Attachment_2_-_DRAFT_Concept_Drawings.pdf

PDF 3 MB Posted

Attached to
Repair Shell Island Docks Federal contract opportunity
Solicitation number
FA4819-18-B-7002
Issued by
Department of the Air Force Air Combat Command

About this file

DRAFT Concept Drawings for the Repair Shell Island Docks requirement at Tyndall AFB

View the file

Other files for this federal contract opportunity

Other files attached to Repair Shell Island Docks, newest first.
File Type Posted
Amendment_3.pdf PDF
FA481918B7002_Amendment_2.pdf PDF
FA481918B7002_Amendment_1.pdf PDF
Attachment_07_AF3065.pdf PDF
Attachment_03_Pricing_Schedule_Repair_Shell_Island_Dock.pdf PDF
Attachment_08_AF_Form_66.pdf PDF
Attachment_02_Drawing_Repair_Shell_Island_Dock.pdf PDF
Attachment_05_AF_Form_3000.pdf PDF
Attachment_06_AF_3064.pdf PDF
Attachment_01_SOW_Repair_Shell_Island_Dock.pdf PDF
FA481918B7002.pdf PDF
Attachment_04_Wage_Determination.pdf PDF
Attachment_1_-_DRAFT_Statement_of_Work.pdf PDF
Pre-Solicitation_Notice_-_Repair_Shell_Island_Dock.pdf PDF
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT LOCATION

LOCATION MAP

mh

February 12, 2018 0 0.6 1.20.3 mi

0 1 20.5 km

1:36,112

Copyright 2016 LOCATION - 1 of 1

XLWU 18-1013 REPAIR SHELL ISLAND DOCK, B73000

mh

0 0.01 0.020.005 mi

0 0.02 0.040.01 km

1:564

Copyright 2016

BASE BID

BASE BID - 1 of 3

February 12, 2018

CONCEPT DRAWINGS

** See Statement of Work and provided details for more information

1515703183E Callout + 148 FT DOCK (2.3.1 a. DOCK)

- COMPLETE HORIZONTAL STRUCTURE REPLACEMENT

- PILES TO REMAIN

- UTILIZE STAINLESS STEEL FASTENING HARDWARE

- INSTALL NEW DOCKING HARDWARE

1515703183E Polygonal Line

1515703183E Callout 15 FT + 15 FT BOARDWALK (2.3.1 b. C-SHAPED BOARDWALK)

- DEMO & RECONSTRUCT TO ACCOMPLISH THE FOLLOWING:

- SHORTEN LENGTH TO ACCOMODATE USE WITH NORMAL TIDES

- INSTALL NEW STAIR WITH RAILING

- INSTALL RAILING / HAND RAIL

- RAILING SHALL HAVE COMPOSITE TOP PLATE

- UTILIZE STAINLESS STEEL FASTENERING HARDWARE

- SUPPORTING PILES / POSTS SHALL HAVE MINIMUM 4' EMBEDMENT

- MINIMUM DIMENSION 4"X4" FOR SUPPORTING PILES / POSTS

- VALUE ENGINEERING WITH ALTERNATE LAYOUT WILL BE CONSIDERED

1515703183E Polygonal Line

1515703183E Polygon

1515703183E Callout

BARGE - STAGING/LAYDOWN AREAS

1515703183E Polygonal Line

1515703183E Line

1515703183E Polygonal Line

1515703183E Callout 90 FT BOARDWALK (2.3.1 b. C-SHAPED BOARDWALK)

- REMOVE EXISTING TOP PLATE FOR ALL RAILING

- INSTALL COMPOSITE TOP PLATE FOR ALL RAILING

- UTILIZE STAINLESS STEEL FASTENERING HARDWARE

0 0.025 0.050.0125 mi

0 0.04 0.080.02 km

1:1,128

Copyright 2016

BASE BID

BASE BID - 2 of 3

February 12, 2018

CONCEPT DRAWINGS

** See Statement of Work and provided details for more information

1515703183E Callout + 465 FT BOARD WALK (2.3.1 c. DUNE WALKOVER-NORTH)

- COMPLETE HORIZONTAL STRUCTURE REPLACEMENT TO INCLUDE RAILING

- PILES TO REMAIN (MAY BE MODIFIED AS REQUIRED)

- RAILING TO HAVE COMPOSITE TOP PLATE

- STAINLESS STEEL SCREWS UTILIZED

- STAINLESS STEEL FASTENERS / HARDWARE UTILIZED

- MINIMUM DIMENSION 4"X4" FOR SUPPORTING PILES / RAIL POSTS

1515703183E Polygon

0 0.01 0.020.005 mi

0 0.02 0.040.01 km

1:564

Copyright 2016

BASE BID

BASE BID - 3 of 3

February 12, 2018

CONCEPT DRAWINGS

** See Statement of Work and provided details for more information

1515703183E Polygon

1515703183E Callout + 20 FT BOARD WALK (2.3.1 d. DUNE WALKOVER-SOUTH)

- COMPLETE HORIZONTAL STRUCTURE REPLACEMENT TO INCLUDE RAILING

- DEMO EXISTING PILES & INSTALL NEW PILES AS REQUIRED

- STAINLESS STEEL SCREWS UTILIZED

- STAINLESS STEEL FASTENERS / HARDWARE UTILIZED

- MINIMUM DIMENSION 4"X4" FOR SUPPORTING PILES / POSTS

- CONSTRUCT NEW STAIR / RAMP AND HAND RAILS AT WALKOVER END

- RAILING TO HAVE COMPOSITE TOP PLATE

File details come from the government source that posted it.