This is an as-built drawing package for a precast concrete dormitory complex (Building #2) at Tyndall Air Force Base in Florida. The document contains comprehensive structural design specifications, material requirements, and detailed construction plans for a multi-story residential facility utilizing precast and prestressed concrete components.

The project conforms to the 2018 International Building Code, 2019 Unified Facility Criteria DoD Building Code, and applicable ACI and ASCE standards. Design loads include dead loads ranging from 37-115 PSF depending on component type, live loads of 50-100 PSF for residential areas, roof loads of 20-28 PSF, and wind speeds of 165 MPH (Exposure C). Seismic design criteria establish a Seismic Design Category B with base shear of 297 KIP per wing. Materials specified include Type III cement for structural precast and Type I/II for architectural components, with minimum 28-day compressive strength of 6000 PSI for precast concrete and grout. Reinforcing steel consists of ASTM A615/A706 bars (60 KSI) and A416 prestressing strand (270 KSI). The construction includes double-tee floor members, insulated wall panels (8"-13" thick), cast-in-place concrete topping, and multiple stair units across five building levels plus roof framing. Connection requirements mandate 100% welding at shearwalls and light walls immediately after erection, with grouting of load-bearing panels completed within two days. The as-built record drawings (Revision 4, dated December 9, 2024) document 15 repair work orders and include foundation embed plans, framing plans for levels 2-5 and roof, elevation views, stair details, and architectural features across designated Areas A, B, and C of the complex.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2.) DESIGN LOADS

2.0) RISK CATEGORY : III

2.1) GRAVITY LOADS :

DEAD LOAD:

DT 50 PSF

C.I.P. TOPPING 37 PSF

8" SOLID WALLS & SLABS 100 PSF

11" INSULATED WALL PANELS 100 PSF

13" INSULATED WALL PANELS 115 PSF

STAIR UNITS 165 PSF

SUPERIMPOSED - STAIRS 5 PSF

SUPERIMPOSED - FLOOR 10 PSF

SUPERIMPOSED - ROOF 15 PSF

LIVE LOAD:

STAIRS/CORRIDORS 100 PSF

LIVING/BDROOMS 50 PSF

ROOF 20 PSF

PARTITIONS 15 PSF

RAIN LOAD:

ROOF 28 PSF

SNOW LOAD:

ROOF 0 PSF

2.2)LATERIAL LOADS

WIND:

WIND SPEED 165 MPH

EXPOSURE C

INTERNAL PRESSURE COEFFICIENT +/- 0.18

SEISMIC:

SS = 0.065 S1 = 0.048

SITE CLASS D

SDS = 0.069 SD1 = 0.077

SEISMIC DESIGN CATEGORY B

SEISMIC IMPERTANCE FACTOR 1.25

BUILDING BEARING WALL SYSTEM WITH

INTERMEDIATE PRECAST REINFORCED CONCRETE

SHEAR WALLS

SEISMIC RESPONSE COEFFICIENT 0.033

SEISMIC BASE SHEAR (EACH WING) 297 KIP

2.3) PROGRESSIVE COLLAPSE RESISTANCE

ALTERNATE PATH

ENHANCED LOCAL RESISTANCE

3.) MATERIALS

3.1) PRECAST CONCRETE:

CEMENT TYPE - III (STRUCTURAL); TYPE - I/II (ARCHITECTURAL)

MIX DESIGN TYPE - 67 NORMAL WEIGHT (W/AIR ENTRAIN) AIR CONTENT - 4 % (+/- 1.5%)

CONCRETE WEIGHT - 150 (PCF), GREY CEMENT MATRIX

MINIMUM 28 DAY COMPRESSIVE STRENGTH = 6000 (PSI)

AT RELEASE = 4000 (PSI)

CAST-IN-PLACE CONCRETE TOPPING OVER PRECAST

SPECIFIED COMPRESSIVE STRENGTH = 4000 PSI BY OTHERS

3.2) GROUT:

NON-SHRINK ( NON-METALLIC) GROUT AT HORIZONTAL JOINTS.

CONTINUOUS GROUTING AT LOADBEARING MEMBERS ONLY.

MINIMUM 28 DAY COMPRESSIVE STRENGTH = 6000(PSI)

ALL GROUT TO BE SUPPLIED BY TINDALL INSTALLED BY ERECTOR.

3.3) REINFORCING STEEL: (ASTM STANDARD) (ULT. TENSILE STRENGTH)

PRESTRESSING STRAND : A416: 270 (KSI)

REINFORCEMENT BARS :

REINF. BARS WHERE WELDED :

WELDED WIRE REINFORCEMENT :

A615 OR A706 (BLACK):

A706 (BLACK):

A1064

60 (KSI)

60 (KSI)

3.5) WELDING: All WELDING SHALL BE PERFORMED WITH THE PROPER MATERIAL SHOWN BELOW

NOTES:

A. REMOVE GALVANIZING PER APPROVED METHOD BEFORE WELDING

B. RE-APPLY ZINC COATING PER MFR. RECOMMENDATIONS B,C,D

C. PREPARE SURFACE PER MFR RECOMMENDATIONS PRIOR TO RE-

APPLICATION OF ZINC COATING

D. APPLY ZINC RICH COATING WITH MINIMUM OF 93% ZINC SOLIDS PER DRY

FILM WIEIGHT TO A MINIMUM THICKNESS OF 2 MILS PER ASTM A780.

E. FOR OTHER TYPES OF STAINLESS STEEL REFER TO ENGINEERING

DEPARTMENT FOR PROPER ELECTORDE MATERIAL

CARBON TO CARBON E7018

CARBON TO GALVANIZED A,B,C,D E7018

GALVANIZED TO GALVANIZED A,B,C,D E7018

SS TYPE (304L) E TO CARBON E309L

SS TYPE (304L) E TO SS TYPE (304L) E309L

SS TYPE (304L) E TO GALVANIZED A,B,C,D E309L

80 (KSI)

3.4) STRUCTRAL STEEL :

PLATES AND ANGLES A36 GRADE 36

HEADED STUD ANCHORS A108 GRADE 1010-1020

THREADED ROD AND ROUND STOCK A36 GRADE 36

BOLTS A307 OR F1554 GRADE 36

NUTS A563

WASHERS F436

4.) CAULKING

ALL CAULKING BY OTHERS

5.) PRECAST CONCRETE FINISHES

CONTRACT INCLUDES ONLY THOSE ARCHITECTURAL FEATURES SHOWN ON THESE DRAWINGS.

ANY ADDITIONAL FEATURES OR CHANGED FEATURES MAY RESULT IN CONTRACT CHANGES.

DOUBLE-TEES- STD FINISH & RAKE WALLS- STD FINISH & TROWEL

SLABS - STD FINISH & TROWEL

6.) INSERTS AND HARDWARE

TINDALL INCLUDES ALL CONNECTING LOOSE HARDWARE, BEARING MATERIAL AND WELDING AS REQUIRED TO CONNECT THE PRECAST PRODUCTS. UNLESS NOTED OTHERWISE AS "BY OTHERS". TINDALL WILL PROVIDE ANCHOR BOLTS FOR COLUMNS AND DOWELS FOR LIGHT COLUMN WALLS AND SHEARWALLS.

7.) TOLERANCES

EACH PRODUCT WILL BE MANUFACTURED IN ACCORDANCE WITH SECTION 5 OF PCI MNL -116, "MANUAL

FOR QUALITY CONTROL FOR PLANTS AND PRODUCTION OF PRECAST PRESTRESSED CONCRETE

PRODUCTS", LATEST EDITION.

8.) JOINTS

ANY CAULKING OF JOINTS, INTERIOR AND EXTERIOR, BETWEEN TWO ADJACENT PRECAST

MEMBERS WILL BE FURNISHED AND INSTALLED "BY OTHERS". ALL JOINTS BETWEEN

PRECAST MEMBERS AND CAST-IN-PLACE CONCRETE OR STEEL ARE NOMINAL DIMENSIONS

WILL VARY BECAUSE OF CONSTRUCTION AND FABRICATION TOLERANCES.

9.) ACCESS

REFER TO THE SUBCONTRACT FOR THE DIVISION OF RESPONSIBILITES AS RELATED TO SITE ACCESS.

11.) CAMBER

PRESTRESSED CONCRETE MEMBERS HAVE AN INHERENT CAMBER WHICH ARCHITECTURAL DETAILS SHOULD TAKE INTO CONSIDERATION. TOPPING THICKNESS MAY VARY WITH CAMBER. LONG TERM DEFLECTIONS PRECLUDE THE USE OF CAMBER FOR DRAINAGE, THEREFORE, POSITIVE DRAINAGE BY SLOPING MEMBERS IS

RECOMMENDED. REFER TO DESIGN CALCULATIONS FOR ANTICIPATED CAMBER OF MEMBERS.

12.) APPROVAL DRAWINGS

SHOP DRAWINGS, REVIEWED AND STAMPED APPROVED OR APPROVED AS NOTED BY THE ARCHITECT AND/OR STRUCTURAL ENGINEER, NOT REJECTED AND TRANSMITTED BY THE GENERAL CONTRACTOR TO TINDALL, SHALL CONSTITUTE AN APPROVAL OF SHOP DWG. AND MIX DESIGN PRIOR TO PRODUCTION OF PRECAST MEMBERS INVOLVED. TINDALL SHALL NOT BE HELD LIABLE FOR ANY DELAYS IN SHIPMENT THAT OCCUR AS A RESULT OF DELAYED RECEIPT OF APPROVAL DRAWINGS. TINDALL DOES NOT ASSUME

RESPONSIBILITY FOR THE COORDINATION OF OUR DRAWINGS WITH OTHER TRADES INVOLVED.

PROPRIETARY DATA IS INCLUDED IN THE INFORMATION

DISCLOSED HEREIN AND IS THE SOLE PROPERTY OF TINDALL

CORPORATION, MISSISSIPPI DIVISION. THIS INFORMATION IS

SUBMITTED IN CONFIDENCE AND NEITHER THIS DOCUMENT NOR

THE INFORMATION DISCLOSED HEREIN SHALL BE REPRODUCED

OR TRANSFERRED TO OTHER DOCUMENTS OR USED OR

DISCLOSED TO OTHERS FOR MANUFACTURING OR FOR ANY

OTHER PURPOSE EXCEPT AS SPECIFICALLY AUTHORIZED IN

WRITING BY TINDALL CORPORATION, MISSISSIPPI DIVISION.

10.) EMBEDS

REFER TO THE SUBCONTRACT FOR THE DIVISION OF RESPONSIBILITES AS RELATED TO SITE CAST

EMBEDS.

