Attachment 2 MacDill AFB Habitat Restoration IDIQ Bid Schedule.xlsx

XLSX spreadsheet 34 KB Posted

Attached to
MacDill AFB Habitat Restoration Services IDIQ Federal contract opportunity
Solicitation number
FA4814-11-R-0019
Issued by
Department of the Air Force Air Mobility Command

About this file

Attachment 2 MacDill AFB Habitat Restoration IDIQ Bid Schedule

View the file

Other files for this federal contract opportunity

Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FY11

BASE PERIOD (FY11) - PLANNED WORK
HABITAT RESTORATION & INVASIVE PLANT SPECIES CONTROL PROJECT
MacDill Air Force Base, Florida
C
LTaskSiteEstimatedUnitEstimatedTotal CostNotes/Comments
IIDUnitsTypeCost
N(per unit)
1.1 Invasive Species Eradication and Control
1.1.1 Chemical treatment
0001Apply HerbicideQuadrants 1, 2, 3 & 42,332Acres$0Work Scope: Herbicide applications to control growth of invasive species within undeveloped areas of MacDill AFB. Primary invasive species of concern are Brazilian pepper, melaleuca, lead tree, and cogan grass. Work Area: Quadrant 1 is 771 acres in area on the eastern side of MacDill AFB. Quadrant 2 is 661 acres in area on the southern central portion of the base. Quadrant 3 is 500 acres in area on the southern central portion of the base. Quadrant 4 is 400 acres in area on the western side of the runway on base.
00021.1.2 Vegetation Clearing
0002AAHand Cut & Chip TreesSelected Areas2Acres$0Work Scope: Hand clear (cut down) and chip up any dead or live Brazilian pepper, Lead tree, or other invasive tree species within the various maintenance areas (Quadrants) to clear the understory and prepare the site for prescribed burning. Work Area: TBD based on need. Bid on a cost per acre cost estimate.
0002ABEquipment Mob.1Lump Sum$0Work Scope: One time fee for mobilization and set up of equipment for mechanical clearing using a machine (Gyro Trac, Hydro-Ax, or similar) to the job site.
0002ACMech ClearingSelected Areas3Acres$0Work Scope: Use a machine (Gyro Trac, Hydro-Ax, or similar) to clear and chip any dead or live Brazilian pepper, Lead tree, or other invasive tree species within the various maintenance areas (Quadrants) to clear the understory and prepare the site for prescribed burning. Work Area: TBD based on need. Bid on a cost per acre cost estimate.
1.2 Aquatic Invasive & Nuisance Species Control
0003Apply HerbicideLakes & Drainage Canals19Acres$0Work Scope: Herbicide application only of invasive and nuisance aquatic vegetation, primarily hydrilla, water hyacinth, and cattails in our freshwater lakes, stormwater ponds, and drainage canals. Treat initially, then perform a follow-up treatment after 4 months to retreat anything that was missed. Work Area: Selected lakes, stormwater ponds and drainage canals.
00041.3 Prescribed Burning
0004AAConduct BurningSelected Areas1Days$0Work Scope: Conduct prescribed burn activities in accordance with Prescribed Burn Management Plan (PBMP) at identified sites. Contractor will provide all personnel and equipment necessary to perform the burn, as well as secure any necessary permits prior to burning. The unit price for burning shall include a mop-up event the day after each burn. Contractor will accomplish all necessary tasks to prepare the site, excluding creating fire breaks, for a safe burn, in accordance with MacDill's PBMP.
0004ABCreate Fire BreaksSelected Areas6,900Linear Foot$0Work Scope: Create/enhance fire breaks between burn units by discing or clearing vegetation
00051.4 Native Vegetation Planting
0005AAInstall sod5400SF$0Work Scope: Laying sod in disturbed areas following construction or habitat restoration activities at selected sites.
0005ABInstall plants1-Gallon Size245EA$0Work Scope: Plant native vegetation in areas where clearing and removal of invasive species has occurred to facilitate restoration of the site.
0005ACInstall Plants3-Gallon Size80EA$0Work Scope: Plant native vegetation in areas where clearing and removal of invasive species has occurred to facilitate restoration of the site.
1.5 Wildflower Demonstration Maintenance
0006Apply HerbicideWildflower Demonstration Sites2Acres$0Work Scope: accomplish two herbicide treatment events within the two wildflower demonstration sites to control growth of undesirable and nuisance vegetation that may outcompete the wildflowers. Both sites combined are two acres in total area.
BASE PERIOD TOTAL$0
NOTE: CLINs/Sub-CLINs on Task Orders issued during this option period will be computed utilizing the pricing per unit quoted above.

FY12

FIRST OPTION YEAR (FY12) - ANTICIPATED WORK SCOPE
HABITAT RESTORATION & INVASIVE PLANT SPECIES CONTROL PROJECT
MacDill Air Force Base, Florida
C
LTaskSiteEstimatedUnitEstimatedTotal CostNotes/Comments
IIDUnitsTypeCost
N(per unit)
1.1 Invasive Species Eradication and Control
1.1.1 Chemical treatment
1001Apply HerbicideQuadrants 1, 2, 3 & 42,332Acres$0Work Scope: Herbicide applications to control growth of invasive species within undeveloped areas of MacDill AFB. Primary invasive species of concern are Brazilian pepper, melaleuca, lead tree, and cogan grass. Work Area: Quadrant 1 is 771 acres in area on the eastern side of MacDill AFB. Quadrant 2 is 661 acres in area on the southern central portion of the base. Quadrant 3 is 500 acres in area on the southern central portion of the base. Quadrant 4 is 400 acres in area on the western side of the runway on base.
10021.1.2 Vegetation Clearing
1002AAHand Cut & Chip TreesSelected Areas2Acres$0Work Scope: Hand clear (cut down) and chip up any dead or live Brazilian pepper, Lead tree, or other invasive tree species within the various maintenance areas (Quadrants) to clear the understory and prepare the site for prescribed burning. Work Area: TBD based on need. Bid on a cost per acre cost estimate.
1002ABEquipment Mob.1Lump Sum$0Work Scope: One time fee for mobilization and set up of equipment for mechanical clearing using a machine (Gyro Trac, Hydro-Ax, or similar) to the job site.
1002ACMech ClearingSelected Areas4Acres$0Work Scope: Use a machine (Gyro Trac, Hydro-Ax, or similar) to clear and chip any dead or live Brazilian pepper, Lead tree, or other invasive tree species within the various maintenance areas (Quadrants) to clear the understory and prepare the site for prescribed burning. Work Area: TBD based on need. Bid on a cost per acre cost estimate.
1.2 Aquatic Invasive & Nuisance Species Control
1003Apply HerbicideLakes & Drainage Canals25Acres$0Work Scope: Herbicide application only of invasive and nuisance aquatic vegetation, primarily hydrilla, water hyacinth, and cattails in our freshwater lakes, stormwater ponds, and drainage canals. Treat initially, then perform a follow-up treatment after 4 months to retreat anything that was missed. Work Area: Selected lakes, stormwater ponds and drainage canals.
10041.3 Prescribed Burning
1004AAConduct BurningSelected Areas3Days$0Work Scope: Conduct prescribed burn activities in accordance with Prescribed Burn Management Plan (PBMP) at identified sites. Contractor will provide all personnel and equipment necessary to perform the burn, as well as secure any necessary permits prior to burning. The unit price for burning shall include a mop-up event the day after each burn. Contractor will accomplish all necessary tasks to prepare the site, excluding creating fire breaks, for a safe burn, in accordance with MacDill's PBMP.
1004ABCreate Fire BreaksSelected Areas5,000Linear Foot$0Work Scope: Create/enhance fire breaks between burn units by discing or clearing vegetation
10051.4 Native Vegetation Planting
1005AAInstall sod1SF$0Work Scope: Laying sod in disturbed areas following construction or habitat restoration activities at selected sites.
1005ABInstall plants1-Gallon Size1EA$0Work Scope: Plant native vegetation in areas where clearing and removal of invasive species has occurred to facilitate restoration of the site.
1005ACInstall Plants3-Gallon Size1EA$0Work Scope: Plant native vegetation in areas where clearing and removal of invasive species has occurred to facilitate restoration of the site.
1.5 Wildflower Demonstration Maintenance
1006Apply HerbicideWildflower Demonstration Sites2Acres$0Work Scope: accomplish two herbicide treatment events within the two wildflower demonstration sites to control growth of undesirable and nuisance vegetation that may outcompete the wildflowers. Both sites combined are two acres in total area.
OPTION PERIOD 1 TOTAL$0
NOTE: CLINs/Sub-CLINs on Task Orders issued during this option period will be computed utilizing the pricing per unit quoted above.

FY13

SECOND OPTION YEAR (FY13) - ANTICIPATED WORK SCOPE
HABITAT RESTORATION & INVASIVE PLANT SPECIES CONTROL PROJECT
MacDill Air Force Base, Florida
C
LTaskSiteEstimatedUnitEstimatedTotal CostNotes/Comments
IIDUnitsTypeCost
N(per unit)
1.1 Invasive Species Eradication and Control
1.1.1 Chemical treatment
2001Apply HerbicideQuadrants 1, 2, 3 & 42,332Acres$0Work Scope: Herbicide applications to control growth of invasive species within undeveloped areas of MacDill AFB. Primary invasive species of concern are Brazilian pepper, melaleuca, lead tree, and cogan grass. Work Area: Quadrant 1 is 771 acres in area on the eastern side of MacDill AFB. Quadrant 2 is 661 acres in area on the southern central portion of the base. Quadrant 3 is 500 acres in area on the southern central portion of the base. Quadrant 4 is 400 acres in area on the western side of the runway on base.
20021.1.2 Vegetation Clearing
2002AAHand Cut & Chip TreesSelected Areas4Acres$0Work Scope: Hand clear (cut down) and chip up any dead or live Brazilian pepper, Lead tree, or other invasive tree species within the various maintenance areas (Quadrants) to clear the understory and prepare the site for prescribed burning. Work Area: TBD based on need. Bid on a cost per acre cost estimate.
2002ABEquipment Mob.1Lump Sum$0Work Scope: One time fee for mobilization and set up of equipment for mechanical clearing using a machine (Gyro Trac, Hydro-Ax, or similar) to the job site.
2002ACMech ClearingSelected Areas20Acres$0Work Scope: Use a machine (Gyro Trac, Hydro-Ax, or similar) to clear and chip any dead or live Brazilian pepper, Lead tree, or other invasive tree species within the various maintenance areas (Quadrants) to clear the understory and prepare the site for prescribed burning. Work Area: TBD based on need. Bid on a cost per acre cost estimate.
1.2 Aquatic Invasive & Nuisance Species Control
2003Apply HerbicideLakes & Drainage Canals42Acres$0Work Scope: Herbicide application only of invasive and nuisance aquatic vegetation, primarily hydrilla, water hyacinth, and cattails in our freshwater lakes, stormwater ponds, and drainage canals. Treat initially, then perform a follow-up treatment after 4 months to retreat anything that was missed. Work Area: Selected lakes, stormwater ponds and drainage canals.
20041.3 Prescribed Burning
2004AAConduct BurningSelected Areas3Days$0Work Scope: Conduct prescribed burn activities in accordance with Prescribed Burn Management Plan (PBMP) at identified sites. Contractor will provide all personnel and equipment necessary to perform the burn, as well as secure any necessary permits prior to burning. The unit price for burning shall include a mop-up event the day after each burn. Contractor will accomplish all necessary tasks to prepare the site, excluding creating fire breaks, for a safe burn, in accordance with MacDill's PBMP.
2004ABCreate Fire BreaksSelected Areas5,000Linear Foot$0Work Scope: Create/enhance fire breaks between burn units by discing or clearing vegetation
20051.4 Native Vegetation Planting
2005AAInstall sod1SF$0Work Scope: Laying sod in disturbed areas following construction or habitat restoration activities at selected sites.
2005ABInstall plants1-Gallon Size800EA$0Work Scope: Plant native vegetation in areas where clearing and removal of invasive species has occurred to facilitate restoration of the site.
2005ACInstall Plants3-Gallon Size100EA$0Work Scope: Plant native vegetation in areas where clearing and removal of invasive species has occurred to facilitate restoration of the site.
1.5 Wildflower Demonstration Maintenance
2006Apply HerbicideWildflower Demonstration Sites1Acres$0Work Scope: accomplish two herbicide treatment events within the two wildflower demonstration sites to control growth of undesirable and nuisance vegetation that may outcompete the wildflowers. Both sites combined are two acres in total area.
OPTION PERIOD 2 TOTAL$0
NOTE: CLINs/Sub-CLINs on Task Orders issued during this option period will be computed utilizing the pricing per unit quoted above.

FY14

THIRD OPTION YEAR (FY14) - ANTICIPATED WORK SCOPE
HABITAT RESTORATION & INVASIVE PLANT SPECIES CONTROL PROJECT
MacDill Air Force Base, Florida
C
LTaskSiteEstimatedUnitEstimatedTotal CostNotes/Comments
IIDUnitsTypeCost
N(per unit)
1.1 Invasive Species Eradication and Control
1.1.1 Chemical treatment
3001Apply HerbicideQuadrants 1, 2, 3 & 42,332Acres$0Work Scope: Herbicide applications to control growth of invasive species within undeveloped areas of MacDill AFB. Primary invasive species of concern are Brazilian pepper, melaleuca, lead tree, and cogan grass. Work Area: Quadrant 1 is 771 acres in area on the eastern side of MacDill AFB. Quadrant 2 is 661 acres in area on the southern central portion of the base. Quadrant 3 is 500 acres in area on the southern central portion of the base. Quadrant 4 is 400 acres in area on the western side of the runway on base.
30021.1.2 Vegetation Clearing
3002AAHand Cut & Chip TreesSelected Areas1Acres$0Work Scope: Hand clear (cut down) and chip up any dead or live Brazilian pepper, Lead tree, or other invasive tree species within the various maintenance areas (Quadrants) to clear the understory and prepare the site for prescribed burning. Work Area: TBD based on need. Bid on a cost per acre cost estimate.
3002ABEquipment Mob.1Lump Sum$0Work Scope: One time fee for mobilization and set up of equipment for mechanical clearing using a machine (Gyro Trac, Hydro-Ax, or similar) to the job site.
3002ACMech ClearingSelected Areas5Acres$0Work Scope: Use a machine (Gyro Trac, Hydro-Ax, or similar) to clear and chip any dead or live Brazilian pepper, Lead tree, or other invasive tree species within the various maintenance areas (Quadrants) to clear the understory and prepare the site for prescribed burning. Work Area: TBD based on need. Bid on a cost per acre cost estimate.
1.2 Aquatic Invasive & Nuisance Species Control
3003Apply HerbicideLakes & Drainage Canals42Acres$0Work Scope: Herbicide application only of invasive and nuisance aquatic vegetation, primarily hydrilla, water hyacinth, and cattails in our freshwater lakes, stormwater ponds, and drainage canals. Treat initially, then perform a follow-up treatment after 4 months to retreat anything that was missed. Work Area: Selected lakes, stormwater ponds and drainage canals.
30041.3 Prescribed Burning
3004AAConduct BurningSelected Areas3Days$0Work Scope: Conduct prescribed burn activities in accordance with Prescribed Burn Management Plan (PBMP) at identified sites. Contractor will provide all personnel and equipment necessary to perform the burn, as well as secure any necessary permits prior to burning. The unit price for burning shall include a mop-up event the day after each burn. Contractor will accomplish all necessary tasks to prepare the site, excluding creating fire breaks, for a safe burn, in accordance with MacDill's PBMP.
3004ABCreate Fire BreaksSelected Areas5,000Linear Foot$0Work Scope: Create/enhance fire breaks between burn units by discing or clearing vegetation
30051.4 Native Vegetation Planting
3005AAInstall sod1SF$0Work Scope: Laying sod in disturbed areas following construction or habitat restoration activities at selected sites.
3005ABInstall plants1-Gallon Size1EA$0Work Scope: Plant native vegetation in areas where clearing and removal of invasive species has occurred to facilitate restoration of the site.
3005ACInstall Plants3-Gallon Size1EA$0Work Scope: Plant native vegetation in areas where clearing and removal of invasive species has occurred to facilitate restoration of the site.
1.5 Wildflower Demonstration Maintenance
3006Apply HerbicideWildflower Demonstration Sites1Acres$0Work Scope: accomplish two herbicide treatment events within the two wildflower demonstration sites to control growth of undesirable and nuisance vegetation that may outcompete the wildflowers. Both sites combined are two acres in total area.
OPTION PERIOD 3 TOTAL$0
NOTE: CLINs/Sub-CLINs on Task Orders issued during this option period will be computed utilizing the pricing per unit quoted above.

FY15

FOURTH OPTION YEAR (FY15) - ANTICIPATED WORK SCOPE
HABITAT RESTORATION & INVASIVE PLANT SPECIES CONTROL PROJECT
MacDill Air Force Base, Florida
C
LTaskSiteEstimatedUnitEstimatedTotal CostNotes/Comments
IIDUnitsTypeCost
N(per unit)
1.1 Invasive Species Eradication and Control
1.1.1 Chemical treatment
4001Apply HerbicideQuadrants 1, 2, 3 & 42,332Acres$0Work Scope: Herbicide applications to control growth of invasive species within undeveloped areas of MacDill AFB. Primary invasive species of concern are Brazilian pepper, melaleuca, lead tree, and cogan grass. Work Area: Quadrant 1 is 771 acres in area on the eastern side of MacDill AFB. Quadrant 2 is 661 acres in area on the southern central portion of the base. Quadrant 3 is 500 acres in area on the southern central portion of the base. Quadrant 4 is 400 acres in area on the western side of the runway on base.
40021.1.2 Vegetation Clearing
4002AAHand Cut & Chip TreesSelected Areas1Acres$0Work Scope: Hand clear (cut down) and chip up any dead or live Brazilian pepper, Lead tree, or other invasive tree species within the various maintenance areas (Quadrants) to clear the understory and prepare the site for prescribed burning. Work Area: TBD based on need. Bid on a cost per acre cost estimate.
4002ABEquipment Mob.1Lump Sum$0Work Scope: One time fee for mobilization and set up of equipment for mechanical clearing using a machine (Gyro Trac, Hydro-Ax or similar) to the job site.
4002ACMech ClearingSelected Areas24Acres$0Work Scope: Use a machine (Gyro Trac, Hydro-Ax or similar) to clear and chip any dead or live Brazilian pepper, Lead tree, or other invasive tree species within the various maintenance areas (Quadrants) to clear the understory and prepare the site for prescribed burning. Work Area: TBD based on need. Bid on a cost per acre cost estimate.
1.2 Aquatic Invasive & Nuisance Species Control
4003Apply HerbicideLakes & Drainage Canals42Acres$0Work Scope: Herbicide application only of invasive and nuisance aquatic vegetation, primarily hydrilla, water hyacinth, and cattails in our freshwater lakes, stormwater ponds, and drainage canals. Treat initially, then perform a follow-up treatment after 4 months to retreat anything that was missed. Work Area: Selected lakes, stormwater ponds and drainage canals.
40041.3 Prescribed Burning
4004AAConduct BurningSelected Areas3Days$0Work Scope: Conduct prescribed burn activities in accordance with Prescribed Burn Management Plan (PBMP) at identified sites. Contractor will provide all personnel and equipment necessary to perform the burn, as well as secure any necessary permits prior to burning. The unit price for burning shall include a mop-up event the day after each burn. Contractor will accomplish all necessary tasks to prepare the site, excluding creating fire breaks, for a safe burn, in accordance with MacDill's PBMP.
0004ABCreate Fire BreaksSelected Areas10,000Linear Foot$0Work Scope: Create/enhance fire breaks between burn units by discing or clearing vegetation
40051.4 Native Vegetation Planting
4005AAInstall sod1SF$0Work Scope: Laying sod in disturbed areas following construction or habitat restoration activities at selected sites.
4005ABInstall plants1-Gallon Size1,000EA$0Work Scope: Plant native vegetation in areas where clearing and removal of invasive species has occurred to facilitate restoration of the site.
4005ACInstall Plants3-Gallon Size500EA$0Work Scope: Plant native vegetation in areas where clearing and removal of invasive species has occurred to facilitate restoration of the site.
1.5 Wildflower Demonstration Maintenance
4006Apply HerbicideWildflower Demonstration Sites1Acres$0Work Scope: accomplish two herbicide treatment events within the two wildflower demonstration sites to control growth of undesirable and nuisance vegetation that may outcompete the wildflowers. Both sites combined are two acres in total area.
OPTION PERIOD 4 TOTAL$0
NOTE: CLINs/Sub-CLINs on Task Orders issued during this option period will be computed utilizing the pricing per unit quoted above.

Contract Totals

CONTRACT TOTALS
HABITAT RESTORATION & INVASIVE PLANT SPECIES CONTROL PROJECT
MacDill Air Force Base, Florida

BASE PERIOD FY 11 TOTAL OF ALL CLINS FOR PERIOD $0.00

OPTION PERIOD 1 FY 12 TOTAL OF ALL CLINS FOR PERIOD $0.00

OPTION PERIOD 2 FY 13 TOTAL OF ALL CLINS FOR PERIOD $0.00

OPTION PERIOD 3 FY 14 TOTAL OF ALL CLINS FOR PERIOD $0.00

OPTION PERIOD 4 FY 15 TOTAL OF ALL CLINS FOR PERIOD $0.00

Total Contract Price $0.00