Q and A Pt. 3.docx

DOCX document 13 KB Posted

Attached to
B9545 Demolition/Repair
Solicitation number
FA481920R0023
Issued by

View the file

Other files

File Type Posted
Signed RFI Q and A - B9545 - XLWU 204011 - 3 Sept 2020.pdf PDF
RFI B9545.XLS XLS spreadsheet
RFI B9545.pdf PDF
Solicitation - FA481920R0023.pdf PDF
B9545 Wage Determination.pdf PDF
Appendix A - Statement of Work.pdf PDF
Appendix B - Photo Overview.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Q&A Pt. 3 – B9545 – FA481920R0023

1) General conditions - 6.9 On-Site Field Oversite only mentions general requirements. What is the expectation of the customer? – Three separate site Superintendent, SSHO, and QCM or can a single person be Superintendent/SSHO/QCM?

This is a small job, there must be a supervisor (1) overseeing the work, safety, and scheduling… The QA (inspection of the work) must be performed by their license subcontractor supervisor (must be experience qualified)….

2) Page 9 of 28 Roofing: calls for a flat built up roof with structural metal decking; however, some of the QA seem to think this is a metal roof-Can you confirm Built -up is correct

“suggest metal roof”, roofs must meet Miami Dada code wind standards, the contractor must include in their proposal the type of roof.

3) The SOW is requesting 12’x15’ roll-ups but the eave height requested is only 14’-Canyou confirm correct door size or eave height?

The estimate height of the building is 14’ – The doors are 15’ Wide and 12’ tall.