1.) DESIGN CRITERIA

ALL WORK CONFORMS TO THE 2018 INTERNATIONAL BUILDING CODE (IBC 2018), 2019 UNIFIED FACILITY CRITERIA DoD BUILDING CODE (UFC 1-200-01 2019), THE USACE SDDM FOR MILITARY CONSTRUCTION (LATEST VERSION), THE APPLICABLE AMERICAN CONCRETE INSTITUTE BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE, THE APPLICABLE AMERICAN SOCIETY OF CIVIL ENGINEERS MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER STRUCTURES, AND FOLLOWS THE RECOMMENDATIONS AND GUIDELINES AS PUT FORTH IN THE PRECAST/PRESTRESSED INSTITUTE'S

DESIGN HAND BOOK

US Army Corps of Engineers

SHEET ID

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

F

IL

E N

A M

E

IS

S

U E

D A

T E

T A

S K

O R

D E

R N

O

P R

IM

E

C O

N T

R A

C T

N O

P R

O J E

C T

N U

M B

E R

A

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

D E

S C

R

IP

T

IO

N

SHEET OF

W H

N -2

-F

D E

S

IG

N P

A C

K A

G E

IS

S

U E

D F

O R

C O

N S

T R

U C

T

IO

N

H

A Z

E L T

IN

E

N A

T

IO

N A

L D

R

S U

IT

E

O N

E

O R

L A

N D

O F

L

W H

N -2

-D

-3

X L W

U S

T T

Y A

L L D

V

12/9/2024 2:06:42 PM

ST001

T Y

N D

A L L A

IR

F

O R

C E

B A

S E

P N

X L W

U

A G

M

N L B

T H

A G

M

/1

/2

P N

X L W

U

DORM COMPLEX

T y n d a ll

A ir F o rc e B a s e

F lo ri d a

G E

N E

R A

L N

O T

E S

SHEET DESCRIPTION STATUS REV. #

ST010 PRODUCT HANDLING As Built 4

ST011 SPECIAL INSPECTION SCHEDULE As Built 4

ST100 FOUNDATION EMBED PLAN AREA A As Built 4

ST101 FOUNDATION EMBED PLAN AREA B As Built 4

ST102 FOUNDATION EMBED PLAN AREA C As Built 5

ST103 ENLARGED FTG PLANS @ STAIRS As Built 5

ST104 FDN EMBED PLAN COOLING

TOWER-TRASH ENCLOSURE

As Built 4

ST110 LEVEL 2 FRAMING PLAN AREA A As Built 4

ST111 LEVEL 2 FRAMING PLAN AREA B As Built 4

ST112 LEVEL 2 FRAMING PLAN AREA C As Built 4

ST120 LEVEL 3 FRAMING PLAN AREA A As Built 5

ST121 LEVEL 3 FRAMING PLAN AREA B As Built 4

ST122 LEVEL 3 FRAMING PLAN AREA C As Built 4

ST130 LEVEL 4 FRAMING PLAN AREA A As Built 5

ST131 LEVEL 4 FRAMING PLAN AREA B As Built 4

ST132 LEVEL 4 FRAMING PLAN AREA C As Built 4

ST140 LEVEL 5 FRAMING PLAN AREA A As Built 5

ST141 LEVEL 5 FRAMING PLAN AREA B As Built 4

ST142 LEVEL 5 FRAMING PLAN BLDG. C As Built 4

ST150 ROOF FRAMING PLAN AREA A As Built 4

ST151 ROOF FRAMING PLAN AREA B As Built 4

ST152 ROOF FRAMING PLANAREA C As Built 5

ST160 STAIR #1 FRAMING PLANS As Built 5

ST161 STAIR #2 FRAMING PLANS As Built 5

ST162 STAIR #3 FRAMING PLANS As Built 5

ST163 STAIR #4 FRAMING PLANS As Built 5

ST200 WEST ELEVATION AREA A As Built 5

ST210 EAST ELEVATION AREA A As Built 5

ST220 NORTH & SOUTH ELEVATIONS AREA A As Built 5

ST230 NORTH ELEVATION AREA C As Built 6

ST240 SOUTH ELEVATION AREA C As Built 6

ST250 EAST & WEST ELEVATIONS AREA C As Built 4

ST260 EAST & SOUTH ELEVATIONS AREA B As Built 5

ST270 STAIR #1 ELEVATIONS As Built 4

ST271 STAIR #2 ELEVATIONS As Built 4

ST272 STAIR #3 ELEVATIONS As Built 5

ST273 STAIR #4 ELEVATIONS As Built 5

ST280 COOLING TOWER ELEVATIONS As Built 5

ST290 TRASH ENCLOSURE ELEVATIONS As Built 5

ST300 ARCHITECTURAL FEATURES As Built 5

ST301 ARCHITECTURAL FEATURES As Built 5

ST302 ARCHITECTURAL FEATURES As Built 5

ST350 BLOCKOUT CONFIGURATIONS AREA A As Built 4

ST351 BLOCKOUT CONFIGURATIONS AREA C As Built 4

ST400 MATERIAL SHEET As Built 5

ST401 MATERIAL SHEET As Built 5

ST402 MATERIAL SHEET As Built 5

ST403 PROJECT JOINTING DETAILS As Built 4

ST410 SECTIONS & DETAILS As Built 4

ST411 SECTIONS & DETAILS As Built 4

ST412 SECTIONS & DETAILS As Built 5

ST420 SECTIONS & DETAILS As Built 5

ST430 SECTIONS & DETAILS As Built 5

ST440 SECTIONS & DETAILS As Built 5

ST500 TYPICAL TOPPING PLAN 2 Thru 5 As Built 5

ST501 TYPICAL ROOF TOPPING PLAN As Built 5

ST502 TOPPING PLAN DETAILS As Built 5

ST610 REPAIRS As Built 1

ST611 REPAIRS As Built 1

M A

R K

D A

T E

F

O R

A P

P R

O V

A L

O N

LY

N O

T F

O R

IF

C

5-

-2

6-

-2

F O

R

IF

C A

P P

R O

V A

L 6-

-2

F

O R

IF

C

A P

P R

O V

A L

F

O R

IF

C

1-

-2

R

E V

IS

E

D F

O R

2-

-2

A S

B U

IL

T

-0

9-

AS-BUILT

DRAWINGS

SEE REPAIR

WORK

ORDER

RWO-231404

RWO-231459

RWO-231504

RWO-231537

RWO-231559

RWO-231567

RWO-231634

RWO-231838

RWO-231988

RWO-232011

RWO-232024

RWO-232055

RWO-240455

RWO-240679

RWO-241746

FOR DETAIL

AND

LOCATION

BUILDING #2

D

ES

IG

N

P

AC

KA

G

E

- R

EC

O R

D D

R

AW

IN

G

S

DESIGN PACKAGE 2 - RECORD DRAWINGS

RE

CO

RD

D

RA

W

IN

GS

60º MAX

LOAD LINE

OFF LOADING DOUBLE-TEE OR FLAT SLAB PANELS

(LIFT LOOPS)

STEM

WWFFLANGE

Z O

N E

P R

E S

T R

E S

S

1' -4

Z O

N E

N O

D R

IL

L

1' -6

DOUBLE TEE CROSS SECTION

NOTES

1. TINDALL RECOMMENDS THAT WHEN EVER

POSSIBILE, FIELD ANCHORS BE ATTACHED TO THE 4"

FLANGE OF THE PRECAST DOUBLE TEES.

2. DO NOT INSTALL FIELD ANCHORS IN THE BOTTOM

18" ON THE PRECAST DOUBLE TEE STEMS. POWDER

ACTUATED FASTENING SYSTEMS ARE STRICTLY

PROHIBITED IN THIS AREA.

3. DO NOT DRILL IN BOTTOM OF DOUBLE TEE STEM.

DISCLAMER TINDALL WILL NOT BE RESPONSIBLE FOR

ANY DAMAGE DONE TO THE DOUBLE TEES CAUSED BY

OTHER TRADES AND/OR THEIR FIELD INSTALLIONS.

OFF LOADING 8" FLAT PANELS

(6 TON BURKES TOP EDGE; 8 TON BURKES BACK FACE)

ROLLING BLOCK

BOTH DRUMS LOADED

ROLLING BLOCKS

& SPREADER BEAM

PANEL MAY BE

LOWERED TO DUNNAGE

TO REMOVE RIGGING

ROTATE IN AIR

DO NOT HEEL

DOUBLE TEES (1) CONNECTION AT EACH END OF DT 20% OF FLANGE CONNECTIONS TO ADJACENT DT NONE

PRODUCT TYPE BEFORE CRANE RELEASE: BEFORE ERECTING NEXT MEMBER: GROUTING REQUIREMENTS:

MINIMUM CONNECTION SCHEDULE:

1.) THESE GUIDELINES PROVIDED BELOW ARE MINIMUMS AND ARE NOT TO BE CONSIDERED AS A COMPLETE SUBSTITUTE FOR SAFE AND RATIONAL ERECTION PRACTICES.

2.) ANY EXCEPTION MUST BE DOCUMENTED THROUGH TINDALL ENGINEERING.

3.) FAILURE TO COMPLY WITH THESE MINIMUMS WILL RESULT IN IMMEDIATE STOPPAGE OF WORK UNTIL REQUIREMENTS ARE MET.

NOTES:

1.) 100% OF DT WELDING IS REQUIRED AT SHEARWALLS & LITEWALLS IMMEDIATELY AFTER ERECTED.

2.) TOP AND BOTTOM OF SPANDREL TO COLUMNS CONNECTIONS ARE REQUIRED BEFORE LOADING THE SPANDREL.

3.) 100% FOUNDATION CONNECTIONS ARE TO BE MADE BEFORE LOADING THE VERTICAL MEMBER.

SPANDRELS TOP CONNECTION AT EACH END TOP AND BOTTOM CONNECTION AT EACH END NONE

BEAMS N/A

VERTICAL WALL PANELS LOAD

BEARING

HORIZONTAL WALL PANELS

SHEARWALL

COLUMNS N/A

VERTICAL WALL PANELS NON-

LOAD BEARING

(1) TOP CONNECTION AT EACH END

BRACED AT TOP AND (1) CONNECTION AT BOTTOM

(1) CONNECTION AT TOP AND (1) CONNECTION AT BOTTOM

(1) CONNECTION AT TOP AND 20% OF CONNECTIONS AT THE

BOTTOM

BRACED AT TOP AND (2) CONNECTIONS AT BOTTOM

ALL ANCHOR BOLTS INSTALLED & TIGHTENED. COLUMN BRACES MUST BE

INSTALLED

ALL CONNECTIONS AT EACH END

BRACED AT TOP AND 100% OF BOTTOM CONNECTIONS

(1) CONNECTION AT TOP AND 100% OF BOTTOM CONNECTIONS

(1) CONNECTION AT TOP AND 60% OF CONNECTIONS AT THE BOTTOM

100% OF BOTTOM CONNECTIONS & 20% OF TOP CONNECTIONS

ALL ANCHOR BOLTS INSTALLED & TIGHTENED. COLUMN BRACES MUST BE

INSTALLED

NONE

FULLY GROUTED BEFORE ERECTING MORE THAN ONE

LEVEL

FULLY GROUTED WITHIN (2) DAYS OF PANEL ERECTION

FULLY GROUTED BEFORE ERECTING MORE THAN ONE

LEVEL

FULLY GROUTED BEFORE ERECTING MORE THAN ONE

LEVEL

FULLY GROUTED PER COLUMN TO FOUNDATION

DETAIL.

OFF LOADING 8" HORIZONTAL PANELS

(6 TON BURKES TOP EDGE; 8 TON BURKES BACK FACE)

LOAD LINE

ROLLING BLOCK

ROLLING BLOCK

ROTATE IN AIR

DO NOT HEEL

LO

A

D L

IN

E

LO

A

D L

IN

E

PRODUCT MAY BE

LOWERED TO DUNNAGE

TO REMOVE RIGGING

OFF LOADING 13" FIP PANELS

(10 TON BURKES TOP EDGE; 8 TON BURKES BACK FACE)

LOAD LINE

ROLLING BLOCK

ROLLING BLOCK

ROTATE IN AIR

DO NOT HEEL

LO

A

D L

IN

E

LO

A

D L

IN

E

PRODUCT MAY BE

LOWERED TO DUNNAGE

TO REMOVE RIGGING

UNLOADING & HANDLING STAIRS/SLABS

4T OR 6T ANCHORS IN THE TOP

CRANE LINE

CRANE LINE

CLEAR TRUCK

CLEAR TRUCK

ROTATE IN THE AIR

"DO NOT HEEL"

US Army Corps of Engineers

SHEET ID

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

F

IL

E N

A M

E

IS

S

U E

D A

T E

T A

S K

O R

D E

R N

O

P R

IM

E

C O

N T

R A

C T

N O

P R

O J E

C T

N U

M B

E R

A

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

D E

S C

R

IP

T

IO

N

SHEET OF

W H

N -2

-F

D E

S

IG

N P

A C

K A

G E

IS

S

U E

D F

O R

C O

N S

T R

U C

T

IO

N

H

A Z

E L T

IN

E

N A

T

IO

N A

L D

R

S U

IT

E

O

L A

N D

O F

L

W H

N -2

-D

-3

X L W

U S

T T

Y A

L L D

V

12/9/2024 2:06:46 PM

ST010

T Y

N D

A L L A

IR

F

O R

C E

B A

S E

P N

X L W

U

A G

M

N L B

T H

A G

M

/1

/2

P N

X L W

U

DORM COMPLEX

T y n d a ll

A ir F o rc e B a s e

F lo ri d a

P R

O D

U C

T H

A N

D L

IN

G

ERECTION NOTES:

Erection to be by TINDALL Corporation, Mississippi Division or TINDALL's subcontractor,refer to erection agreement.

