Q and A Pt. 3.docx
DOCX document 13 KB Posted
- Attached to
- B9545 Demolition/Repair
- Solicitation number
- FA481920R0023
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Signed RFI Q and A - B9545 - XLWU 204011 - 3 Sept 2020.pdf | ||
| RFI B9545.XLS | XLS spreadsheet | |
| RFI B9545.pdf | ||
| Solicitation - FA481920R0023.pdf | ||
| B9545 Wage Determination.pdf | ||
| Appendix A - Statement of Work.pdf | ||
| Appendix B - Photo Overview.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Q&A Pt. 3 – B9545 – FA481920R0023
1) General conditions - 6.9 On-Site Field Oversite only mentions general requirements. What is the expectation of the customer? – Three separate site Superintendent, SSHO, and QCM or can a single person be Superintendent/SSHO/QCM?
This is a small job, there must be a supervisor (1) overseeing the work, safety, and scheduling… The QA (inspection of the work) must be performed by their license subcontractor supervisor (must be experience qualified)….
2) Page 9 of 28 Roofing: calls for a flat built up roof with structural metal decking; however, some of the QA seem to think this is a metal roof-Can you confirm Built -up is correct
“suggest metal roof”, roofs must meet Miami Dada code wind standards, the contractor must include in their proposal the type of roof.
3) The SOW is requesting 12’x15’ roll-ups but the eave height requested is only 14’-Canyou confirm correct door size or eave height?
The estimate height of the building is 14’ – The doors are 15’ Wide and 12’ tall.