RFI B9545.XLS
XLS spreadsheet 14 KB Posted
- Attached to
- B9545 Demolition/Repair
- Solicitation number
- FA481920R0023
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Q and A Pt. 3.docx | DOCX document | |
| Signed RFI Q and A - B9545 - XLWU 204011 - 3 Sept 2020.pdf | ||
| RFI B9545.pdf | ||
| Solicitation - FA481920R0023.pdf | ||
| B9545 Wage Determination.pdf | ||
| Appendix A - Statement of Work.pdf | ||
| Appendix B - Photo Overview.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PPIF
| Pre Proposal Inquiry Form | Solicitation No: FA48192-20-R-0023 |
| Offeror Name: Dominguez Design-Build, Inc. | |
| Address: 4340 Devereux Dr Pensacola, FL 32504 | |
| Phone Number: (850) 776-9618 | B9545 Rebuild |
| Email: ben@ddbconstruct.com; shawn@ddbconstruct.com |
| Question No. | Reference (Sect/Para/Page) | Question | Government Response |
| 1 | SOW | What type of fuel will the government require for the generator? | The contractor is not to supply a generator with the project, just a outlet for the connection of a generator… |
| 2 | SOW | What is the required run time for the generator? | The contractor is not to supply a generator with the project, just a outlet for the connection of a generator… |
| 3 | SOW | What is the required capacity for the generator? | The contractor is not to supply a generator with the project, just a outlet for the connection of a generator… |
| 4 | SOW | Is the fuel tank for the generator to be above ground? | The contractor is not to supply a generator with the project, just a outlet for the connection of a generator… |
| 5 | SOW | What is the weight capacity of the existing bridge? | The is an alternative route. |
| 6 | SOW | Is there another way to access the site not using the existing bridge? | The is an alternative route. |
| 7 | SOW | How far from the building are we to clear debris? Can a site map showing this be provided? | Suggest another site visit, there is some building debris in the brush around the site that needs to be removed. |
| 8 | SOW | Is there an asbestos report for this building? | I'm not aware of asbestos. |
| 9 | SOW | Will flooring or sealing be required? | no |
| 10 | SOW | Is the exterior cmu wall to be painted? | yes |
| 11 | SOW | Is the interior cmu wall to be painted? | yes |
| 12 | SOW | Is the interior to have a drop ceiling or be open to the roof structure? | Open to the roof structure. |
| 13 | SOW | Are containment booms in the water going to be a requirement? | At this time there is no requirement -- the project is not on the water… erosion control minimum… |
| 14 | |||