Questions and Answers.docx

DOCX document 13 KB Posted

Attached to
Access Floor Tiles Federal contract opportunity
Solicitation number
FA480320QB106
Issued by
Department of the Air Force Air Combat Command

View the file

Other files for this federal contract opportunity

Other files attached to Access Floor Tiles, newest first.
File Type Posted
Amendment 0001.pdf PDF
Salient Charateristics.pdf PDF
SOW- Raised Floor Tiles-edit 17Aug20.pdf PDF
Solicitation Raised Floor Tiles.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers FA480320QB106 - Raised Floor Tile 8 September 2020

· Question One: Is the contractor required to cut the internal holes for the electric box in the new raised floor panels, place the new box into the hole that has been cut, and wire the electrical box to an underfloor electrical distribution system?

Government Response:

Contractor is required to cut the holes and install the boxes, the connections will be performed by other comm and electrical personnel.

· Question Two: Is the frame that the floor tiles will be installed into on a regular bolted stringer support or heavy-duty bolted stringer support?

Heavy-duty Bolted Stringer Support System

· Question Three: What are the unloading logistics for the building to include any stairs or steps?

Backdoor area nearest to the locations of the offices where the work is required; four steps to go from ground to the doorway.