FA4803-11-R-0002-Shaw-PAVING-Amend2-SOW-Attachment 3.doc

DOC document 28 KB Posted

Attached to
Repair Base Pavements Requirements Contract Federal contract opportunity
Solicitation number
FA4803-11-R-0002
Issued by
Department of the Air Force Air Combat Command

About this file

Attachment 3 - Revised SOW (22Jul11)

View the file

Other files for this federal contract opportunity

Other files attached to Repair Base Pavements Requirements Contract, newest first.
File Type Posted
Amendment 3.doc DOC document
FA4803-11-R-0002-Shaw-PAVING-Amend2-Exhibit A-Bid Schedule —
Paving Amendment 0003.docx DOCX document
FA4803-11-R-0002-Shaw-PAVING-Amendment 2.doc DOC document
FA4803-11-R-0002-Shaw-PAVING-Amend2-DD1354-Attachment 5.pdf PDF
FA4803-11-R-0002-Shaw-PAVING-Amend2-Q A-Attachment 7.docx DOCX document
FA4803-11-R-0002-Shaw-PAVING-Amend2-Site Visit Minutes-Attachment 6.docx DOCX document
FA4803-11-R-0002-Shaw-PAVING-Amend2-Exhibit A-Bid Schedule.xls XLS spreadsheet
Solicitation Amendment 1-Site Visit.doc DOC document
Specifications —
1442.doc DOC document
SOW —
Past Performance Questionnaire —
Bid Schedule —
Wage Determination —
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation No: FA4803-11-R-0002-0002

VLSB 10-0064

Attachment 3 Dated 22 Jul 11

STATEMENT OF WORK

FOR

REPAIR BASE PAVEMENTS

PROJECT: VLSB 10-0064

DATE: 22 July 2011

1. STATEMENT OF WORK: The requirements work covered by the attached specifications, line item spreadsheet and drawings consists in furnishing of all plant, labor, equipment, transportation and materials to perform the following items of work associated with asphalt pavement installation or repair: Milling of pavements, demolition of pavements, excavation and grading, installation of storm drains and headwalls, installation or repair of base course, grading and compaction of sub-base, base and asphalt pavement, concrete driveways and sidewalks, segmental concrete block walls, marking of pavements, topsoil and grassing at Shaw AFB, SC, in order to achieve a complete project, ready to use in strict accordance with the specifications, drawings and subject to the terms and provisions of the contract. All Unit Prices shall include traffic control and surveying both Horizontal and Vertical Control and Layout to install any work purchased in any delivery order issued.

2. CONTRACT PERIOD: Each Delivery Order (DO) issued against this contract shall have a separate Period of Performance. The performance period for each DO will be individually negotiated prior the issuance of the DO.

3. WORK INCLUDED IN THIS PROJECT: This project includes Shaw AFB, Poinsett Weapons Range and Wateree Recreation Facility for the period of the contract with the following exceptions:

a. Asphalt and concrete pavement that will be installed in conjunction with building construction and repair projects.

b. Asphalt and concrete pavement that will be installed in conjunction with airfield paving projects.

c. Airfield repairs to Aprons and Runway Surfaces on Shaw AFB to include demolition and replacement of pavement sections.

d. The contractor shall provide as-built drawings for projects as requested per delivery order and completed DD Form 1354. As-built shall be Auto Cad 2010 or later version.

End of Statement of Work 01000-2