Appendix C. Contractor Submittals.docx
DOCX document 40 KB Posted
- Attached to
- Vertical Transportation Equipment (VTE)
- Solicitation number
- FA480127Q0006
About this file
This is an Appendix C Contractor Submittals document for the Vertical Transportation Equipment (VTE) Maintenance, Repair, and Inspection Services contract at Holloman Air Force Base. The appendix outlines all required submissions the contractor must deliver throughout contract performance, specifying submission deadlines and points of contact for each deliverable. The Initial Inspection Report must be submitted to the Contracting Officer's Representative (COR) within 30 days after contract award. The Maintenance Control Plan (MCP) is due within 30 days after contract award for the base year and 30 days prior to the start of each option period, also submitted to the COR. The Quality Control Plan must be submitted to the Contracting Officer within 30 days after contract award. Recurring monthly reporting requires submission of a Monthly Report no later than the fifth business day of each month to the COR, while an Annual Safety Report is due no later than the fifth business day following the Annual Inspection.
Additional administrative submissions include Elevator Registrations, due within 90 days after contract award to the COR or Contracting Officer, and Proof of Elevator Registrations, due within 120 days after contract award to the same recipients. These submittals are essential compliance and operational documents required to maintain contract performance standards for the fifteen VTE units under maintenance at the Air Force installation. The document does not address pricing terms, contract vehicles, or set-asides, serving solely as a procedural reference for contractor deliverable timelines and responsible parties.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Atch 4 Mission Essential Memo for VTE_Signed_27Q0006.pdf | ||
| Atch 3 NCIC Base Access 8May26_27Q0006.pdf | ||
| Atch 1 PWS dtd 16 Sep 2026 VTE_Signed.docx | DOCX document | |
| Appendix B. Publications, Instructions, Standards.docx | DOCX document | |
| Appendix A. VTE Equipment Listing.docx | DOCX document | |
| Atch 2 WD 1986-01177 Rev 60_6.05.2026_27Q0006.docx | DOCX document | |
| Appendix E. Over and Above Work Request Form PDF w signature blocks.pdf | ||
| Solicitation - FA480127Q0006.pdf | ||
| Appendix D. Over and Above Project Instructions.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sol. # FA480127Q0006
Con. #
Appendix C Contractor Submittals
| Submittal Requirement |
| Due |
| Submit To |
| PWS |
Reference
| Initial Inspection Report |
| Within 30 days after contract award. |
| COR |
| 4.1. |
Maintenance Control Plan (MCP) Within 30 days after contract award for base year, and 30 days prior to start of each option period.
COR
4.2., 4.3.
| Quality Control Plan |
| Within 30 days after contract award. |
| Contracting Officer |
| 8.1. |
| Monthly Report |
| No later than the fifth business day of each month. |
| COR |
| 5.4.1. |
| Annual Safety Report |
| No later than the fifth business day after the Annual Inspection |
| COR |
| 5.4.2. |
| Elevator Registrations |
| Within 90 days after contract award. |
| COR/CO |
| 5.4.5 |
| Proof of Elevator Registrations |
| Within 120 days after contract award. |
| COR/CO |
| 5.4.5 |
Attachment 1, Appendix C