Precast units to be delivered by TINDALL or TINDALL's subcontractor and shall be handled and erected in accordance with these drawings. Any damage due to not following these procedures to any individual component or group of components resulting in visual cracking, spalling or permanent deformation during any phase of storage, handling, or erection, including that of a partially erected structure, is the responsibility of the erector.

Prior to erection, the erector shall be responsible for verifying all dimensions, center-lines and grades that affect the precast.

The erector shall establish joint locations, control points, bench marks, offset lines and elevation marks prior to actual product installation. This will keep the differential in joint width to a minimum as well as identifying problems caused by building frame columns being out of dimension or alignment.

Before erection, the erector shall ensure that all materials supplied by TINDALL are at the job site and readily available. Including shims, pads, connecting hardware and grout. To avoid delays, any deficiencies should be reported to TINDALL immediately.

Erection tolerances shall be as stated in the PCI-design handbook.

( Latest edition )

When job site storing of precast units is required, dunnage shall be located under lifting device, or as specified otherwise on these drawings for special conditions.

Lifting procedures may require two, three, or four lifting points depending upon's panel length and weight. It shall be done as specified on these drawings.

All lifting and handling devices indicated in each product are to be used when lifting and handling any product. Lifting devices to be removed, if applicable, and patched after erection.

Erector is responsible to verify panel's elevation and plumbness, prior to and after precast unit is released from the crane hooks. All bracing, if required, is to remain in place until all final panel connections are made.

Shim stack elevations shall be established by the erector prior to installation of wall panels. Typically, there shall be two shim stacks per panel located at the same location as the panel's bottom connections, or 2x (panel width), or as otherwise indicated on these drawings.

Grouting under panels by the erector, if any, shall be according to scope as shown on TINDALL's drawings.

Columns and vertical wall panels to be shimmed to elevation, plumbed and then grouted using non-shrink, non-metalic grout as specified in these drawings.

All weld types, temporary or otherwise as specified on these drawings, shall be in accordance to ANSI/AWS D1.1 - latest edition.

All welds to be cleaned and then touched-up with rust-inhibitive paint or equal by erector. Touch up galvanized plates with ZRC paint after welding connection hardware and removing flux.

All miscellaneous steel to be ASTM A36, Welding to be with E70XX electrodes.

All caulking work shall be performed in accordance to manufacturer's standard specifications for the particular product and application.

TINDALL's scope of caulking work shall be as shown on these drawings.

To prevent damage to adjacent pavement, mats shall be placed under outriggers.

Crane movement shall be restricted to those areas designated by the contractor.

Beam to column connections shall be made prior to loading beams and then each beam shall be loaded symmetrically to prevent rotation.

Double-tee bearing shall be no less than 4" at all bearing surfaces.

Contact engineering department if bearing is less than 4".

M A

R K

D A

T E

F

O R

A P

P R

O V

A L

O N

LY

N O

T F

O R

IF

C

5-

-2

6-

-2

F O

R

IF

C A

P P

R O

V A

L

F

O R

-2

A S

B U

IL

T

-0

9-

D

ES

IG

N

P

AC

KA

G

E

- R

EC

O R

D D

R

AW

IN

G

S

DESIGN PACKAGE 2 - RECORD DRAWINGS

RE

CO

RD

D

RA

W

US Army Corps of Engineers

SHEET ID

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

F

IL

E N

A M

E

IS

S

U E

D A

T E

T A

S K

O R

D E

R N

O

P R

IM

E

C O

N T

R A

C T

N O

P R

O J E

C T

N U

M B

E R

A

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

D E

S C

R

IP

T

IO

N

SHEET OF

W H

N -2

-F

D E

S

IG

N P

A C

K A

G E

IS

S

U E

D F

O R

C O

N S

T R

U C

T

IO

N

H

A Z

E L T

IN

E

N A

T

IO

N A

L D

R

S U

IT

E

O

L A

N D

O F

L

W H

N -2

-D

-3

X L W

U S

T T

Y A

L L D

V

12/9/2024 2:06:51 PM

ST011

T Y

N D

A L L A

IR

F

O R

C E

B A

S E

P N

X L W

U

A G

M

N L B

T H

A G

M

/1

/2

P N

X L W

U

DORM COMPLEX

T y n d a ll

A ir F o rc e B a s e

F lo ri d a

S P

E C

IA

L I

N S

P E

C T

IO

N

S C

H E

D U

L E

M A

R K

D A

T E

F

O R

A P

P R

O V

A L

O N

LY

N O

T F

O R

IF

C

5-

-2

6-

-2

F O

R

IF

C A

P P

R O

V A

L

F

O R

-2

A S

B U

IL

T

-0

9-

D

ES

IG

N

P

AC

KA

G

E

- R

EC

O R

D D

R

AW

IN

G

S

DESIGN PACKAGE 2 - RECORD DRAWINGS

RE

CO

RD

D

RA

W

A

B

C

D

E

615 14 13 12 11 10 9 8

/8

/8

/2

/8

/2

/8

/8

/8

/2

/8

/8

/8

/8

/8

/8

/8

/2

/2

/8

/8

/8

/8

/8

/8

/8

/8

/8

/2

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/2

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/4

/4

/2

/2

/2

/2

/2

/8

/8

/8

/4

/8

/8

/8

/2

/4

/4

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/2

/2

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/2

/8

/4

/2

/2

/2

/2

/2

/8

/8

/8

/2

/8

/2

/2

DIRECTION OF

STUB DIMENSIONS

32' - 8 1/2" 32' - 8" 32' - 8" 32' - 8" 32' - 8" 11' - 2 7/8" 21' - 5 3/4" 9' - 1 1/2"

D

IR

E C

T

IO

N O

F

S T

U B

D

IM

E N

S

IO

N S

DIRECTION OF

STUB DIMENSIONS

D

IR

E C

T

IO

N O

F

S T

U B

D

IM

E N

S

IO

N S

ST103

A1

ST103

B1

ST410

4"

ST410

____________________________________________ 2

ST410

ST410

ST410

3"

3"

4"

0' - 0"

2' - 0 7/8"

SJX001

20' - 0 7/8"

SJX001

S P

A C

E S

0' - 0"

6' - 8 3/8"

SJX001

18' - 8 3/8"

SJX001

23' - 2 1/2"

SJX001

S P

A

0' - 0" 0' - 5 3/8"

SJX003

1' - 5 3/8"

SJX003

20' - 8 1/4"

21' - 8 1/4"

SJX003

26' - 11 1/2"

27' - 11 1/2"

SJX003

19' - 5 3/8" 20' - 5 3/8"

21' - 10 7/8"

SJX003

28' - 6 1/8"

SJX003

0' - 0"

2' - 8 1/2"

SJX001

16' - 8 1/2"

SJX001

20' - 6 3/4"

SJX001

S P

A

0' - 0"

1' - 10 1/4"

17' - 10 1/4"

S P

A

0' - 0"

18' - 1 1/4" 19' - 1 1/4"

SJX003

0' - 0" 0' - 1 1/2"

0' - 7 1/2"

4' - 8 1/2"

7' - 4 5/8"

8' - 9 1/8"

9' - 3 1/8"

SJX003

27' - 4 1/4"

27' - 10 1/4"

SJX003

ST100

ST100

ST410

" 6

/4

FIRST (3)

REQ'D SJX003

START SJX001

START 4" OFFSET

STOP 4" OFFSET

4" 7"

(6) SJX003

ST410

N

A

B C

US Army Corps of Engineers

SHEET ID

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

F

IL

E N

A M

E

IS

S

U E

D A

T E

T A

S K

O R

D E

R N

O

P R

IM

E

C O

N T

R A

C T

N O

P R

O J E

C T

N U

M B

E R

A

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

D E

S C

R

IP

T

IO

N

SHEET OF

W H

N -2

-F

D E

S

IG

N P

A C

K A

G E

IS

S

U E

D F

O R

C O

N S

T R

U C

T

IO

N

H

A Z

E L T

IN

E

N A

T

IO

N A

L D

R

S U

IT

E

O

L A

N D

O F

L

W H

N -2

-D

-3

X L W

U S

T T

Y A

L L D

V

12/9/2024 2:06:56 PM

ST100

T Y

N D

A L L A

IR

F

O R

C E

B A

S E

P N

X L W

U

A G

M

N L B

T H

A G

M

/1

/2

P N

X L W

U

DORM COMPLEX

T y n d a ll

A ir F o rc e B a s e

F lo ri d a

F O

U N

D A

T

IO

N E

M B

E D

P L A

N A

R

ST1001/8" = 1'-0"

AAFOUNDATION EMBED PLAN AREA A

ST1001 1/2" = 1'-0"

1ENLARGED PLAN

NOTES:

1. SJX001 INDICATES ON PLANS COMBINATION

OF #5 DOWEL (SJX001) AND 2"x7" SLEEVE (SJX002)

PER SECTIONS 1 & 2/ST410

2. SJX003 INDICATES ON PLANS COMBINATION

OF #8 DOWEL (SJX003) AND 3"x10" SLEEVE(SJX004)

PER SECTIONS 3,4 & 5/ST410

3. CAST-IN-PLACE FOUNDATIONS - BY OTHERS

N

M A

R K

D A

T E

F

O R

A P

P R

O V

A L

O N

LY

N O

T F

O R

IF

C

5-

-2

6-

-2

F O

R

IF

C A

P P

R O

V A

L

NOTE: ORIENTATION OF DOWELS CAN

BE MODIFIED TO AVOID INTERFERENCE

WITH OTHER OBJECTS.

TYPICAL COMMENTS APPLYING TO ALL SHEETS OF THIS SUBMITTAL

1. REFER TO ASI001 FOR MOST CURRENT STRUCTURAL FOUNDATION THICKNESS.

COORDINATE THICKENED FOOTING AS REQ'D FOR DOWEL EMBEDMENT.

F

O R

-2

A S

B U

IL

T

-0

9-

D

ES

IG

N

P

AC

KA

G

E

- R

EC

O R

D D

R

AW

IN

G

S

DESIGN PACKAGE 2 - RECORD DRAWINGS

RE

CO

RD

D

RA

W

A

A

B

B

C

C

D

D

G

G

H

H

J

J

K

K

L

L

N

N P

F

F

ST103

B2

ST103

B1

46' - 5 5/8"

8' - 9 1/8" 10' - 4" 8' - 9 7/8" 16' - 8" 1' - 10 5/8"

E X

P

J t.

/4

/4

/2

ST410

ST410

/AA ST100

C

A S

T

7' - 10 5/8"

1' - 7 3/8"

4' - 8" 8' - 5" 4' - 5 1/2" 3' - 6 1/2"

8' - 0" 3' - 6 1/2"1' - 7"

/2

/2

"8

N

A

B C

US Army Corps of Engineers

SHEET ID

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

F

IL

E N

A M

E

IS

S

U E

D A

T E

T A

S K

O R

D E

R N

O

P R

IM

E

C O

N T

R A

C T

N O

P R

O J E

C T

N U

M B

E R

A

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

D E

S C

R

IP

T

IO

N

SHEET OF

W H

N -2

-F

D E

S

IG

N P

A C

K A

G E

IS

S

U E

D F

O R

C O

N S

T R

U C

T

IO

N

H

A Z

E L T

IN

E

N A

T

IO

N A

L D

R

S U

IT

E

O

L A

N D

O F

L

W H

N -2

-D

-3

X L W

U S

T T

Y A

L L D

V

12/9/2024 2:07:48 PM

ST101

T Y

N D

A L L A

IR

F

O R

C E

B A

S E

P N

X L W

U

A G

M

N L B

T H

A G

M

/1

/2

P N

X L W

U

DORM COMPLEX

T y n d a ll

A ir F o rc e B a s e

F lo ri d a

F O

U N

D A

T

IO

N E

M B

E D

P L A

N A

R E

A B

ST1011/8" = 1'-0"

BAFOUNDATION EMBED PLAN AREA B

N

NOTES:

1. SJX001 INDICATES ON PLANS COMBINATION

OF #5 DOWEL (SJX001) AND 2"x7" SLEEVE (SJX002)

PER SECTIONS 1 & 2/ST410

2. SJX003 INDICATES ON PLANS COMBINATION

OF #8 DOWEL (SJX003) AND 3"x10" SLEEVE(SJX004)

PER SECTIONS 3,4 & 5/ST410

3. CAST-IN-PLACE FOUNDATIONS - BY OTHERS

M A

R K

D A

T E

F

O R

A P

P R

O V

A L

O N

LY

N O

T F

O R

IF

C

5-

-2

6-

-2

F O

R

IF

C A

P P

R O

V A

L

TYPICAL COMMENTS APPLYING TO ALL SHEETS OF THIS SUBMITTAL

1. REFER TO ASI001 FOR MOST CURRENT STRUCTURAL FOUNDATION THICKNESS.

COORDINATE THICKENED FOOTING AS REQ'D FOR DOWEL EMBEDMENT.

