This is a Performance Work Statement for Contract FA4830 issued by the 23d Contracting Squadron at Moody Air Force Base, Georgia, for the maintenance and service of drain degreaser equipment and chemicals. The contractor must furnish all labor, supervision, equipment, tools, and materials required to perform the services at Moody AFB.

The primary scope of work includes installing and maintaining industry-standard chemical injection equipment at eight pre-designated facilities on base to prevent grease buildup from clogging drainage systems. The contractor must conduct monthly visits to each of 11 total injection stations across the base (located at the Main Child Development Center, Dining Facility, Bowling Alley/The Spot, Fire Department, Moody Field Club, Commissary, Burger King, and Golf Course) to ensure proper equipment operation and refill or replace chemical containers as needed. All chemicals must be non-hazardous enzyme treatment only and require inspection and approval by the 23d Civil Engineer Squadron's Utility Plumbing Shop (Building 919, 257-3098) and the 23d Logistics Readiness Squadron HAZMART Office (Building 934, 257-1947) before initial work begins or if chemicals are changed during contract performance. The contractor is responsible for removing and disposing of empty containers off base and must respond within 24 hours if equipment is not operational or improperly installed. All work must comply with the Georgia Plumbing Code, acceptable industry standards, and OSHA safety standards. The contractor shall work Monday through Friday, 7:00 a.m. to 5:00 p.m., excluding federal holidays and base closures. Contractor personnel must obtain base entry passes prior to accessing the facility.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contract: FA4830

23D CIVIL ENGINEER SQUADRON

PERFORMANCE WORK STATEMENT (PWS)

MAINTAINANCE AND SERVICE OF

DRAIN DEGREASER

EQUIPMENT/CHEMICALS

9 September 2025

23d Contracting Squadron Moody AFB, GA

1. DESCRIPTION OF SERVICES.

1.1. The Contractor shall furnish all labor, supervision, equipment, tools, and materials required to accomplish the services described below at Moody Air Force Base, GA.

1.2. The work shall include the following:

1.2.1. Maintain/Service drains, install degreaser equipment, and chemicals. The Contractor shall install/maintain/service industry-standard chemical injection equipment at pre-designated locations on base to prevent grease build-up from clogging facility drainage systems. Chemicals will be non-hazardous enzyme treatment only.

1.2.2. Contractor is required to provide/install equipment; perform monthly visits to each location to ensure equipment is operating properly, and to refill/replace chemical containers as needed.

1.2.3. Contractor is responsible to remove and dispose of empty containers off of Moody

AFB.

1.2.4. Contractor shall be required to respond to Moody AFB within twenty-four (24) hours in case equipment is not operational or installed in an improper manner.

1.2.4.1. Locations Requiring Chemical De-greaser Injection Station:

Building Address

Main Child Development Center Dining Facility Bowling Alley/The Spot Fire Department Moody Field Club Commissary Burger King Golf Course

Injection Station

1 EA

1 EA

2 EA

1 EA

2 EA

1 EA

2 EA

1 EA

2. GENERAL REQUIREMENTS.

2.1. All work shall be done in accordance with the Georgia Plumbing Code and acceptable industry standards.

2.2. All chemicals shall be inspected/approved for use by the 23d Civil Engineer Squadron’s (CES) Utility Plumbing Shop (Bldg 919/257-3098) and the 23d Logistics Readiness Squadron (LRS), HAZMART Office (Bldg 934/257-1947) *before initial work starts or if chemicals changed during the performance under this contract.

2.3. All OSHA safety standards must be followed during all phases of work.

1099171711C Highlight

1099171711C Highlight

1099171711C Highlight

1099171711C Highlight

1099171711C Highlight

1099171711C Highlight

1099171711C Highlight

1099171711C Highlight

3. CONTRACTOR’S WORK SCHEDULE.

3.1. The Contractor shall work between the hours of 7:00 a.m. through 5:00 p.m., Monday through Friday with the exception of holidays listed below:

3.2. Federal Holidays.

New Year’s Day 1 January Martin Luther King’s Birthday Third Monday in January

President’s Day Third Monday in February Good Friday Friday before Easter

Juneteenth National Independence Day 19 June Memorial Day Last Monday in May

Independence Day 4 July Labor Day First Monday in September

Columbus Day Second Monday in October Veterans Day 11 November

Thanksgiving Day Fourth Thursday in November Christmas Day 25 December

3.3. On workdays that have been declared “family days,” the Base may be minimally manned with many offices and facilities closed.

NOTE: Any of the above holidays falling on a Saturday will be observed on the preceding Friday.

Holidays falling on a Sunday will be observed on the following Monday.

3.4. Holiday Services. Services scheduled for a certain day of the week, but cannot be performed due to a holiday, shall be performed either the day before or the day after the holiday. If a service is scheduled on Monday and that Monday is a holiday, then the service shall be performed on the day after the holiday (Tuesday). Services scheduled for Friday and a holiday is on Friday, then the service shall be performed on the Thursday before the holiday.

3.5. Base Closures. Work scheduled, but not accomplished, because of base closure due to weather, exercises, or actual alert, will be accomplished as soon as possible after reopening the base.

4. SECURITY.

4.1. The Contractor shall obtain a base entry pass prior to entry onto the base. Base pass form(s) may be obtained from the Contracting Officer or Contracting Officers Representative. Forms must be completed, listing each individual requiring a pass, and signed by the company personnel manager and the Contracting Officer or Contracting Officers Representative prior to receiving an annual pass from the Visitors’ Center at the South Gate.

5. LOCATION OF WORK.

5.1. All work shall be accomplished on Moody AFB GA.