Attachment 03 - Price Breakdown Worksheet.xlsx
XLSX spreadsheet 53 KB Posted
- Attached to
- B912 Electrical Panel
- Solicitation number
- FA480323R0014
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| ` | FOR OFFICE USE ONLY | ||||||||||||
| Project: | B912 Repair Power Panel | VLSB 23-2035 | Project Engineer: | Tony Satcher | |||||||||
| Location: | B912 Chapel | Department: | 20 CES | ||||||||||
| Contractor: | 2-May-23 | ||||||||||||
| Address: | |||||||||||||
| PR No.: | |||||||||||||
| For Official Use Only | |||||||||||||
| Reference | Line No. | Item | Unit of Measure | Quantity | Material Costs | Labor Costs | Direct Cost | Line Total | |||||
| Unit Cost (Means) | Total | Labor Hours per Unit (Means) | Labor Cost per Unit (Means) | Labor-Hours | Avg. Rate ($/hr) | Total | |||||||
| ELECTRICAL | |||||||||||||
| 1 | Electrical Panel A - 208/120 VAC, 100 Amps, 3 phase. Minimum 32 positions | ea | 1 | $0.00 | $0.00 | $0.00 | |||||||
| 2 | Fused Disconnect A - 208/120 VAC, 100 Amps, 3 phase | ea | 1 | $0.00 | $0.00 | $0.00 | |||||||
| 3 | Install Surge Supresson Device (SPD) | ea | 1 | $0.00 | $0.00 | $0.00 | |||||||
| 4 | Wall surface mount LED Light Dimmer Switch | ea | 1 | $0.00 | $0.00 | $0.00 | |||||||
| 5 | Surface mount raceway | foot | 1 | $0.00 | $0.00 | $0.00 | |||||||
| 6 | Install 2 AWG Feeder Cable | foot | 1 | $0.00 | $0.00 | $0.00 | |||||||
| 7 | Install 12 AWG Wire | foot | 1 | $0.00 | $0.00 | $0.00 | |||||||
| MASONRY | |||||||||||||
| 8 | Repair Corridor Wall - Plaster | SF | 1 | $0.00 | $0.00 | $0.00 | |||||||
| Paint | |||||||||||||
| 9 | Paint Corridor Wall and Nave surface mounted raceway | SF | 1 | $0.00 | $0.00 | $0.00 | |||||||
| DESIGN | |||||||||||||
| 10 | Drawings/As-Builts | hr | $0.00 | 1 | $0.00 | $0.00 | $0.00 |
| 11 | General Condtions | days | $0.00 | ||||
| 12 | Project Superintendant | days | $0.00 | ||||
| Totals: | $0.00 | $0.00 | $0.00 | $0.00 |
| Total Material Cost: | $0.00 |
| Total Labor Cost: | $0.00 |
| Direct Cost: | $0.00 |
| Total Line Item Cost: | $0.00 |
| Overhead: | 10% | $0.00 |
| Subtotal: | $0.00 |
| Profit: | 10% | $0.00 |
| Subtotal: |
| Bond: | 2.5% |
| Total Contract Price: |
Sheet2
Sheet3
File details come from the government source that posted it. Updated .