Attachment_03_Pricing_Schedule_Repair_Shell_Island_Dock.pdf
PDF 232 KB Posted
- Attached to
- Repair Shell Island Docks Federal contract opportunity
- Solicitation number
- FA4819-18-B-7002
About this file
Pricing Schedule
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_3.pdf | ||
| FA481918B7002_Amendment_2.pdf | ||
| FA481918B7002_Amendment_1.pdf | ||
| Attachment_07_AF3065.pdf | ||
| FA481918B7002.pdf | ||
| Attachment_04_Wage_Determination.pdf | ||
| Attachment_05_AF_Form_3000.pdf | ||
| Attachment_06_AF_3064.pdf | ||
| Attachment_01_SOW_Repair_Shell_Island_Dock.pdf | ||
| Attachment_08_AF_Form_66.pdf | ||
| Attachment_02_Drawing_Repair_Shell_Island_Dock.pdf | ||
| Attachment_1_-_DRAFT_Statement_of_Work.pdf | ||
| Attachment_2_-_DRAFT_Concept_Drawings.pdf | ||
| Pre-Solicitation_Notice_-_Repair_Shell_Island_Dock.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACTOR PRICING SCHEDULE XLWU 18‐1013
Repair Shell Island Dock, B73000
2/16/2018
SUB TOT:
LINE ITEM UNIT QUANTITY UNIT COST TOTAL Notes
Mobilization
/Demobilization JOB
2 Equipment Rental JOB
3 Super Intendence DAY
SUB TOT:
LINE ITEM UNIT QUANTITY UNIT COST TOTAL Notes a.1 Deck (Walking Surface)
SF
a.2 Deck Supporting Structure
SF
SUB TOT:
LINE ITEM UNIT QUANTITY UNIT COST TOTAL Notes b.1 Handrail Top Plate
LF
b.2 Existing Stairs
EA
b.3 Deck (Walking Surface)
SF
b.4 Deck Supporting Structure
SF
SUB TOT:
LINE ITEM UNIT QUANTITY UNIT COST TOTAL Notes c.1 Handrail / Railing
LF
c.2 Deck (Walking Surface)
SF
c.3 Deck Supporting Structure
SF
All costs associated with providing oversite during the performance of on site activities; layout, demolition, construction.
2.3.1 (c.) DUNE WALKOVER ‐ NORTH ‐ DEMOLITION
DESCRIPTION
Removal of the existing railing to include posts and associated hardware.
Removal of the deck boards and associated harware.
Removal of the deck supporting structure and associated harware (piles to remain).
DESCRIPTION
Removal of the existing handrail top plate.
Removal of the stairs, railing, posts/piles and associated harware to accommodate new stair construction at the east and west ends.
Removal of the deck supporting structure and associated harware to include piles/posts as needed to accommodate new construction.
Removal of the deck boards and associated harware.
Removal of the deck boards and various associated harware of the existing dock.
Removal of the deck supporting structure and associated harware
(framing). Piles to remain.
2.3.1 (b.) C‐SHAPED BOARDWALK ‐ DEMOLITION
DEMOLITION SECTION SUB TOTAL:
2.3.1 (a.) DOCK ‐ DEMOLITION
DESCRIPTION
2.3.1 GENERAL CONDITIONS SECTION SUB TOTAL:
0.1 GENERAL CONDITIONS
DESCRIPTION
A mobilization cost will be given in order to get the contractor set up on Tyndall
AFB. This shall include, but may not be limited to the fees associated in moving equipment, material, and personnel to this area. Additionally, this shall include any traffic control to accomplish this project.
All costs associated with equipment rental to accomplish the work.
Contractor to provide itemized list of equipment and associated cost.
PRICING SCHEDULE 1 of 3
2/16/2018
SUB TOT:
LINE ITEM UNIT QUANTITY UNIT COST TOTAL Notes d.1 Handrail / Railing
LF
d.2 Existing Stairs
EA
d.3 Deck (Walking Surface)
SF
d.4 Deck Supporting Structure
SF
SUB TOT:
LINE ITEM UNIT QUANTITY UNIT COST TOTAL Notes a.1 Deck Supporting Structure
SF
a.2 Deck (Walking Surface)
SF
a.3 Docking Hardware
LS
SUB TOT:
LINE ITEM UNIT QUANTITY UNIT COST TOTAL Notes b.1 Deck Supporting Structure
SF
b.2 Stairs
EA
b.3 Deck (Walking Surface)
SF
b.4 Handrail / Railing
LF
b.5 Composite Top Plate
LF
SUB TOT:
LINE ITEM UNIT QUANTITY UNIT COST TOTAL Notes c.1 Deck Supporting Structure
SF
c.2 Deck (Walking Surface)
SF
c.3 Handrail / Railing
LF
c.4 Composite Top Plate
LF
Install railing in accordance with the
Contract Documents.
Install composite top plate at railing in accordance with the Contract
Documents.
Install new decking in accordance with the Contract Documents.
Install railing in accordance with the
Contract Documents.
2.3.1 (a.) DOCK ‐ CONSTRUCTION
DESCRIPTION
Construct new deck supporting structure in accordance with the Contract
Documents.
Install new docking hardware in accordance with the Contract
Documents. Ex. Bumpers, tie down cleats, etc.
2.3.1 (d.) DUNE WALKOVER ‐ SOUTH ‐ DEMOLITION
DESCRIPTION
Removal of the existing railing to include posts and associated hardware.
Install composite top plate at railing in accordance with the Contract
Documents.
DESCRIPTION
Construct new deck supporting structure in accordance with the Contract
Documents.
Install new decking in accordance with the Contract Documents.
2.3.1 (c.) DUNE WALKOVER ‐ NORTH ‐ CONSTRUCTION
DESCRIPTION
Construct new deck supporting structure in accordance with the Contract
Documents.
Construct new access stairs in accordance with the Contract
Documents.
2.3.1 (b.) C‐SHAPED BOARDWALK ‐ CONSTRUCTION
Install new decking in accordance with the Contract Documents.
SECTION SUB TOTAL:CONSTRUCTION
Removal of the stairs, railing, posts/piles and associated harware to accommodate new stair construction.
Removal of the deck supporting structure to include piles and associated harware.
Removal of the deck boards and associated harware.
PRICING SCHEDULE 2 of 3
2/16/2018
SUB TOT:
LINE ITEM UNIT QUANTITY UNIT COST TOTAL Notes d.1 Deck Supporting Structure
SF
d.2 Stairs
EA
d.3 Deck (Walking Surface)
SF
d.4 Handrail / Railing
LF
d.5 Composite Top Plate
LF
SUB TOT:
LINE ITEM % TOTAL Notes
001 Overhead ‐$
002 Profit ‐$
003 Bond ‐$
PROJECT SUBTOTAL (General Conditions + Demolition + Construction) =
CONTRACTOR PERIOD OF PERFORMANCE = Days
2.3.1 OVERHEAD, PROFIT, BOND
DESCRIPTION
Overhead Costs
Profit
Install railing in accordance with the
Contract Documents.
2.3.1 (d.) DUNE WALKOVER ‐ SOUTH ‐ CONSTRUCTION
DESCRIPTION
Construct new deck supporting structure in accordance with the Contract
Documents.
Construct new access stairs in accordance with the Contract
Documents.
Install new decking in accordance with the Contract Documents.
Actual Bond
PROJECT TOTAL ESTIMATE (Overhead, Profit, Bond + Project Subtotal) =
Install composite top plate at railing in accordance with the Contract
Documents.
PRICING SCHEDULE 3 of 3
2/16/2018
2.3.1 EQUIPMENT RENTAL ( ITEMIZED LIST ) SUB TOT:
UNIT QUANTITY QUANTITY UNIT COST TOTAL
ex. MONTH 1 1 2,180.00 2,180.00$
1 ‐$
2 ‐$
3 ‐$
4 ‐$
5 ‐$
6 ‐$
7 ‐$
8 ‐$
9 ‐$
10 ‐$
11 ‐$
12 ‐$
13 ‐$
14 ‐$
15 ‐$
16 ‐$
17 ‐$
18 ‐$
19 ‐$
20 ‐$
OTHER PROJECT NOTES FOR BID
UNIT QUANTITY QUANTITY UNIT COST TOTAL
ex. MONTH 1 1 2,180.00 2,180.00$
1 ‐$
2 ‐$
3 ‐$
4 ‐$
5 ‐$
6 ‐$
7 ‐$
8 ‐$
9 ‐$
10 ‐$
11 ‐$
12 ‐$
13 ‐$
14 ‐$
15 ‐$
16 ‐$
17 ‐$
18 ‐$
19 ‐$
20 ‐$
RENTAL DESCRIPTION
(Example) 40' Straight Boom Manlift (Sunbelt Rentals)
SUB TOT
DESCRIPTION
(Example) 40' Straight Boom Manlift (Sunbelt Rentals)
Note: Provide additional pages as needed Support Pricing Schedule
______ of _____