A5_Waste_Plan.pdf

PDF 7 KB Posted

Attached to
Airfield Surfaces and Markings Federal contract opportunity
Solicitation number
FA4830-15-B-0002
Issued by
Department of the Air Force Air Combat Command

About this file

Attachment 5 - Waste Plan

View the file

Other files for this federal contract opportunity

Other files attached to Airfield Surfaces and Markings, newest first.
File Type Posted
Response_to_Questions.pdf PDF
A1_Scope_Bid_Schedule_Map_Moody_AFB_QSEU_15-0111.pdf PDF
Amendment_0001.pdf PDF
A7_Questions_Form.pdf PDF
A3_Scope_Bid_Schedule_Map_Avon_Park_FL_ASPR_15-0112.pdf PDF
A6_SF_LLL.pdf PDF
A8_Contractor_Information.pdf PDF
A2_Wage_Determination_GA150012.pdf PDF
A3_Scope_Bid_Schedule_Map_Avon_Park_FL_ASPR_15-0112.pdf PDF
A1_Scope_Bid_Schedule_Map_Moody_AFB_QSEU_15-0111.pdf PDF
FA4830-15-B-0002 _Solicitation.pdf PDF
A4_Wage_Determination_FL20140198.pdf PDF
A7_Questions_Form.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 5 FA4830-15-B-0002 Waste Management Report I. Total Project Waste

Total cost of disposal, Quantity (tons) Landfill Site Tip fee/ton including hauling, Total cost/ton container rental, tip fees

II. Alternatives to Landfilling Type of Material Quantity Destination and Cost to Expected revenue Net Cost if Comparison

(tons) means of transportation handle and transport & tip fee earnings cost landfilled cost (+) / savings (-) Examples Cardboard Dimensional wood Beverage containers Land debris Concrete

CMU

Asphalt Metals - all types Gypsum board Paint Carpet Insulation Glass Cast stone Wood materials Electric cable PVC piping Rubber flooring Raised flooring

III. Total net cost (+) or savings (_) from all alternatives to landfilling all project waste

INSTRUCTIONS: Contractors will track and maintain records of materials utilized that contain recycled materials and data for debris that was recycled/removed from the demolition waste stream. The completed form will be submitted to the contracting officer in the contract closeout process.

REFERENCES: Contract clause 52.223-4 and 9; FAR 23 part 4; EPA CPG (EPA Website: EPA.gov); Resource Conservation Recovery Act (RCRA);