Attachment_03_Pricing_Schedule_Repair_Shell_Island_Dock.pdf

PDF 232 KB Posted

Attached to
Repair Shell Island Docks Federal contract opportunity
Solicitation number
FA4819-18-B-7002
Issued by
Department of the Air Force Air Combat Command

About this file

Pricing Schedule

View the file

Other files for this federal contract opportunity

Other files attached to Repair Shell Island Docks, newest first.
File Type Posted
Amendment_3.pdf PDF
FA481918B7002_Amendment_2.pdf PDF
FA481918B7002_Amendment_1.pdf PDF
Attachment_07_AF3065.pdf PDF
FA481918B7002.pdf PDF
Attachment_04_Wage_Determination.pdf PDF
Attachment_05_AF_Form_3000.pdf PDF
Attachment_06_AF_3064.pdf PDF
Attachment_01_SOW_Repair_Shell_Island_Dock.pdf PDF
Attachment_08_AF_Form_66.pdf PDF
Attachment_02_Drawing_Repair_Shell_Island_Dock.pdf PDF
Attachment_1_-_DRAFT_Statement_of_Work.pdf PDF
Attachment_2_-_DRAFT_Concept_Drawings.pdf PDF
Pre-Solicitation_Notice_-_Repair_Shell_Island_Dock.pdf PDF
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACTOR PRICING SCHEDULE XLWU 18‐1013

Repair Shell Island Dock, B73000

2/16/2018

SUB TOT:

LINE ITEM UNIT QUANTITY UNIT COST TOTAL Notes

Mobilization

/Demobilization JOB

2 Equipment Rental JOB

3 Super Intendence DAY

SUB TOT:

LINE ITEM UNIT QUANTITY UNIT COST TOTAL Notes a.1 Deck (Walking Surface)

SF

a.2 Deck Supporting Structure

SF

SUB TOT:

LINE ITEM UNIT QUANTITY UNIT COST TOTAL Notes b.1 Handrail Top Plate

LF

b.2 Existing Stairs

EA

b.3 Deck (Walking Surface)

SF

b.4 Deck Supporting Structure

SF

SUB TOT:

LINE ITEM UNIT QUANTITY UNIT COST TOTAL Notes c.1 Handrail / Railing

LF

c.2 Deck (Walking Surface)

SF

c.3 Deck Supporting Structure

SF

All costs associated with providing oversite during the performance of on site activities; layout, demolition, construction.

2.3.1 (c.) DUNE WALKOVER ‐ NORTH ‐ DEMOLITION

DESCRIPTION

Removal of the existing railing to include posts and associated hardware.

Removal of the deck boards and associated harware.

Removal of the deck supporting structure and associated harware (piles to remain).

DESCRIPTION

Removal of the existing handrail top plate.

Removal of the stairs, railing, posts/piles and associated harware to accommodate new stair construction at the east and west ends.

Removal of the deck supporting structure and associated harware to include piles/posts as needed to accommodate new construction.

Removal of the deck boards and associated harware.

Removal of the deck boards and various associated harware of the existing dock.

Removal of the deck supporting structure and associated harware

(framing). Piles to remain.

2.3.1 (b.) C‐SHAPED BOARDWALK ‐ DEMOLITION

DEMOLITION SECTION SUB TOTAL:

2.3.1 (a.) DOCK ‐ DEMOLITION

DESCRIPTION

2.3.1 GENERAL CONDITIONS SECTION SUB TOTAL:

0.1 GENERAL CONDITIONS

DESCRIPTION

A mobilization cost will be given in order to get the contractor set up on Tyndall

AFB. This shall include, but may not be limited to the fees associated in moving equipment, material, and personnel to this area. Additionally, this shall include any traffic control to accomplish this project.

All costs associated with equipment rental to accomplish the work.

Contractor to provide itemized list of equipment and associated cost.

PRICING SCHEDULE 1 of 3

2/16/2018

SUB TOT:

LINE ITEM UNIT QUANTITY UNIT COST TOTAL Notes d.1 Handrail / Railing

LF

d.2 Existing Stairs

EA

d.3 Deck (Walking Surface)

SF

d.4 Deck Supporting Structure

SF

SUB TOT:

LINE ITEM UNIT QUANTITY UNIT COST TOTAL Notes a.1 Deck Supporting Structure

SF

a.2 Deck (Walking Surface)

SF

a.3 Docking Hardware

LS

SUB TOT:

LINE ITEM UNIT QUANTITY UNIT COST TOTAL Notes b.1 Deck Supporting Structure

SF

b.2 Stairs

EA

b.3 Deck (Walking Surface)

SF

b.4 Handrail / Railing

LF

b.5 Composite Top Plate

LF

SUB TOT:

LINE ITEM UNIT QUANTITY UNIT COST TOTAL Notes c.1 Deck Supporting Structure

SF

c.2 Deck (Walking Surface)

SF

c.3 Handrail / Railing

LF

c.4 Composite Top Plate

LF

Install railing in accordance with the

Contract Documents.

