Attachment_02_Drawing_Repair_Shell_Island_Dock.pdf
PDF 3 MB Posted
- Attached to
- Repair Shell Island Docks Federal contract opportunity
- Solicitation number
- FA4819-18-B-7002
About this file
Drawings
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_3.pdf | ||
| FA481918B7002_Amendment_2.pdf | ||
| FA481918B7002_Amendment_1.pdf | ||
| Attachment_07_AF3065.pdf | ||
| Attachment_03_Pricing_Schedule_Repair_Shell_Island_Dock.pdf | ||
| FA481918B7002.pdf | ||
| Attachment_04_Wage_Determination.pdf | ||
| Attachment_05_AF_Form_3000.pdf | ||
| Attachment_06_AF_3064.pdf | ||
| Attachment_01_SOW_Repair_Shell_Island_Dock.pdf | ||
| Attachment_08_AF_Form_66.pdf | ||
| Attachment_1_-_DRAFT_Statement_of_Work.pdf | ||
| Attachment_2_-_DRAFT_Concept_Drawings.pdf | ||
| Pre-Solicitation_Notice_-_Repair_Shell_Island_Dock.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT LOCATION
LOCATION MAP
mh
February 12, 2018 0 0.6 1.20.3 mi
0 1 20.5 km
1:36,112
Copyright 2016 LOCATION - 1 of 1
XLWU 18-1013 REPAIR SHELL ISLAND DOCK, B73000
mh
0 0.01 0.020.005 mi
0 0.02 0.040.01 km
1:564
Copyright 2016
BASE BID
BASE BID - 1 of 3
February 12, 2018
CONCEPT DRAWINGS
** See Statement of Work and provided details for more information
1515703183E Callout + 148 FT DOCK (2.3.1 a. DOCK)
- COMPLETE HORIZONTAL STRUCTURE REPLACEMENT
- PILES TO REMAIN
- UTILIZE STAINLESS STEEL FASTENING HARDWARE
- INSTALL NEW DOCKING HARDWARE
1515703183E Polygonal Line
1515703183E Callout 15 FT + 15 FT BOARDWALK (2.3.1 b. C-SHAPED BOARDWALK)
- DEMO & RECONSTRUCT TO ACCOMPLISH THE FOLLOWING:
- SHORTEN LENGTH TO ACCOMODATE USE WITH NORMAL TIDES
- INSTALL NEW STAIR WITH RAILING
- INSTALL RAILING / HAND RAIL
- RAILING SHALL HAVE COMPOSITE TOP PLATE
- UTILIZE STAINLESS STEEL FASTENERING HARDWARE
- SUPPORTING PILES / POSTS SHALL HAVE MINIMUM 4' EMBEDMENT
- MINIMUM DIMENSION 4"X4" FOR SUPPORTING PILES / POSTS
- VALUE ENGINEERING WITH ALTERNATE LAYOUT WILL BE CONSIDERED
1515703183E Polygonal Line
1515703183E Polygon
1515703183E Callout
BARGE - STAGING/LAYDOWN AREAS
1515703183E Polygonal Line
1515703183E Line
1515703183E Polygonal Line
1515703183E Callout 90 FT BOARDWALK (2.3.1 b. C-SHAPED BOARDWALK)
- REMOVE EXISTING TOP PLATE FOR ALL RAILING
- INSTALL COMPOSITE TOP PLATE FOR ALL RAILING
- UTILIZE STAINLESS STEEL FASTENERING HARDWARE
0 0.025 0.050.0125 mi
0 0.04 0.080.02 km
1:1,128
Copyright 2016
BASE BID
BASE BID - 2 of 3
February 12, 2018
CONCEPT DRAWINGS
** See Statement of Work and provided details for more information
1515703183E Callout + 465 FT BOARD WALK (2.3.1 c. DUNE WALKOVER-NORTH)
- COMPLETE HORIZONTAL STRUCTURE REPLACEMENT TO INCLUDE RAILING
- PILES TO REMAIN (MAY BE MODIFIED AS REQUIRED)
- RAILING TO HAVE COMPOSITE TOP PLATE
- STAINLESS STEEL SCREWS UTILIZED
- STAINLESS STEEL FASTENERS / HARDWARE UTILIZED
- MINIMUM DIMENSION 4"X4" FOR SUPPORTING PILES / RAIL POSTS
1515703183E Polygon
0 0.01 0.020.005 mi
0 0.02 0.040.01 km
1:564
Copyright 2016
BASE BID
BASE BID - 3 of 3
February 12, 2018
CONCEPT DRAWINGS
** See Statement of Work and provided details for more information
1515703183E Polygon
1515703183E Callout + 20 FT BOARD WALK (2.3.1 d. DUNE WALKOVER-SOUTH)
- COMPLETE HORIZONTAL STRUCTURE REPLACEMENT TO INCLUDE RAILING
- DEMO EXISTING PILES & INSTALL NEW PILES AS REQUIRED
- STAINLESS STEEL SCREWS UTILIZED
- STAINLESS STEEL FASTENERS / HARDWARE UTILIZED
- MINIMUM DIMENSION 4"X4" FOR SUPPORTING PILES / POSTS
- CONSTRUCT NEW STAIR / RAMP AND HAND RAILS AT WALKOVER END
- RAILING TO HAVE COMPOSITE TOP PLATE