Signed RFI Q and A - B9545 - XLWU 204011 - 3 Sept 2020.pdf

PDF 129 KB Posted

Attached to
B9545 Demolition/Repair
Solicitation number
FA481920R0023
Issued by

View the file

Other files

File Type Posted
Q and A Pt. 3.docx DOCX document
RFI B9545.XLS XLS spreadsheet
RFI B9545.pdf PDF
Solicitation - FA481920R0023.pdf PDF
B9545 Wage Determination.pdf PDF
Appendix A - Statement of Work.pdf PDF
Appendix B - Photo Overview.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

3 Sept 2020

Subject: Contractor RFI, for Building 9545, XLWU 204011---

1, Is the bridge located near the site rated at 6 tons?

There is an alternative route, without bridge.

2, Is there another route leading to the location?

Yes…government will provide.

3, It appeared that at least 2 corners of the existing slab, had broken corners. Would total slab removal be an option?

Not required, repair… The new footer is meant to support the new structure… 4, In the SOW regarding the new roof, its showing a flat roof? I believe that metal roofing requires at least a 3:12 pitch. Do you have any additional information on the roof ?

No specific details or requirements on roof other than meeting SOW wind load requirements.

5, On the sketch provided in the Solicitation,0 there is a boxed off area at the man door. Do we need to add for interior framing? If so, what type of wall finish? Plywood?

The box off area was an office, no office required.

6. Will it be a requirement to fill the block cells (Walls)?

The walls most meet the wind load requirements IAW SOW – see Florida Building Codes and UFCs.

7. Are the roll up doors manual or auto? Insulated? Do they require glass in them?

Manual roll up doors.

8. Will we be responsible for the design of the footers?

Yes, all designs.

9. Is there a quantity of lights required inside the building?

50 foot candles – of uniform lighting…

10. Are we responsible for tying into the generator?

Yes, bring your own power – and part of the SOW is to have a point of connection for external generator.

11. Was there existing water and power and will there be repairs if so and do we tie into it?

Must bring you own water and electric.

12. What are the interior room walls made of (on drawings), and what are the dimensions?

No interior office required.

13. Does the roof require insulation?

No, the space is unconditioned.

14. What is the roofing system to be made of, wood or steel?

I believe in the SOW the roof structure frame, must be steel/metal… No wood trusses.

15. Does ceiling require OSB, plywood, or will an open rafter design be fine?

Open ceiling…

Important: Replace metal structure with block, and paint inside and outside, reference base colors for roof, interior, and exterior.

Gil Walker Base Electrical and Project Engineer 325th CES/CENMP 850 628-5149