Install composite top plate at railing in accordance with the Contract

Documents.

Install new decking in accordance with the Contract Documents.

Install railing in accordance with the

Contract Documents.

2.3.1 (a.) DOCK ‐ CONSTRUCTION

DESCRIPTION

Construct new deck supporting structure in accordance with the Contract

Documents.

Install new docking hardware in accordance with the Contract

Documents. Ex. Bumpers, tie down cleats, etc.

2.3.1 (d.) DUNE WALKOVER ‐ SOUTH ‐ DEMOLITION

DESCRIPTION

Removal of the existing railing to include posts and associated hardware.

Install composite top plate at railing in accordance with the Contract

Documents.

DESCRIPTION

Construct new deck supporting structure in accordance with the Contract

Documents.

Install new decking in accordance with the Contract Documents.

2.3.1 (c.) DUNE WALKOVER ‐ NORTH ‐ CONSTRUCTION

DESCRIPTION

Construct new deck supporting structure in accordance with the Contract

Documents.

Construct new access stairs in accordance with the Contract

Documents.

2.3.1 (b.) C‐SHAPED BOARDWALK ‐ CONSTRUCTION

Install new decking in accordance with the Contract Documents.

SECTION SUB TOTAL:CONSTRUCTION

Removal of the stairs, railing, posts/piles and associated harware to accommodate new stair construction.

Removal of the deck supporting structure to include piles and associated harware.

Removal of the deck boards and associated harware.

PRICING SCHEDULE 2 of 3

2/16/2018

SUB TOT:

LINE ITEM UNIT QUANTITY UNIT COST TOTAL Notes d.1 Deck Supporting Structure

SF

d.2 Stairs

EA

d.3 Deck (Walking Surface)

SF

d.4 Handrail / Railing

LF

d.5 Composite Top Plate

LF

SUB TOT:

LINE ITEM % TOTAL Notes

001 Overhead ‐$

002 Profit ‐$

003 Bond ‐$

PROJECT SUBTOTAL (General Conditions + Demolition + Construction) =

CONTRACTOR PERIOD OF PERFORMANCE = Days

2.3.1 OVERHEAD, PROFIT, BOND

DESCRIPTION

Overhead Costs

Profit

Install railing in accordance with the

Contract Documents.

2.3.1 (d.) DUNE WALKOVER ‐ SOUTH ‐ CONSTRUCTION

DESCRIPTION

Construct new deck supporting structure in accordance with the Contract

Documents.

Construct new access stairs in accordance with the Contract

Documents.

Install new decking in accordance with the Contract Documents.

Actual Bond

PROJECT TOTAL ESTIMATE (Overhead, Profit, Bond + Project Subtotal) =

Install composite top plate at railing in accordance with the Contract

Documents.

PRICING SCHEDULE 3 of 3

2/16/2018

2.3.1 EQUIPMENT RENTAL ( ITEMIZED LIST ) SUB TOT:

UNIT QUANTITY QUANTITY UNIT COST TOTAL

ex. MONTH 1 1 2,180.00 2,180.00$

1 ‐$

2 ‐$

3 ‐$

4 ‐$

5 ‐$

6 ‐$

7 ‐$

8 ‐$

9 ‐$

10 ‐$

11 ‐$

12 ‐$

13 ‐$

14 ‐$

15 ‐$

16 ‐$

17 ‐$

18 ‐$

19 ‐$

20 ‐$

OTHER PROJECT NOTES FOR BID

UNIT QUANTITY QUANTITY UNIT COST TOTAL

ex. MONTH 1 1 2,180.00 2,180.00$

1 ‐$

2 ‐$

3 ‐$

4 ‐$

5 ‐$

6 ‐$

7 ‐$

8 ‐$

9 ‐$

10 ‐$

11 ‐$

12 ‐$

13 ‐$

14 ‐$

15 ‐$

16 ‐$

17 ‐$

18 ‐$

19 ‐$

20 ‐$

RENTAL DESCRIPTION

(Example) 40' Straight Boom Manlift (Sunbelt Rentals)

SUB TOT

DESCRIPTION

(Example) 40' Straight Boom Manlift (Sunbelt Rentals)

Note: Provide additional pages as needed Support Pricing Schedule

______ of _____