexico.

4.7. Safety Operations

4.7.1. Safety, Environmental Controls and Hazardous Materials Handling. The contractor shall be in compliance with all safety regulations as required by all applicable governmental directives. The contractor shall provide all contract employees with required safety equipment IAW Occupational Safety and Health Administration (OSHA) standards unless specified as GFP.

4.7.1.1. The contractor shall submit a Safety and Health Plan and corresponding site safety checklist to the Contracting Officer ten (10) days after contract award. The contractor shall develop, implement and maintain a safety plan that complies with the OSHA Program. The contractor shall coordinate safety and fire inspections if required, through the COR. The contractor’s plan shall include appropriate measures to ensure the contractor reacts promptly to investigate, correct and track alleged safety and health violations and/or uncontrolled hazards in contractor work areas.

4.7.1.2. Identifying and Reporting Hazards and Mishaps: The contractor shall promptly report to the CO and COR hazards and mishaps involving USAF personnel, contractor personnel, facilities, and/or equipment. The contractor shall provide requested information and/or assistance to the Wing Safety Office during the course of Air Force mishap investigations. The contractor shall immediately notify the Squadron Safety Representative, CO, and COR of any on-the job injury and/or death of a contractor employee.

4.7.1.3. Comply with OSHA and other applicable laws and regulations for the protection of employees.

4.7.2. Environmental: The contractor shall obtain approval for hazardous material handling from the CAFB Hazardous Material Management Process Team.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .