PWS -RTS3000(v2).pdf
PDF 2 MB Posted
- Attached to
- RTS-3000 Wash Rack Quarterly Maintenance
- Solicitation number
- FA481925Q0008
About this file
This Performance Work Statement (PWS) details quarterly preventative maintenance requirements for the RTS-3000 Wash Rack System located at Tyndall Air Force Base, Florida. The 325 Logistics Readiness Squadron requires a contractor to perform comprehensive maintenance tasks on the water treatment system, which operates 24/7 and recycles water for vehicle and motorized equipment cleaning. Quarterly maintenance obligations include replacing filters, cleaning strainers and pumps, adjusting conveyor tension, conducting operational tests, and providing training to government personnel on system operations and monthly maintenance procedures.
The contractor must provide all necessary labor, equipment, parts, and materials to complete manufacturer-recommended maintenance tasks. Specific quarterly requirements include washing down the rack, rotating filter socks, checking chain tension, cleaning recovery screens, emptying conveyor hoppers as needed, checking filter pressure switches, cleaning surface and motor cooling fans, and greasing pumps, motors, and conveyor bearings. At the conclusion of each quarterly visit, the contractor must submit a detailed checklist/report documenting completed maintenance tasks and noting any potential issues requiring additional maintenance or repairs. The maintenance will be performed at the Ground Transportation Wash Facility on Louisiana Avenue at Tyndall AFB.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Wage Determination 2015-4559 Rev 28.pdf | ||
| Solicitation - FA481925Q0008.pdf | ||
| Performance Work Statement .pdf | ||
| Wage Determination 2015-4559 Rev 28.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT
FOR
RTS 3000 WASH RACK SYSTEM
QUARTERLY PREVENTATIVE MAINTENANCE
05 February 2025
1. Background: The 325 Logistics Readiness Squadron (LRS) at Tyndall AFB, FL uses a wash rack system that includes the Riveer Treatment System (RTS-3000) filtration system for routine vehicle and motorized equipment maintenance. The RTS-3000 system operates 24/7 and recycles water to reduce usage. It is an automated, mid-sized wash water treatment system suitable for handling moderate grease and dirt.
Quarterly preventive maintenance and training is required to be performed by qualified contractor personnel to ensure system functionality.
2. Quarterly Maintenance Tasks:
The contractor shall perform the following quarterly preventive maintenance tasks on the Riveer Treatment System (RTS-3000) wash rack system in accordance with the manufacturer’s recommended maintenance requirements:
1. Provide and replace absolute filter, skimmer filter, and backwash filters
2. Clean all strainers, grease pumps, and bearings
3. Adjust the conveyor tension
4. Conduct an operational test to ensure the system is functioning correctly
The contractor shall provide all required labor, equipment, parts, materials, and consumables required to perform all manufacturer’s recommended maintenance tasks.
Training:
The contractor shall provide training on proper system operations and monthly maintenance procedures to designated Government personnel during their quarterly preventive maintenance visits.
3. Deliverables:
1. The contractor shall submit a checklist/report of all preventive maintenance tasks completed for Government review at the conclusion of each quarterly preventive maintenance visit. At a minimum, the checklist/report shall detail all maintenance tasks completed and annotate any issues or concerns that may necessitate additional maintenance or repair actions.
4. Place of Performance
Ground Transportation Wash Facility Louisiana Ave, Tyndall AFB, FL 32403
5. Supplies and equipment: No equipment will be provided to the company. The contractor shall bring their own tools and equipment for the maintenance or have the means to acquire the tools and equipment needed on their own.
6. RTS3000 Wash Rack Checklist
6.1 Supplemental
The following items are also quarterly tasks
• Wash down the rack and clean out the trough completely.
• Rotate the pig sock filter
• Check chain tension
• Use blowout to cleanout recovery screen
• Empty conveyor hopper, if necessary
• Check the absolute filter pressure switch.
• Clean all surfaces, including blowing out pump motor cooling fans
• Grease all pumps, electric motors (if applicable), and conveyor bearings
• Provide remedial training on system operations and monthly maintenance.
7. Wash Rack Photos
Wash Rack Ramp
Model Information
Water Tank
Pressure Washer System
RTS3000 System Panel