Past Performance Questionnaire

66 KB Posted

Attached to
Repair Base Pavements Requirements Contract Federal contract opportunity
Solicitation number
FA4803-11-R-0002
Issued by
Department of the Air Force Air Combat Command

About this file

Attachment 2-Past Performance Questionnaire

Text of this file

Solicitation No: FA4803-11-R-0002

VLSB 10-0064

Attachment 2 Dated 26 Apr 11

PAST AND PRESENT PERFORMANCE QUESTIONNAIRE

SOLICITATION: FA4803-11-R-0002

CONTRACT NAME: REPAIR BASE PAVEMENTS REQUIREMENTS CONTRACT

PROJECT NUMBER: SHA 10-0064

Section A. GENERAL INFORMATION: Please correct any information below known to be inaccurate:

Contractor’s Name: ____________________ Telephone Number: ____________________

Address: __________________________ Fax Number: _________________________

__________________________ Point of Contact: ______________________

Project Title and Brief Description of Work: _____________________________________ Contract Number Provided by Offeror: ___________________ Dollar Amount: ________

Contract Period or Dates of Performance Provided by Offeror: ______________________ Contractor performed as the ( Prime Contractor ( Sub-Contractor ( Key Personnel.

Section B. RESPONDENT INFORMATION:

Name of Respondent:

_____________________ Title: ____________________________

Address: _____________________

Telephone Number: ___________________ _____________________________

Fax Number:

Email Address: _____________________

Section C. EMAIL OR FAX COMPLETED SURVEY FORM TO:

POC: Janet Alworth Alternate: Barbara Bonnette Email: janet.alworth@shaw.af.mil Email: Barbara.Bonnette@shaw.af.mil Fax: (803) 895-5340

DSN: 965-5340

Section D. PERFORMANCE INFORMATION: Choose the appropriate letter on the scale (E, G, S, M, U, and N) that most accurately describes the contractor’s performance or situation. PLEASE PROVIDE A NARRATIVE EXPLANATION FOR ANY RATINGS OF M or U.

E
G
S
M
U
N
Exceptional
Good
Satisfactory
Marginal
Unsatisfactory
Neutral

Performance meets contractual requirements with many exceeded to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with no more than a few minor problems for which corrective actions taken by the contractor were highly effective.

Performance meets contractual requirements with some exceeded to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with no more than some minor problems for which corrective actions taken by the contractor were effective.

Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor were satisfactory.

Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions or the contractor’s proposed actions appear only marginally effective or were not fully implemented.

Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective.

Performance was not observed or not applicable to the current effort being reported against.

CONTRACTOR’S NAME: _______________ CONTRACT NUMBER: _______________

Place an “X” in the appropriate column using the definitions matrix above.

The contractor:
E
G
S
M
U
N
1.
Provided experienced managers and supervisors with the technical and administrative abilities needed to meet contract requirements.
2.
Demonstrated ability to hire, maintain, and replace, if necessary, qualified personnel during the contract period.
3.
Delegated authority to project managers and supervisors commensurate with contract requirements.
4.
Home office participated in solving significant local problems.
5.
Followed approved quality control plan.
6.
Provided effective quality control and/or inspection procedures to meet contract requirements.
7.
Corrected deficiencies in timely manner and pursuant to their quality control procedures.
8.
Provided timely resolution of contract discrepancies.
9.
Identified problems as they occurred.
10.
Suggested alternative approaches to problems.
11.
Displayed initiative to solve problems.
12.
Developed realistic progress schedules.
13.
Met established project schedules.
14.
Provided timely resolution of warranty defects.
15.
Was responsive to contract changes.
16.
Provided adequate project supervision.
17.
Obtained consent of surety for increases in bonding as work-in-progress increased.
18.
Paid subcontractors/suppliers in a timely manner.
19.
Provided accurate and complete line item cost proposals including all aspects of work required for each task.
20.
Cooperated with Government personnel after award.
21.
How would you rate the contractor's overall performance?
22.
Was the contractor ever issued a cure or show cause notice under the referenced contract? If yes, explain outcome in “remarks.”
YES/NO
23.
Would you award another contract to this contractor? If not, explain in “remarks.”
YES/NO
24.
Is the contractor rated in CPARS?
YES/NO

CONTRACTOR’S NAME: ___________________ CONTRACT NUMBER __________

Remarks:___________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Other files for this federal contract opportunity

Other files attached to Repair Base Pavements Requirements Contract, newest first.
File Type Posted
Amendment 3.doc DOC document
FA4803-11-R-0002-Shaw-PAVING-Amend2-Exhibit A-Bid Schedule —
Paving Amendment 0003.docx DOCX document
FA4803-11-R-0002-Shaw-PAVING-Amendment 2.doc DOC document
FA4803-11-R-0002-Shaw-PAVING-Amend2-SOW-Attachment 3.doc DOC document
FA4803-11-R-0002-Shaw-PAVING-Amend2-DD1354-Attachment 5.pdf PDF
FA4803-11-R-0002-Shaw-PAVING-Amend2-Q A-Attachment 7.docx DOCX document
FA4803-11-R-0002-Shaw-PAVING-Amend2-Site Visit Minutes-Attachment 6.docx DOCX document
FA4803-11-R-0002-Shaw-PAVING-Amend2-Exhibit A-Bid Schedule.xls XLS spreadsheet
Solicitation Amendment 1-Site Visit.doc DOC document
Specifications —
Bid Schedule —
Wage Determination —
1442.doc DOC document
SOW —
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .