Att 06 - Price Breakdown Sheet.pdf

PDF 31 KB Posted

Attached to
B402 Install HVAC Chase Doors
Solicitation number
FA480326R0002
Issued by

About this file

This is a pricing template for a federal construction contract related to HVAC chase door installation. The project, designated B402 Install HVAC Chase Doors with reference number VLSB-26-0052, is located at Building B402. The template is structured to capture both material and labor costs across multiple line items.

The pricing template includes line items for wall preparation, wall paint (measured in square feet), and door installation, with separate columns for material costs (unit cost and total), labor costs (labor hours, average rate, and total labor cost), direct costs, and line totals. Additional line items accommodate project management and project superintendent time, measured in days. The template provides sections for calculating total material costs, total labor cost, direct cost, overhead, profit, bond, subtotal, and ultimately the total contract price. All current values display as $0.00, indicating this is a blank template awaiting contractor cost input. The document is marked "For Office Use Only" and requires contractor name, address, and purchase requisition (PR) information to be completed.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

` FOR OFFICE USE ONLY

Project: B402 Install HVAC Chase Doors VLSB -26-0052

Location: B402 B402

Contractor:

Address:

PR

Unit Cost Total Labor Labor Cost Labor-Hours Avg. Rate Total Wall Prep

Wall Paint SQFT

Install Doors

Project Manager days Project Superintendant days

Totals: $0.00 $0.00 $0.00 $0.00

Reference

For Official Use Only Line No.

Material Costs Labor Costs Line TotalQuantity

Unit of Measure

Direct CostItem

Total Contract Price:

Bond:

Subtotal:

$0.00Profit:

Subtotal:

Overhead:

$0.00

Total Material Cost:

Total Labor Cost:

$0.00 $0.00

$0.00

Direct Cost:

Total Line Item Cost: $0.00

$0.00

File details come from the government source that posted it. Updated .