F

O R

-2

A S

B U

IL

T

-0

9-

D

ES

IG

N

P

AC

KA

G

E

- R

EC

O R

D D

R

AW

IN

G

S

DESIGN PACKAGE 2 - RECORD DRAWINGS

RE

CO

RD

D

RA

W

3 3

P Q R S T U V

9 9

ST103

C1

/8

/8

/4

/4

/4

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/2

/2

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

ST410

DIRECTION OF

STUB DIMENSIONS

0' - 3 3/8"

1' - 9 3/8"

SJX003

9' - 10 1/2"

11' - 4 1/2"

13' - 0 1/2"

14' - 6 1/2"

SJX003

19' - 6 1/2"

21' - 0 1/2"

22' - 7"22' - 7"

0' - 0"

2' - 9 3/8"

SJX001

8' - 9 3/8"

SJX001

15' - 0 1/2"

SJX001

19' - 0 1/2"

SJX001

0' - 0"

0' - 3 3/4"

SJX003

4' - 3 3/4" 5' - 2 1/4"

6' - 7 1/2"

7' - 7 1/2"

SJX003

26' - 5 1/2"

27' - 5 1/2"

SJX003

0' - 0"

8' - 5 7/8"

25' - 5 7/8"

S P

A

ST100

1O.H.

ST100

1OPP

HAND

0' - 0"

0' - 7"

SJX001

5' - 7"

SJX001

10' - 4 1/8"

SJX001

22' - 4 1/8"

SJX001

30' - 6 7/8"

SJX001

48' - 6 7/8"

SJX001

S P

A

S P

A

0' - 3 3/8"

SJX003

6' - 10 5/8"

8' - 4 1/8"

9' - 4 1/8"

SJX003

22' - 10 1/2"

23' - 10 1/2"

SJX003

29' - 1 3/4"

30' - 1 3/4"

SJX003

49' - 4 5/8"

50' - 4 5/8"

SJX003

/8

/8

/2

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/2

/2

ST410

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/4

/4

/8

/8

DIRECTION OF

STUB DIMENSIONS

D

IR

E C

T

IO

N O

F

S T

U B

D

IM

E N

S

IO

N S

D

IR

E C

T

IO

N O

F

S T

U B

D

IM

E N

S

IO

N S

START 4"

(OFFSET)

ST410

ST410

2' - 2 3/4"

2' - 2 3/4"

N

A

B C

US Army Corps of Engineers

SHEET ID

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

F

IL

E N

A M

E

IS

S

U E

D A

T E

T A

S K

O R

D E

R N

O

P R

IM

E

C O

N T

R A

C T

N O

P R

O J E

C T

N U

M B

E R

A

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

D E

S C

R

IP

T

IO

N

SHEET OF

W H

N -2

-F

D E

S

IG

N P

A C

K A

G E

IS

S

U E

D F

O R

C O

N S

T R

U C

T

IO

N

H

A Z

E L T

IN

E

N A

T

IO

N A

L D

R

S U

IT

E

O

L A

N D

O F

L

W H

N -2

-D

-3

X L W

U S

T T

Y A

L L D

V

12/9/2024 2:07:52 PM

ST102

T Y

N D

A L L A

IR

F

O R

C E

B A

S E

P N

X L W

U

A G

M

N L B

T H

A G

M

/1

/2

P N

X L W

U

DORM COMPLEX

T y n d a ll

A ir F o rc e B a s e

F lo ri d a

F O

U N

D A

T

IO

N E

M B

E D

P L A

N A

R E

A C

ST1021/8" = 1'-0"

CAFOUNDATION EMBED PLAN AREA C

N

NOTES:

1. SJX001 INDICATES ON PLANS COMBINATION

OF #5 DOWEL (SJX001) AND 2"x7" SLEEVE (SJX002)

PER SECTIONS 1 & 2/ST410

2. SJX003 INDICATES ON PLANS COMBINATION

OF #8 DOWEL (SJX003) AND 3"x10" SLEEVE(SJX004)

PER SECTIONS 3,4 & 5/ST410

3. CAST-IN-PLACE FOUNDATIONS - BY OTHERS

M A

R K

D A

T E

F

O R

A P

P R

O V

A L

O N

LY

N O

T F

O R

IF

C

5-

-2

6-

-2

F O

R

IF

C A

P P

R O

V A

L

TYPICAL COMMENTS APPLYING TO ALL SHEETS OF THIS SUBMITTAL

1. REFER TO ASI001 FOR MOST CURRENT STRUCTURAL FOUNDATION THICKNESS.

COORDINATE THICKENED FOOTING AS REQ'D FOR DOWEL EMBEDMENT.

F

O R

-2

4 4

4 4

R

E V

IS

E

D F

O R

-2

A S

B U

IL

T

-0

9-

D

ES

IG

N

P

AC

KA

G

E

- R

EC

O R

D D

R

AW

IN

G

S

DESIGN PACKAGE 2 - RECORD DRAWINGS

RE

CO

RD

D

RA

W

S J X

S J X

9' - 5"

/2

/2

S

J X

/2

S J X

/2

S J X

/4

S

J X

0' - 0"

6' - 5"

SJX001

8' - 5"

SJX001

10' - 5"

SJX001

12' - 5"

SJX001

14' - 5"

SJX001

16' - 5"

SJX001

18' - 5"

SJX001

0' - 0"

4' - 11"

SJX003

5' - 11"

SJX003

19' - 5"

20' - 5"

SJX003

/2

S J X

/2

S J X

/2

S J X

/2

S J X

S J X

6" 6"

SJX003

A

B

0' - 0"

9' - 5 1/2"

SJX001

11' - 5 1/2"

SJX001

13' - 5 1/2"

SJX001

15' - 5 1/2"

SJX001

17' - 5 1/2"

SJX001

0' - 0"

0' - 11 1/2"

SJX003

2' - 5 1/2"

3' - 7 1/2"

SJX003

8' - 6 1/2"

SJX003

18' - 5 1/2"

SJX003

19' - 11 1/2"

SJX003

S

J X

S J X

S

J X

S J X

S

J X

S

J X

S

J X

S

J X

S J X

S J X

S

J X

10 1/2"

/2

M N P

S J X

S J X

S J X

S J X

S J X

S J X

S J X

S J X

/8

S J X

0' - 0"

3' - 11 1/2"

SJX001

7' - 11 1/2"

SJX001

0' - 0"

1' - 3 1/2"

SJX003

2' - 3 1/2"

SJX003

9' - 7 1/2"

SJX003

10' - 7 1/2"

SJX003

/8

S J X

0' - 0"

1' - 1 1/2"

SJX003

10' - 9 1/2"

SJX003

1' - 2"

S J X

S J X

S J X

S J X

S J X

S J X

/2

S J X

6' - 2"

7"

7 1/4"

3' - 2 1/2" 17' - 5 1/2"

V

/8

S

J X

/8

S

J X

/8

S J X

/8

S J X

/8

S J X

/4

S J X

0' - 0"

10' - 4 5/8"

SJX001

12' - 4 5/8"

SJX001

14' - 4 5/8"

SJX001

16' - 4 5/8"

SJX001

18' - 4 5/8"

SJX001

20' - 4 5/8"

SJX001

22' - 4 5/8"

SJX001

9' - 5 1/8"

/4

/4

" 0

/8

S J X

/8

S J X

6 1/8" 8"

/8

S J X

/8

S J X

/8

S J X

/8

0' - 0"

8' - 4 1/2"

9' - 4 1/2"

SJX003

22' - 11 1/4"

23' - 11 1/4"

SJX003

(2)SJX001

(4)SJX003

(4)SJX001

(4)SJX003

N

A

B C

US Army Corps of Engineers

SHEET ID

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

F

IL

E N

A M

E

IS

S

U E

D A

T E

T A

S K

O R

D E

R N

O

P R

IM

E

C O

N T

R A

C T

N O

P R

O J E

C T

N U

M B

E R

A

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

D E

S C

R

IP

T

IO

N

SHEET OF

W H

N -2

-F

D E

S

IG

N P

A C

K A

G E

IS

S

U E

D F

O R

C O

N S

T R

U C

T

IO

N

H

A Z

E L T

IN

E

N A

T

IO

N A

L D

R

S U

IT

E

O

L A

N D

O F

L

W H

N -2

-D

-3

X L W

U S

T T

Y A

L L D

V

12/9/2024 2:07:57 PM

ST103

T Y

N D

A L L A

IR

F

O R

C E

B A

S E

P N

X L W

U

A G

M

N L B

T H

A G

M

/1

/2

P N

X L W

U

DORM COMPLEX

T y n d a ll

A ir F o rc e B a s e

F lo ri d a

E N

L A

R G

E D

F T

G P

L A

N S

S

T A

IR

S

ST1031/4" = 1'-0"

A1FOUNDATION EMBED PLAN STAIR #1

BARS ALONG GRID 15

NOT SHOWN FOR CLARITY

REFER TO ST100

FOR LOCATIONS

ST1031/4" = 1'-0"

B1FOUNDATION EMBED PLAN STAIR #2

ST1031/4" = 1'-0"

B2FOUNDATION EMBED PLAN STAIR #3

ST1031/4" = 1'-0"

C1FOUNDATION EMBED PLAN STAIR #4

DIRECTION OF

STUB DIMENSIONS

D

IR

E C

T

IO

N O

F

S T

U B

D

IM

E N

S

IO

N S

DIRECTION OF

STUB DIMENSIONS

D

IR

E C

T

IO

N O

F

S T

U B

D

IM

E N

S

IO

N S

DIRECTION OF

STUB DIMENSIONS

DIRECTION OF

STUB DIMENSIONS

BARS ALONG GRID 8

NOT SHOWN FOR CLARITY

REFER TO ST101

FOR LOCATIONS

BARS ALONG GRID V

NOT SHOWN FOR CLARITY

REFER TO ST102

FOR LOCATIONS

DIRECTION OF

STUB DIMENSIONS

D

IR

E C

T

IO

N O

F

S T

U B

D

IM

E N

S

IO

N S

DIRECTION OF

STUB DIMENSIONS

DIRECTION OF

STUB DIMENSIONS

DIRECTION OF

STUB DIMENSIONS

D

IR

E C

T

IO

N O

F

S T

U B

D

IM

E N

S

IO

N S

NN

N

N

NOTES:

1. SJX001 INDICATES ON PLANS COMBINATION

OF #5 DOWEL (SJX001) AND 2"x7" SLEEVE (SJX002)

PER SECTIONS 1 & 2/ST410

2. SJX003 INDICATES ON PLANS COMBINATION

OF #8 DOWEL (SJX003) AND 3"x10" SLEEVE(SJX004)

PER SECTIONS 3,4 & 5/ST410

3. CAST-IN-PLACE FOUNDATIONS - BY OTHERS

M A

R K

D A

T E

F

O R

A P

P R

O V

A L

O N

LY

N O

T F

O R

IF

C

5-

-2

6-

-2

F O

R

IF

C A

P P

R O

V A

L

TYPICAL COMMENTS APPLYING TO ALL SHEETS OF THIS SUBMITTAL

1. REFER TO ASI001 FOR MOST CURRENT STRUCTURAL FOUNDATION THICKNESS.

COORDINATE THICKENED FOOTING AS REQ'D FOR DOWEL EMBEDMENT.

F

O R

-2

R

E V

IS

E

D F

O R

-2

A S

B U

IL

T

-0

9-

D

ES

IG

N

P

AC

KA

G

E

- R

EC

O R

D D

R

AW

IN

G

S

DESIGN PACKAGE 2 - RECORD DRAWINGS

RE

CO

RD

D

RA

W

9" 3/4" 25' - 4 1/2" 3/4" 9"

27' - 0"

4 1/2" 1' - 1 1/2" 5 SPA. @ 4'-0" = 20' - 0" 4 5/8" 3' - 7 3/8" 1' - 1 1/2" 4 1/2"

/2

/2

S

P A

/2

/2

S

P A

3' - 6 1/2" 4 SPA. @ 4'-0" = 16' - 0" 3 1/2" 2' - 0 5/8"

SJX001 TYP. U.N.O.

10' - 10"

4" 1' - 1" 2' - 0" 2' - 0" 2' - 0" 2' - 0" 1' - 1" 4"

1' - 5" 2' - 0" 2' - 0" 2' - 0" 2' - 0" 1' - 5"

D.A.

DB

D.1 D.2

4" 10' - 2" 4"

SJX001 TYP. U.N.O.

N

A

B C

US Army Corps of Engineers

SHEET ID

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

F

IL

E N

A M

E

IS

S

U E

D A

T E

T A

S K

O R

D E

R N

O

P R

IM

E

C O

N T

R A

C T

N O

P R

O J E

C T

N U

M B

E R

A

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

D E

S C

R

IP

T

IO

N

SHEET OF

W H

N -2

-F

D E

S

IG

N P

A C

K A

G E

IS

S

U E

D F

O R

C O

N S

T R

U C

T

IO

N

H

A Z

E L T

IN

E

N A

T

IO

N A

L D

R

S U

IT

E

O

L A

N D

O F

L

W H

N -2

-D

-3

X L W

U S

T T

Y A

L L D

V

12/9/2024 2:08:01 PM

ST104

T Y

N D

A L L A

IR

F

O R

C E

B A

S E

P N

X L W

U

A G

M

N L B

T H

A G

M

/1

/2

P N

X L W

U

DORM COMPLEX

T y n d a ll

A ir F o rc e B a s e

F lo ri d a

F D

N E

M B

E D

P L A

N C

O O

L

IN

G T

O W

E R

-T R

A S

H E

N C

L O

S U

R E

ST1041/4" = 1'-0"

AFDN. EMBED PLAN COOLING TOWER

N

ST1041/4" = 1'-0"

BFDN. EMBED PLAN TRASH ENCLOSURE

N

M A

R K

D A

T E

F

O R

A P

P R

O V

A L

O N

LY

N O

T F

O R

IF

C

5-

-2

6-

-2

F O

R

IF

C A

P P

R O

V A

L

TYPICAL COMMENTS APPLYING TO ALL SHEETS OF THIS SUBMITTAL

1. REFER TO ASI001 FOR MOST CURRENT STRUCTURAL FOUNDATION THICKNESS.

COORDINATE THICKENED FOOTING AS REQ'D FOR DOWEL EMBEDMENT.

F

O R

-2

A S

B U

IL

T

-0

9-

D

ES

IG

N

P

AC

KA

G

E

- R

EC

O R

D D

R

AW

IN

G

S

DESIGN PACKAGE 2 - RECORD DRAWINGS

RE

CO

RD

D

RA

W

C

D

E

8"21' - 5 3/4"11' - 2 7/8"32' - 8"32' - 8"32' - 8"32' - 8"32' - 8 1/2"1' - 1"

197' - 10 1/8"

3/4"

10' - 10 1/4"

715 14 13 12 11 10 9 8

/2

/2

/4

D .T

L E

N G

T H

/2

/4

/2

1/2"10' - 10 1/4"1/2"10' - 10 1/4"1/2"10' - 10 1/4"1/2"10' - 10 1/4"1/2"10' - 10 1/4"1/2"10' - 10 1/4"1/2"10' - 10 1/4"1/2"10' - 10 1/4"1/2"10' - 10 1/4"1/2"10' - 10 1/4"1/2"10' - 10 1/4"1/2"10' - 10 1/4"1/2"10' - 10 1/4"1/2"10' - 10 1/4"1/2"10' - 10 1/4"1/2"10' - 10 1/4"1/2"10' - 10"

3/4"

ST420

ST420

ST420

ST420

ST420

ST420

ST420

ST420

ST420

ST420

ST420

ST420

ST420

ST420

ST420

ST420

ST420

ST160

B

B

B S

T

8' - 8" 1' - 1"

ST412

ST412

T/D.T.

12' - 9"

T/DT

12' - 9"

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

ST350

A

ST350

B

ST350

C

TYP @ B

D T

-0

N

A

B C

US Army Corps of Engineers

SHEET ID

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

F

IL

E N

A M

E

IS

S

U E

D A

T E

T A

S K

O R

D E

R N

O

P R

IM

E

C O

N T

R A

C T

N O

P R

O J E

C T

N U

M B

E R

A

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

D E

S C

R

IP

T

IO

N

SHEET OF

W H

N -2

-F

D E

S

IG

N P

A C

K A

G E

IS

S

U E

D F

O R

C O

N S

T R

U C

T

IO

N

H

A Z

E L T

IN

E

N A

T

IO

N A

L D

R

S U

IT

E

O

L A

N D

O F

L

W H

N -2

-D

-3

X L W

U S

T T

Y A

L L D

V

12/9/2024 2:08:08 PM

ST110

T Y

N D

A L L A

IR

F

O R

C E

B A

S E

P N

X L W

U

A G

M

N L B

T H

A G

M

/1

/2

P N

X L W

U

DORM COMPLEX

T y n d a ll

A ir F o rc e B a s e

F lo ri d a

L E

V E

L

F R

A M

IN

G

P L A

N A

R

ST1101/8" = 1'-0"

ABAREA A 2nd LEVEL PLAN

N

M A

R K

D A

T E

F

O R

A P

P R

O V

A L

O N

LY

N O

T F

O R

IF

C

5-

-2

6-

-2

F O

R

IF

C A

P P

R O

V A

L

F

O R

-2

A S

B U

IL

T

-0

9-

D

ES

IG

N

P

AC

KA

G

E

- R

EC

O R

D D

R

AW

IN

G

S

DESIGN PACKAGE 2 - RECORD DRAWINGS

RE

CO

RD

D

RA

W

A B C D G H J K M N PF

.0

/AB ST110

C

B S

T

C

B S

T

ST161

B

ST162

B

6' - 6" 7' - 4 1/2"

ST430

ST430

/4

20' - 9 1/2" 8' - 0" 13' - 7 1/2" 10' - 4" 10' - 0" 14' - 0" 13' - 10 1/2" 10' - 4" 12' - 4 7/8" 13' - 1" 1' - 9"

/4

/2

/4

/4

N

A

B C

US Army Corps of Engineers

SHEET ID

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

F

IL

E N

A M

E

IS

S

U E

D A

T E

T A

S K

O R

D E

R N

O

P R

IM

E

C O

N T

R A

C T

N O

P R

O J E

C T

N U

M B

E R

A

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

D E

S C

R

IP

T

IO

N

SHEET OF

W H

N -2

-F

D E

S

IG

N P

A C

K A

G E

IS

S

U E

D F

O R

C O

N S

T R

U C

T

IO

N

H

A Z

E L T

IN

E

N A

T

IO

N A

L D

R

S U

IT

E

O

L A

N D

O F

L

W H

N -2

-D

-3

X L W

U S

T T

Y A

L L D

V

12/9/2024 2:08:13 PM

ST111

T Y

N D

A L L A

IR

F

O R

C E

B A

S E

P N

X L W

U

A G

M

N L B

T H

A G

M

/1

/2

P N

X L W

U

DORM COMPLEX

T y n d a ll

A ir F o rc e B a s e

F lo ri d a

L E

V E

L

F R

A M

IN

G

P L A

N A

R

ST1111/8" = 1'-0"

BB2nd FLOOR AREA B

N

SIM

M A

R K

D A

T E

F

O R

A P

P R

O V

A L

O N

LY

N O

T F

O R

IF

C

5-

-2

6-

-2

F O

R

IF

C A

P P

R O

V A

L

F

O R

-2

A S

B U

IL

T

-0

9-

D

ES

IG

N

P

AC

KA

G

E

- R

EC

O R

D D

R

AW

IN

G

S

DESIGN PACKAGE 2 - RECORD DRAWINGS

RE

CO

RD

D

RA

W

N P Q R S T U V

B

B S

T

198' - 3"

1' - 1" 32' - 8 1/2" 32' - 8" 32' - 8" 32' - 8" 32' - 8" 32' - 8 1/2" 1' - 1"

3/4" 10' - 10 1/4" 1/2" 10' - 10 1/4" 1/2" 10' - 10 1/4" 1/2" 10' - 10 1/4" 1/2" 10' - 10 1/4" 1/2" 10' - 10 1/4" 1/2" 10' - 10 1/4" 1/2" 10' - 10 1/4" 1/2" 10' - 10 1/4" 1/2" 10' - 10 1/4" 1/2" 10' - 10 1/4" 1/2" 10' - 10 1/4" 1/2" 10' - 10 1/4" 1/2" 10' - 10 1/4" 1/2" 10' - 10 1/4" 1/2" 10' - 10 1/4" 1/2" 10' - 10 1/4" 1/2" 10' - 10 1/4" 3/4"

B

B S

T

ST420

ST420

ST420

ST420

ST420

ST420

ST420

ST420

ST420

ST420

ST420

ST420

ST420

ST420

ST420

ST420

ST420

/4

/2

/4

1' - 1" 8' - 8 1/8"

ST163

B

ST412

ST412

T/D.T.

12' - 9"

T/DT

12' - 9"

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

ST351

D

TYP. @ 8

ST351

E

ST351

F

N

A

B C

US Army Corps of Engineers

SHEET ID

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

F

IL

E N

A M

E

IS

S

U E

D A

T E

T A

S K

O R

D E

R N

O

P R

IM

E

C O

N T

R A

C T

N O

P R

O J E

C T

N U

M B

E R

A

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

D E

S C

R

IP

T

IO

N

SHEET OF

W H

N -2

-F

D E

S

IG

N P

A C

K A

G E

IS

S

U E

D F

O R

C O

N S

T R

U C

T

IO

N

H

A Z

E L T

IN

E

N A

T

IO

N A

L D

R

S U

IT

E

O

L A

N D

O F

L

W H

N -2

-D

-3

X L W

U S

T T

Y A

L L D

V

12/9/2024 2:08:20 PM

ST112

T Y

N D

A L L A

IR

F

O R

C E

B A

S E

P N

X L W

U

A G

M

N L B

T H

A G

M

/1

/2

P N

X L W

U

DORM COMPLEX

T y n d a ll

A ir F o rc e B a s e

F lo ri d a

L E

V E

L

F R

A M

IN

G

P L A

N A

R

ST1121/8" = 1'-0"

CB2nd FLOOR AREA C

N

M A

R K

D A

T E

F

O R

A P

P R

O V

A L

O N

LY

N O

T F

O R

IF

C

5-

-2

6-

-2

F O

R

IF

C A

P P

R O

V A

L

F

O R

-2

A S

B U

IL

T

-0

9-

D

ES

IG

N

P

AC

KA

G

E

- R

EC

O R

D D

R

AW

IN

G

S

DESIGN PACKAGE 2 - RECORD DRAWINGS

RE

CO

RD

D

RA

W

C

D

E

15 14 13 12 11 10 9 8

/4

D .T

L E

N G

T H

/2

/4

/2

197' - 10 1/8"

8"21' - 5 3/4"11' - 2 7/8"32' - 8"32' - 8"32' - 8"32' - 8"32' - 8 1/2"1' - 1"

3/4"

10' - 10 1/4"1/2"10' - 10 1/4"1/2"10' - 10 1/4"1/2"10' - 10 1/4"1/2"10' - 10 1/4"1/2"10' - 10 1/4"1/2"10' - 10 1/4"1/2"10' - 10 1/4"1/2"10' - 10 1/4"1/2"10' - 10 1/4"1/2"10' - 10 1/4"1/2"10' - 10 1/4"1/2"10' - 10 1/4"1/2"10' - 10 1/4"1/2"10' - 10 1/4"1/2"10' - 10 1/4"1/2"10' - 10 3/4"10' - 10"

3/4"

/2

/2

ST420

ST420

ST420

ST420

ST420

ST420

ST420

ST420

ST420

ST420

ST420

ST420

ST420

ST420

ST420

ST420

ST420

ST160

C

ST412

T/D.T.

25' - 3"

T/DT

25' - 3"

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

N

A

B C

US Army Corps of Engineers

SHEET ID

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

F

IL

E N

A M

E

IS

S

U E

D A

T E

T A

S K

O R

D E

R N

O

P R

IM

E

C O

N T

R A

C T

N O

P R

O J E

C T

N U

M B

E R

A

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

D E

S C

R

IP

T

IO

N

SHEET OF

W H

N -2

-F

D E

S

IG

N P

A C

K A

G E

IS

S

U E

D F

O R

C O

N S

T R

U C

T

IO

N

H

A Z

E L T

IN

E

N A

T

IO

N A

L D

R

S U

IT

E

O

L A

N D

O F

L

W H

N -2

-D

-3

X L W

U S

T T

Y A

L L D

V

12/9/2024 2:08:27 PM

ST120

T Y

N D

A L L A

IR

F

O R

C E

B A

S E

P N

X L W

U

A G

M

N L B

T H

A G

M

/1

/2

P N

X L W

U

DORM COMPLEX

T y n d a ll

A ir F o rc e B a s e

F lo ri d a

L E

V E

L

F R

A M

IN

G

P L A

N A

R

ST1201/8" = 1'-0"

ACAREA-A 3rd LEVEL PLAN

N

M A

R K

D A

T E

R e v is io n

/1

/2

F O

R A

P P

R O

V A

L O

N

LY

N

O T

F O

R

IF

C 5-

-2

6-

-2

F O

R

IF

C A

P P

R O

V A

L

F

O R

-2

R

E V

IS

E

D F

O R

-2

A S

B U

IL

T

-0

9-

D

ES

IG

N

P

AC

KA

G

E

- R

EC

O R

D D

R

AW

IN

G

S

DESIGN PACKAGE 2 - RECORD DRAWINGS

RE

CO

RD

D

RA

W

A B C D G H J K M N PF

ST161

C

ST162

C

ST430

ST430

/4

6' - 6" 7' - 4 1/2"

20' - 9 1/2" 8' - 0" 13' - 7 1/2" 10' - 4" 10' - 0" 14' - 0" 13' - 10 1/2" 10' - 4" 12' - 4 7/8" 13' - 1" 1' - 9"

C

C S

T

/AC ST120

/4

/2

/4

/4

N

A

B C

US Army Corps of Engineers

SHEET ID

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

F

IL

E N

A M

E

IS

S

U E

D A

T E

T A

S K

O R

D E

R N

O

P R

IM

E

C O

N T

R A

C T

N O

P R

O J E

C T

N U

M B

E R

A

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

D E

S C

R

IP

T

IO

N

SHEET OF

W H

N -2

-F

D E

S

IG

N P

A C

K A

G E

IS

S

U E

D F

O R

C O

N S

T R

U C

T

IO

N

H

A Z

E L T

IN

E

N A

T

IO

N A

L D

R

S U

IT

E

O

L A

N D

O F

L

W H

N -2

-D

-3

X L W

U S

T T

Y A

L L D

V

12/10/2024 10:08:15 AM

ST121

T Y

N D

A L L A

IR

F

O R

C E

B A

S E

P N

X L W

U

A G

M

N L B

T H

A G

M

/1

/2

P N

X L W

U

DORM COMPLEX

T y n d a ll

A ir F o rc e B a s e

F lo ri d a

L E

V E

L

F R

A M

IN

G

P L A

N A

R

ST1211/8" = 1'-0"

BC3rd FLOOR AREA B

N

SIM

M A

R K

D A

T E

F

O R

A P

P R

O V

A L

O N

LY

N O

T F

O R

IF

C

5-

-2

6-

-2

F O

R

IF

C A

P P

R O

V A

L

F

O R

-2

A S

B U

IL

T

-0

9-

D

ES

IG

N

P

AC

KA

G

E

- R

EC

O R

D D

R

AW

IN

G

S

DESIGN PACKAGE 2 - RECORD DRAWINGS

RE

CO

RD

D

RA

W

B

C S

T

198' - 3"

1' - 0 7/8" 32' - 8 1/2" 32' - 8" 32' - 8" 32' - 8" 32' - 8" 32' - 8 1/2" 1' - 1"

3/4" 10' - 10 1/4" 1/2" 10' - 10 1/4" 1/2" 10' - 10 1/4" 1/2" 10' - 10 1/4" 1/2" 10' - 10 1/4" 1/2" 10' - 10 1/4" 1/2" 10' - 10 1/4" 1/2" 10' - 10 1/4" 1/2" 10' - 10 1/4" 1/2" 10' - 10 1/4" 1/2" 10' - 10 1/4" 1/2" 10' - 10 1/4" 1/2" 10' - 10 1/4" 1/2" 10' - 10 1/4" 1/2" 10' - 10 1/4" 1/2" 10' - 10 1/4" 1/2" 10' - 10 1/4" 1/2" 10' - 10 1/4" 3/4"

/4

/4

1' - 1" 8' - 8 1/8"

ST420

ST420

ST420

ST420

ST420

ST420

ST420

ST420

ST420

ST420

ST420

ST420

ST420

ST420

ST420

ST420

ST420

ST163

C

ST273

ST412

ST412

2T/DT

25' - 3"

T/D.T.

25' - 3"

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

N

A

B C

US Army Corps of Engineers

SHEET ID

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

F

IL

E N

A M

E

IS

S

U E

D A

T E

T A

S K

O R

D E

R N

O

P R

IM

E

C O

N T

R A

C T

N O

P R

O J E

C T

N U

M B

E R

A

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

D E

S C

R

IP

T

IO

N

SHEET OF

W H

N -2

-F

D E

S

IG

N P

A C

K A

G E

IS

S

U E

D F

O R

C O

N S

T R

U C

T

IO

N

H

A Z

E L T

IN

E

N A

T

IO

N A

L D

R

S U

IT

E

O

L A

N D

O F

L

W H

N -2

-D

-3

X L W

U S

T T

Y A

L L D

V

12/10/2024 10:08:20 AM

ST122

T Y

N D

A L L A

IR

F

O R

C E

B A

S E

P N

X L W

U

A G

M

N L B

T H

A G

M

/1

/2

P N

X L W

U

DORM COMPLEX

T y n d a ll

A ir F o rc e B a s e

F lo ri d a

L E

V E

L

F R

A M

IN

G

P L A

N A

R

ST1221/8" = 1'-0"

CCAREA C 3rd LEVEL PLAN

N

M A

R K

D A

T E

F

O R

A P

P R

O V

A L

O N

LY

N O

T F

O R

IF

C

5-

-2

6-

-2

F O

R

IF

C A

P P

R O

V A

L

F

O R

-2

A S

B U

IL

T

-0

9-

D

ES

IG

N

P

AC

KA

G

E

- R

EC

O R

D D

R

AW

IN

G

S

DESIGN PACKAGE 2 - RECORD DRAWINGS

RE

CO

RD

D

RA

W

C

D

E

15 14 13 12 11 10 9 8

/4

D .T

L E

N G

T H

/2

/4

/2

197' - 10 1/8"

8"21' - 5 3/4"11' - 2 7/8"32' - 8"32' - 8"32' - 8"32' - 8"32' - 8 1/2"1' - 1"

3/4"

10' - 10 1/4"1/2"10' - 10 1/4"1/2"10' - 10 1/4"1/2"10' - 10 1/4"1/2"10' - 10 1/4"1/2"10' - 10 1/4"1/2"10' - 10 1/4"1/2"10' - 10 1/4"1/2"10' - 10 1/4"1/2"10' - 10 1/4"1/2"10' - 10 1/4"1/2"10' - 10 1/4"1/2"10' - 10 1/4"1/2"10' - 10 1/4"1/2"10' - 10 1/4"1/2"10' - 10 1/4"1/2"10' - 10 3/4"10' - 10"

3/4"

/2

/2

ST420

ST420

ST420

ST420

ST420

ST420

ST420

ST420

ST420

ST420

ST420

ST420

ST420

ST420

ST420

ST420

ST420

ST160

D

ST412

T/D.T.

37' - 9"

T/FTG.

37' - 9"

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

N

A

B C

US Army Corps of Engineers

SHEET ID

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

F

IL

E N

A M

E

IS

S

U E

D A

T E

T A

S K

O R

D E

R N

O

P R

IM

E

C O

N T

R A

C T

N O

P R

O J E

C T

N U

M B

E R

A

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

D E

S C

R

IP

T

IO

N

SHEET OF

W H

N -2

-F

D E

S

IG

N P

A C

K A

G E

IS

S

U E

D F

O R

C O

N S

T R

U C

T

IO

N

H

A Z

E L T

IN

E

N A

T

IO

N A

L D

R

S U

IT

E

O

L A

N D

O F

L

W H

N -2

-D

-3

X L W

U S

T T

Y A

L L D

V

12/9/2024 2:08:45 PM

ST130

T Y

N D

A L L A

IR

F

O R

C E

B A

S E

P N

X L W

U

A G

M

N L B

T H

A G

M

/1

/2

P N

X L W

U

DORM COMPLEX

T y n d a ll

A ir F o rc e B a s e

F lo ri d a

L E

V E

L

F R

A M

IN

G

P L A

N A

R

ST1301/8" = 1'-0"

ADAREA - A 4th LEVEL PLAN

N

M A

R K

D A

T E

R e v is io n

/1

/2

F O

R A

P P

R O

V A

L O

N

LY

N

O T

F O

R

IF

C 5-

-2

6-

-2

F O

R

IF

C A

P P

R O

V A

L

F

O R

-2

R

E V

IS

E

D F

O R

-2

A S

B U

IL

T

-0

9-

D

ES

IG

N

P

AC

KA

G

E

- R

EC

O R

D D

R

AW

IN

G

S

DESIGN PACKAGE 2 - RECORD DRAWINGS

RE

CO

RD

D

RA

W

A B C D G H J K M N PF

20' - 9 1/2" 8' - 0" 13' - 7 1/2" 10' - 4" 10' - 0" 14' - 0" 13' - 10 1/2" 10' - 4" 12' - 4 7/8" 13' - 1" 1' - 9"

/4

/2

/4

/4

/AD ST130

C

D S

T

6' - 6" 7' - 4 1/2"

ST430

ST430

ST161

D

ST162

D

SIM

N

A

B C

US Army Corps of Engineers

SHEET ID

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

F

IL

E N

A M

E

IS

S

U E

D A

T E

T A

S K

O R

D E

R N

O

P R

IM

E

C O

N T

R A

C T

N O

P R

O J E

C T

N U

M B

E R

A

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

D E

S C

R

IP

T

IO

N

SHEET OF

W H

N -2

-F

D E

S

IG

N P

A C

K A

G E

IS

S

U E

D F

O R

C O

N S

T R

U C

T

IO

N

H

A Z

E L T

IN

E

N A

T

IO

N A

L D

R

S U

IT

E

O

L A

N D

O F

L

W H

N -2

-D

-3

X L W

U S

T T

Y A

L L D

V

12/9/2024 2:08:50 PM

ST131

T Y

N D

A L L A

IR

F

O R

C E

B A

S E

P N

X L W

U

A G

M

N L B

T H

A G

M

/1

/2

P N

X L W

U

DORM COMPLEX

T y n d a ll

A ir F o rc e B a s e

F lo ri d a

L E

V E

L

F R

A M

IN

G

P L A

N A

R

ST1311/8" = 1'-0"

BD4th FLOOR AREA B

N

M A

R K

D A

T E

F

O R

A P

P R

O V

A L

O N

LY

N O

T F

O R

IF

C

5-

-2

6-

-2

F O

R

IF

C A

P P

R O

V A

L

F

O R

-2

A S

B U

IL

T

-0

9-

D

ES

IG

N

P

AC

KA

G

E

- R

EC

O R

D D

R

AW

IN

G

S

DESIGN PACKAGE 2 - RECORD DRAWINGS

RE

CO

RD

D

RA

W

/4

/4

1' - 1" 32' - 8 1/2" 32' - 8" 32' - 8" 32' - 8" 32' - 8" 32' - 8 1/2" 1' - 1"

3/4" 10' - 10 1/4" 1/2" 10' - 10 1/4" 1/2" 10' - 10 1/4" 1/2" 10' - 10 1/4" 1/2" 10' - 10 1/4" 1/2" 10' - 10 1/4" 1/2" 10' - 10 1/4" 1/2" 10' - 10 1/4" 1/2" 10' - 10 1/4" 1/2" 10' - 10 1/4" 1/2" 10' - 10 1/4" 1/2" 10' - 10 1/4" 1/2" 10' - 10 1/4" 1/2" 10' - 10 1/4" 1/2" 10' - 10 1/4" 1/2" 10' - 10 1/4" 1/2" 10' - 10 1/4" 1/2" 10' - 10 1/4" 3/4"

8"

ST420

ST420

ST420

ST420

ST420

ST420

ST420

ST420

ST420

ST420

ST420

ST420

ST420

ST420

ST420

ST420

ST420

ST412

ST412

2 1' - 1"T/DT

37' - 9"

T/D.T.

37' - 9"

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

ST163

D

198' - 3"

N

A

B C

US Army Corps of Engineers

SHEET ID

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

F

IL

E N

A M

E

IS

S

U E

D A

T E

T A

S K

O R

D E

R N

O

P R

IM

E

C O

N T

R A

C T

N O

P R

O J E

C T

N U

M B

E R

A

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

D E

S C

R

IP

T

IO

N

SHEET OF

W H

N -2

-F

D E

S

IG

N P

A C

K A

G E

IS

S

U E

D F

O R

C O

N S

T R

U C

T

IO

N

H

A Z

E L T

IN

E

N A

T

IO

N A

L D

R

S U

IT

E

O

L A

N D

O F

L

W H

N -2

-D

-3

X L W

U S

T T

Y A

L L D

V

12/9/2024 2:08:56 PM

ST132

T Y

N D

A L L A

IR

F

O R

C E

B A

S E

P N

X L W

U

A G

M

N L B

T H

A G

M

/1

/2

P N

X L W

U

DORM COMPLEX

T y n d a ll

A ir F o rc e B a s e

F lo ri d a

L E

V E

L

F R

A M

IN

G

P L A

N A

R

ST1321/8" = 1'-0"

CDAREA - C 4th LEVEL PLAN

N

M A

R K

D A

T E

F

O R

A P

P R

O V

A L

O N

LY

N O

T F

O R

IF

C

5-

-2

6-

-2

F O

R

IF

C A

P P

R O

V A

L

F

O R

-2

A S

B U

IL

T

-0

9-

D

ES

IG

N

P

AC

KA

G

E

- R

EC

O R

D D

R

AW

IN

G

S

DESIGN PACKAGE 2 - RECORD DRAWINGS

RE

CO

RD

D

RA

W

C

D

E

10' - 10 1/4"

15 14 13 12 11 10 9 8

1/2"10' - 10 1/4"1/2"10' - 10 1/4"1/2"10' - 10 1/4"1/2"10' - 10 1/4"1/2"10' - 10 1/4"1/2"10' - 10 1/4"1/2"10' - 10 1/4"1/2"10' - 10 1/4"1/2"10' - 10 1/4"1/2"10' - 10 1/4"1/2"10' - 10 1/4"1/2"10' - 10 1/4"1/2"10' - 10 1/4"1/2"10' - 10 1/4"1/2"10' - 10 1/4"1/2"10' - 10 1/4"1/2"10' - 10"

8"21' - 5 3/4"11' - 2 7/8"32' - 8"32' - 8"32' - 8"32' - 8"32' - 8 1/2"1' - 1"

197' - 10 1/8"

/2

/2

/4

D .T

L E

N G

T H

/2

/4

/2

ST420

ST420

ST420

ST420

ST420

ST420

ST420

ST420

ST420

ST420

ST420

ST420

ST420

ST420

ST420

ST420

ST160

E

ST412

T/D.T.

50' - 3"

T/FTG.

50' - 3"

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

N

A

B C

US Army Corps of Engineers

SHEET ID

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

F

IL

E N

A M

E

IS

S

U E

D A

T E

T A

S K

O R

D E

R N

O

P R

IM

E

C O

N T

R A

C T

N O

P R

O J E

C T

N U

M B

E R

A

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

D E

S C

R

IP

T

IO

N

SHEET OF

W H

N -2

-F

D E

S

IG

N P

A C

K A

G E

IS

S

U E

D F

O R

C O

N S

T R

U C

T

IO

N

H

A Z

E L T

IN

E

N A

T

IO

N A

L D

R

S U

IT

E

O

L A

N D

O F

L

W H

N -2

-D

-3

X L W

U S

T T

Y A

L L D

V

12/9/2024 2:09:02 PM

ST140

T Y

N D

A L L A

IR

F

O R

C E

B A

S E

P N

X L W

U

A G

M

N L B

T H

A G

M

/1

/2

P N

X L W

U

DORM COMPLEX

T y n d a ll

A ir F o rc e B a s e

F lo ri d a

L E

V E

L

F R

A M

IN

G

P L A

N A

R

ST1401/8" = 1'-0"

AEAREA - A 5th LEVEL PLAN

N

M A

R K

D A

T E

R e v is io n

/1

/2

F O

R A

P P

R O

V A

L O

N

LY

N

O T

F O

R

IF

C 5-

-2

6-

-2

F O

R

IF

C A

P P

R O

V A

L

F

O R

-2

R

E V

IS

E

D F

O R

-2

A S

B U

IL

T

-0

9-

D

ES

IG

N

P

AC

KA

G

E

- R

EC

O R

D D

R

AW

IN

G

S

DESIGN PACKAGE 2 - RECORD DRAWINGS

RE

CO

RD

D

RA

W

A B C D G H J K M N PF

ST430

ST430

/4

/AE ST140

C

E S

T

20' - 9 1/2" 8' - 0" 13' - 7 1/2" 10' - 4" 10' - 0" 14' - 0" 13' - 10 1/2" 10' - 4" 12' - 4 7/8" 13' - 1" 1' - 9"

/4

/2

/4

/4

ST161

E

ST162

E

SIM

6' - 6" 7' - 4 1/2"

N

A

B C

US Army Corps of Engineers

SHEET ID

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

F

IL

E N

A M

E

IS

S

U E

D A

T E

T A

S K

O R

D E

R N

O

P R

IM

E

C O

N T

R A

C T

N O

P R

O J E

C T

N U

M B

E R

A

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

D E

S C

R

IP

T

IO

N

SHEET OF

W H

N -2

-F

D E

S

IG

N P

A C

K A

G E

IS

S

U E

D F

O R

C O

N S

T R

U C

T

IO

N

H

A Z

E L T

IN

E

N A

T

IO

N A

L D

R

S U

IT

E

O

L A

N D

O F

L

W H

N -2

-D

-3

X L W

U S

T T

Y A

L L D

V

12/9/2024 2:09:07 PM

ST141

T Y

N D

A L L A

IR

F

O R

C E

B A

S E

P N

X L W

U

A G

M

N L B

T H

A G

M

/1

/2

P N

X L W

U

DORM COMPLEX

T y n d a ll

A ir F o rc e B a s e

F lo ri d a

L E

V E

L

F R

A M

IN

G

P L A

N A

R

ST1411/8" = 1'-0"

BEAREA - B 5th LEVEL PLAN

M A

R K

D A

T E

F

O R

A P

P R

O V

A L

O N

LY

N O

T F

O R

IF

C

5-

-2

6-

-2

F O

R

IF

C A

P P

R O

V A

L

F

O R

-2

A S

B U

IL

T

-0

9-

D

ES

IG

N

P

AC

KA

G

E

- R

EC

O R

D D

R

AW

IN

G

S

DESIGN PACKAGE 2 - RECORD DRAWINGS

RE

CO

RD

D

RA

W

/4

/4

8" 1' - 1" 32' - 8 1/2" 32' - 8" 32' - 8" 32' - 8" 32' - 8" 32' - 8 1/2" 1' - 1"

3/4" 10' - 10 1/4" 1/2" 10' - 10 1/4" 1/2" 10' - 10 1/4" 1/2" 10' - 10 1/4" 1/2" 10' - 10 1/4" 1/2" 10' - 10 1/4" 1/2" 10' - 10 1/4" 1/2" 10' - 10 1/4" 1/2" 10' - 10 1/4" 1/2" 10' - 10 1/4" 1/2" 10' - 10 1/4" 1/2" 10' - 10 1/4" 1/2" 10' - 10 1/4" 1/2" 10' - 10 1/4" 1/2" 10' - 10 1/4" 1/2" 10' - 10 1/4" 1/2" 10' - 10 1/4" 1/2" 10' - 10 1/4" 3/4"

198' - 3"

ST420

ST420

ST420

ST420

ST420

ST420

ST420

ST420

ST420

ST420

ST420

ST420

ST420

ST420

ST420

ST420

ST420

____________________________________________ ST412

ST412

T/D.T.

50' - 3"

T/DT

50' - 3"

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

ST163

E

ST610

N

A

B C

US Army Corps of Engineers

SHEET ID

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

F

IL

E N

A M

E

IS

S

U E

D A

T E

T A

S K

O R

D E

R N

O

P R

IM

E

C O

N T

R A

C T

N O

P R

O J E

C T

N U

M B

E R

A

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

D E

S C

R

IP

T

IO

N

SHEET OF

W H

N -2

-F

D E

S

IG

N P

A C

K A

G E

IS

S

U E

D F

O R

C O

N S

T R

U C

T

IO

N

H

A Z

E L T

IN

E

N A

T

IO

N A

L D

R

S U

IT

E

O

L A

N D

O F

L

W H

N -2

-D

-3

X L W

U S

T T

Y A

L L D

V

12/9/2024 2:09:13 PM

ST142

T Y

N D

A L L A

IR

F

O R

C E

B A

S E

P N

X L W

U

A G

M

N L B

T H

A G

M

/1

/2

P N

X L W

U

DORM COMPLEX

T y n d a ll

A ir F o rc e B a s e

F lo ri d a

L E

V E

L

F R

A M

IN

G

P L A

N B

L D

G

C

ST1421/8" = 1'-0"

CEAREA - C 5th LEVEL PLAN

N

M A

R K

D A

T E

F

O R

A P

P R

O V

A L

O N

LY

N O

T F

O R

IF

C

5-

-2

6-

-2

F O

R

IF

C A

P P

R O

V A

L

F

O R

-2

A S

B U

IL

T

-0

9-

D

ES

IG

N

P

AC

KA

G

E

- R

EC

O R

D D

R

AW

IN

G

S

DESIGN PACKAGE 2 - RECORD DRAWINGS

RE

CO

RD

D

RA

W

C

D

E

8"21' - 5 3/4"11' - 2 7/8"32' - 8"32' - 8"32' - 8"32' - 8"32' - 8 1/2"1' - 1"

197' - 10 1/8"

3/4"

D.T.

8' - 2 1/4"1/2"

D.T.

8' - 2 1/4"1/2"

D.T.

10' - 10 1/8"1/2"

D.T.

10' - 10 1/8"1/2"

D.T.

10' - 10 1/8"1/2"

D.T.

10' - 10 1/8"1/2"

D.T.

10' - 10 1/8"1/2"

D.T.

10' - 10 1/8"1/2"

D.T.

10' - 10 1/8"1/2"

D.T.

10' - 10 1/8"1/2"

D.T.

10' - 10 1/8"1/2"

D.T.

10' - 10 1/8"1/2"

D.T.

10' - 10 1/8"1/2"

D.T.

10' - 10 1/8"1/2"

D.T.

10' - 10 1/8"1/2"

D.T.

10' - 10 1/8"1/2"

D.T.

10' - 10 1/8"5/8"

D.T.

8' - 1 3/8"1/2"

D.T.

