Questions and Answers 5-1-2024.pdf
PDF 250 KB Posted
- Solicitation number
- FA481924QA038
About this file
This document contains the Questions and Answers (Q&A) related to Solicitation Number FA481924QA038 for Asphalt & Coats - Tyndall Air Force Base - Silver Flag Runway. The key details are:
The solicitation is for the delivery and application of asphalt, tack coat, and prime coat over an approximately 11,666.7 square yard area at Tyndall Air Force Base. The required thickness is 5 inches total, applied in two 2.5-inch lifts. The contractor will be responsible for delivering the materials at the correct temperature and quantity, and applying both the tack and prime coats on different coordinated dates. This is a 100% Small Business Set-Aside with a NAICS code of 324121 and a 500-employee size standard. Quotes are due by 10 May 2024 at 2:00 PM CST and must be submitted electronically. Pricing is to remain in effect until 15 August 2024.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUESTIONS - FA481924QA038
5/1/2024
-Q: Do you need the Asphalt delivered AND applied?
A: Asphalt just needs to be delivered at the correct temperature and quantity as stated on PWS-Attachment. The 823RHS will apply the Asphalt once coordinated and delivered.
-Q: How many coats do you need?
A: We need 2 coats applied by awarded contractor (PRIME & BASE) on different dates.
11, 666.7sq.yds. for PRIME & 11, 666.7sq.yds. for TACK.
-Q: Do you need the TACK & PRIME COATS delivered & applied by the contractor?
A: Yes, they will need to be delivered & applied by awarded contractor at different coordinated dates, depending on project progress.
-Q: Is there a thickness on the asphalt course? The math on the 11,666 SY would be 6.5” which would have to be laid in three li�s, so your tack quan�ty would be double?
A: The Asphalt thickness is 5 inches total. We will be doing 2 lifts 2.5 inches a piece - please see attachments.
-Q: Will the repairs be in mul�ple areas or one large area?
A: One large area - please see attachments.