RFI B9545.XLS

XLS spreadsheet 14 KB Posted

Attached to
B9545 Demolition/Repair
Solicitation number
FA481920R0023
Issued by

View the file

Other files

File Type Posted
Q and A Pt. 3.docx DOCX document
Signed RFI Q and A - B9545 - XLWU 204011 - 3 Sept 2020.pdf PDF
RFI B9545.pdf PDF
Solicitation - FA481920R0023.pdf PDF
B9545 Wage Determination.pdf PDF
Appendix A - Statement of Work.pdf PDF
Appendix B - Photo Overview.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PPIF

Pre Proposal Inquiry FormSolicitation No: FA48192-20-R-0023
Offeror Name: Dominguez Design-Build, Inc.
Address: 4340 Devereux Dr Pensacola, FL 32504
Phone Number: (850) 776-9618B9545 Rebuild
Email: ben@ddbconstruct.com; shawn@ddbconstruct.com
Question No.Reference (Sect/Para/Page)QuestionGovernment Response
1SOWWhat type of fuel will the government require for the generator?The contractor is not to supply a generator with the project, just a outlet for the connection of a generator…
2SOWWhat is the required run time for the generator?The contractor is not to supply a generator with the project, just a outlet for the connection of a generator…
3SOWWhat is the required capacity for the generator?The contractor is not to supply a generator with the project, just a outlet for the connection of a generator…
4SOWIs the fuel tank for the generator to be above ground?The contractor is not to supply a generator with the project, just a outlet for the connection of a generator…
5SOWWhat is the weight capacity of the existing bridge?The is an alternative route.
6SOWIs there another way to access the site not using the existing bridge?The is an alternative route.
7SOWHow far from the building are we to clear debris? Can a site map showing this be provided?Suggest another site visit, there is some building debris in the brush around the site that needs to be removed.
8SOWIs there an asbestos report for this building?I'm not aware of asbestos.
9SOWWill flooring or sealing be required?no
10SOWIs the exterior cmu wall to be painted?yes
11SOWIs the interior cmu wall to be painted?yes
12SOWIs the interior to have a drop ceiling or be open to the roof structure?Open to the roof structure.
13SOWAre containment booms in the water going to be a requirement?At this time there is no requirement -- the project is not on the water… erosion control minimum…