8' - 1 3/8"3/4"

15 14 13 12 11 10 9 8

/2

/2

/4

D .T

L E

N G

T H

/2

/4

F M

X

L O

C A

T

IO

N

/2

F M

X

L O

C A

T

IO

N

ST420

ST430

ST420

ST430

ST430

ST430

ST430

ST430

ST430

ST430

ST430

ST430

ST420

ST420

ST420

ST420

ST420

ST160

F

T/DT

63' - 3"

T/DT

63' - 3"

T/DT

63' - 3"

T/DT

65' - 3 1/2"

T/DT

64' - 7 1/2"

T/DT

64' - 7 1/2"

T/D.T.

65' - 3 1/2"

T/D.T.

63' - 3"

T/D.T.

64' - 7 1/2"

T/D.T.

63' - 3"

T/D.T.

64' - 7 3/8"

T/D.T.

63' - 3" T/D.T.

63' - 11 1/8"

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

/8

/4

5" Dia.

TYP.

N

A

B C

US Army Corps of Engineers

SHEET ID

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

F

IL

E N

A M

E

IS

S

U E

D A

T E

T A

S K

O R

D E

R N

O

P R

IM

E

C O

N T

R A

C T

N O

P R

O J E

C T

N U

M B

E R

A

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

D E

S C

R

IP

T

IO

N

SHEET OF

W H

N -2

-F

D E

S

IG

N P

A C

K A

G E

IS

S

U E

D F

O R

C O

N S

T R

U C

T

IO

N

H

A Z

E L T

IN

E

N A

T

IO

N A

L D

R

S U

IT

E

O

L A

N D

O F

L

W H

N -2

-D

-3

X L W

U S

T T

Y A

L L D

V

12/9/2024 2:09:19 PM

ST150

T Y

N D

A L L A

IR

F

O R

C E

B A

S E

P N

X L W

U

A G

M

N L B

T H

A G

M

/1

/2

P N

X L W

U

DORM COMPLEX

T y n d a ll

A ir F o rc e B a s e

F lo ri d a

R O

O F

F R

A M

IN

G

P L A

N A

R E

A A

ST1501/8" = 1'-0"

AFAREA -A ROOF PLAN

N

M A

R K

D A

T E

F

O R

A P

P R

O V

A L

O N

LY

N O

T F

O R

IF

C

5-

-2

6-

-2

F O

R

IF

C A

P P

R O

V A

L

F

O R

-2

A S

B U

IL

T

-0

9-

D

ES

IG

N

P

AC

KA

G

E

- R

EC

O R

D D

R

AW

IN

G

S

DESIGN PACKAGE 2 - RECORD DRAWINGS

RE

CO

RD

D

RA

W

A B C D G H J K M N PF

ST430

ST161

F

ST430

ST430

/AE ST140

C

F S

T

20' - 9 1/2" 8' - 0" 13' - 7 1/2" 10' - 4" 10' - 0" 14' - 0" 13' - 10 1/2" 10' - 4" 12' - 4 7/8" 13' - 1" 1' - 9"

/2

/4

/4

ST162

F

SIM

6' - 6" 7' - 4 1/2"

SIM

N

A

B C

US Army Corps of Engineers

SHEET ID

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

F

IL

E N

A M

E

IS

S

U E

D A

T E

T A

S K

O R

D E

R N

O

P R

IM

E

C O

N T

R A

C T

N O

P R

O J E

C T

N U

M B

E R

A

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

D E

S C

R

IP

T

IO

N

SHEET OF

W H

N -2

-F

D E

S

IG

N P

A C

K A

G E

IS

S

U E

D F

O R

C O

N S

T R

U C

T

IO

N

H

A Z

E L T

IN

E

N A

T

IO

N A

L D

R

S U

IT

E

O

L A

N D

O F

L

W H

N -2

-D

-3

X L W

U S

T T

Y A

L L D

V

12/9/2024 2:09:24 PM

ST151

T Y

N D

A L L A

IR

F

O R

C E

B A

S E

P N

X L W

U

A G

M

N L B

T H

A G

M

/1

/2

P N

X L W

U

DORM COMPLEX

T y n d a ll

A ir F o rc e B a s e

F lo ri d a

R O

O F

F R

A M

IN

G

P L A

N A

R E

A B

ST1511/8" = 1'-0"

BFAREA - B ROOF PLAN

N

M A

R K

D A

T E

F

O R

A P

P R

O V

A L

O N

LY

N O

T F

O R

IF

C

5-

-2

6-

-2

F O

R

IF

C A

P P

R O

V A

L

F

O R

-2

A S

B U

IL

T

-0

9-

D

ES

IG

N

P

AC

KA

G

E

- R

EC

O R

D D

R

AW

IN

G

S

DESIGN PACKAGE 2 - RECORD DRAWINGS

RE

CO

RD

D

RA

W

/4

/4

8" 1' - 1" 32' - 8 1/2" 32' - 8" 32' - 8" 32' - 8" 32' - 8" 32' - 8 1/2" 1' - 1"

ST163

F

3/4" 8' - 2 1/4" 1/2" 8' - 2 1/4" 1/2" 10' - 10 1/4" 1/2" 10' - 10 1/8" 1/2" 10' - 10 1/8" 1/2" 10' - 10 1/8" 1/2" 10' - 10 1/8" 1/2" 10' - 10 1/8" 1/2" 10' - 10 1/8" 1/2" 10' - 10 1/8" 1/2" 10' - 10 1/8" 1/2" 10' - 10 1/8" 1/2" 10' - 10 1/8" 1/2" 10' - 10 1/8" 1/2" 10' - 10 1/8" 1/2" 10' - 10 1/8" 1/2" 10' - 10 1/8" 1/2" 8' - 1 3/8" 1/2" 8' - 1 3/8" 5/8"

ST420

ST430

ST420

ST430

ST430

ST430

ST420

ST420

ST420

ST420

ST420

ST430

ST430

ST430

ST430

ST430

ST430

T/DT

63' - 3"

T/DT

63' - 11 1/8"

T/DT

63' - 3"

T/DT

64' - 7 1/2"

T/DT

63' - 3"

T/DT

64' - 7 1/2"

T/DT

65' - 3 3/8"

T/D.T.

63' - 11 1/8"

T/D.T.

63' - 3"

T/D.T.

64' - 7 1/2"

T/D.T.

63' - 3"

T/D.T.

64' - 7 1/2"

T/D.T.

63' - 3"

T/D.T.

65' - 3 3/8"

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

D T

-0

16' - 4" 16' - 4" 16' - 4" 16' - 4" 16' - 4" 16' - 4" 16' - 4" 16' - 4" 16' - 4" 16' - 4"

/8

/8

5" Dia.

TYP.

N

A

B C

US Army Corps of Engineers

SHEET ID

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

F

IL

E N

A M

E

IS

S

U E

D A

T E

T A

S K

O R

D E

R N

O

P R

IM

E

C O

N T

R A

C T

N O

P R

O J E

C T

N U

M B

E R

A

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

D E

S C

R

IP

T

IO

N

SHEET OF

W H

N -2

-F

D E

S

IG

N P

A C

K A

G E

IS

S

U E

D F

O R

C O

N S

T R

U C

T

IO

N

H

A Z

E L T

IN

E

N A

T

IO

N A

L D

R

S U

IT

E

O

L A

N D

O F

L

W H

N -2

-D

-3

X L W

U S

T T

Y A

L L D

V

12/9/2024 2:09:29 PM

ST152

T Y

N D

A L L A

IR

F

O R

C E

B A

S E

P N

X L W

U

A G

M

N L B

T H

A G

M

/1

/2

P N

X L W

U

DORM COMPLEX

T y n d a ll

A ir F o rc e B a s e

F lo ri d a

R O

O F

F R

A M

IN

G

P L A

N A

R E

A C

ST1521/8" = 1'-0"

CFAREA - C ROOF PLAN

N

M A

R K

D A

T E

F

O R

A P

P R

O V

A L

O N

LY

N O

T F

O R

IF

C

5-

-2

6-

-2

F O

R

IF

C A

P P

R O

V A

L

F

O R

-2

44444444444

R

E V

IS

E

D F

O R

-2

R

E V

IS

E

D F

O R

-2

A S

B U

IL

T

-0

9-

D

ES

IG

N

P

AC

KA

G

E

- R

EC

O R

D D

R

AW

IN

G

S

DESIGN PACKAGE 2 - RECORD DRAWINGS

RE

CO

RD

D

RA

W

B C

ST270

8"

3/4"

4' - 6 1/4" 11 Treads @ 11" = 10' - 1" 5' - 3 1/4"

3/4"

8" 2 1/2"

13' - 6 1/2" 7' - 9 1/2"

21' - 4"

/4

/4

ST440

ST440

ST440

ST440

____________________________________________ 1

/8

10 1/4"

B C

/4

/4

8"

3/4"

4' - 6 1/4" 10 Treads @ 11" = 9' - 2" 6' - 2 1/4"

3/4"

8" 2 1/2"

13' - 6 1/2" 7' - 9 1/2"

21' - 4"

/4

/4

ST440

ST440

ST440

ST440

____________________________________________3

ST440

ST440

ST440

ST440

R .O

/2

7" 6" Dia.

TYP.

B C

/4

/4

8"

3/4"

4' - 6 1/4" 10 Treads @ 11" = 9' - 2" 6' - 2 1/4"

3/4"

8" 2 1/2"

13' - 6 1/2" 7' - 9 1/2"

21' - 4"

/4

/4

ST440

ST440

ST440

ST440

ST440

ST440

ST440

B C

/4

/4

/4

/4

13' - 6 1/2" 7' - 9 1/2"

21' - 4"

8"

3/4"

4' - 6 1/4" 10 Treads @ 11" = 9' - 2" 6' - 2 1/4"

3/4"

8" 2 1/2"

ST440

ST440

ST440

ST440

ST440

ST440

ST440

ST440

B C

/4

/4

13' - 6 1/2" 7' - 9 1/2"

21' - 4"

/4

/4

8" 4' - 7" 10 Treads @ 11" = 9' - 2" 6' - 3" 8" 2 1/2"

ST440

ST440

ST440

ST440

____________________________________________3

ST440

ST440

ST440

ST440

B C

21' - 4"

13' - 6 1/2" 7' - 9 1/2"

8" 3/4"

SLAB LENGTH

19' - 10 1/2" 3/4" 8"

1' - 11 1/4" 4 SPA. @ 4'-0" = 16' - 0" 1' - 11 1/4"

S L

A B

W

ID

T H

ST412

ST412

ST412

ST412

T/SLAB

70' - 0"

T/SLAB

69' - 8"

F S

-0

US Army Corps of Engineers

SHEET ID

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

F

IL

E N

A M

E

IS

S

U E

D A

T E

T A

S K

O R

D E

R N

O

P R

IM

E

C O

N T

R A

C T

N O

P R

O J E

C T

N U

M B

E R

A

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

D E

S C

R

IP

T

IO

N

SHEET OF

W H

N -2

-F

D E

S

IG

N P

A C

K A

G E

IS

S

U E

D F

O R

C O

N S

T R

U C

T

IO

N

H

A Z

E L T

IN

E

N A

T

IO

N A

L D

R

S U

IT

E

O

L A

N D

O F

L

W H

N -2

-D

-3

X L W

U S

T T

Y A

L L D

V

12/9/2024 2:09:36 PM

ST160

T Y

N D

A L L A

IR

F

O R

C E

B A

S E

P N

X L W

U

A G

M

N L B

T H

A G

M

/1

/2

P N

X L W

U

DORM COMPLEX

T y n d a ll

A ir F o rc e B a s e

F lo ri d a

S T

A

IR

F

R A

M

IN

G P

L A

N S

A

B

C

N

KEY PLAN

ST1601/4" = 1'-0"

ASTAIR #1 1st FLOOR

ST1601/4" = 1'-0"

BSTAIR #1 2nd FLOOR

ST1601/4" = 1'-0"

ESTAIR #1 5th FLOOR

ST1601/4" = 1'-0"

CSTAIR #1 3rd FLOOR

ST1601/4" = 1'-0"

DSTAIR #1 4th FLOOR

ST270

ST270

ST270

ST1601/4" = 1'-0"

FSTAIR #1 ROOF FRAMING

N N N

N N N

ST220

M A

R K

D A

T E

F

O R

A P

P R

O V

A L

O N

LY

N O

T F

O R

IF

C

5-

-2

6-

-2

F O

R

IF

C A

P P

R

V

File details come from the government source that posted it. Updated .