Amd_Issued SF30 FA480123Q0006-0001 ISWM.pdf
PDF 536 KB Posted
- Attached to
- Integrated Solid Waste Management (ISWM/Refuse) Services Federal contract opportunity
- Solicitation number
- FA480123Q0006
View the file
Other files for this federal contract opportunity
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBE
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
Created On: 07 Jun 2023, 10:50 AM Mountain Standard Time
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
The purpose of this amendment is to extend the definition of recent past performance from Block 14 (Description of Amendment/Modification):
three (3) years to five (5) years.
A. Addendum to 52.212-2, Evaluation--Commercial Products and Commercial Services (Nov 2021) para (g)(1) is hereby updated from three (3) years to five (5) years.
---1. Contract must be currently on-going or started no earlier than May 2018.
B. Addendum to 52.212-1, Instructions to Offerors-Commercial Items (NOV 2021) para (b)(17) is hereby updated from three (3) years to five (5) years.
---1. Contract must be currently on-going or started no earlier than May 2018.
C. An updated conformed copy of the SF1449 solicitation, through this amendment is included.
--------NOTICE: Each Offeror MUST SUBMIT their offer using the Conformed Copy through amendment 0001--------
***Note: Any changes within this modification, not annotated above, is a software error.
Instructions, Conditions, & Notices to Offerors or Quoters
Miscellaneous text in this section has been modified to:
Addendum to 52.212-1, Instructions to Offerors-Commercial Items (NOV 2021)
FAR provision 52.212-1, is hereby tailored as follows:
(b) Submission of offers. In addition to this paragraph's (1) through (11), the following are added:
(12) Purpose: The purpose of these instructions is to prescribe the format of proposals and describe the approach for the development and presentation of proposal data. They are designed to ensure the submission of information essential to the understanding and comprehensive validation of proposals. Offerors are cautioned to follow the detailed instructions fully and carefully, as the Government can make an award based on the initial offers received, without discussion of such offers.
(13) Proposal Format: Each proposal shall be submitted as one document, tabbed for each part. Any commitments made in the proposal shall become a part of the resultant contract.
Part I - Technical Proposal
Part II - Past Performance Information; including Atch 4, Past Performance Questionnaire and
Part III -Solicitation/Price Proposal
(14) Submission Requirements.
(i) Submit electronic proposal documents in a format readable by Microsoft (MS)Office Word 1997- 2003 or 2007, 2010 or 2013, 2016, MS Office Excel 1997-2003,2007, 2010 or 2013, 2016, and MS Office Power Point 1997-2003, 2007, 2010 or2013, 2016 as applicable.
(ii) Submit proposal as follows:
(A) Contact both, the Contract Administrator (CA) and the Contracting Officer (CO) below and 'Request a Drop-off' via DoD SAFE.
Please ensure to include who the request be sent to; multiple names/emails are allowable. The request created by the CA or CO will be valid for 14 days for the contractor to submit complete proposal.
- Mr. Erik S. Montgomery, CA - erik.montgomery.10@us.af.mil
- Mr. Joshua D. Moody, CO - joshua.moody.8@us.af.mil
(B) The CA and the CO are the only points of contact for this acquisition.
(16) Part I -Technical Proposal (Factor 1):
1. The technical proposal shall not make reference to price data. The proposal will be evaluated as acceptable or unacceptable for Factor 1 and its subfactors.
FA480123Q00060001
2. Technical Proposal Requirements: The technical proposal will describe the capability of your organization to perform the requirements of the contract, it shall be specific and complete. The proposal shall not merely offer to perform work in accordance with the PWS, but shall outline the actual method proposed as specifically as possible. Non-conformance with the instructions provided may result in an unacceptable technical evaluation.
3. The proposal shall be clear, concise, and shall include sufficient detail for effective evaluation and for substantiating the validity of stated claims. The proposal should not simply rephrase or restate the Government's requirements but, rather, shall provide convincing rationale to address how the offeror intends to meet these requirements. Offerors shall assume that the Government has no prior knowledge of their facilities or experience and will base its evaluation on the information presented in the offeror's proposal.
4. Your technical proposal shall contain the information specified below in accordance with the following subfactor
Offerors must provide a written plan describing how it will continue to perform the Subfactor1 - Continuation Of Essential Contractor Services.
essential contractor services as described in DFARS 252.237-7024, Notice of Continuation of Essential Contractor Services. Subfactor1 must be met in order to be deemed technically acceptable. If a proposal is determined "unacceptable," the Contracting Officer (CO) will promptly notify the offeror that the proposal will not be considered for award and shall indicate, in general terms, the basis for the determination.
(17) Part II - Past Performance (Factor 2):
Past Performance will be evaluated as acceptable or unacceptable based on recent and relevant as defined below.
- Recent is defined as within the last five (5) years (contract must be currently on-going or started no earlier than May 2018).
- Relevant is defined as contract work in the area of Integrated Solid Waste Management(ISWM); i.e. refuse collection services as identified in the Performance Work Statement (Attachment 1 to this solicitation).
Contractor's Past Performance shall consist of the following:
Pertinent Information: Use Attachment 4, PPQ for the basic information. Provide any information currently available (letters, metrics, customer surveys, independent surveys, etc.) which demonstrates customer satisfaction with the Offeror's overall job performance and quality of the Offeror's completed contract services for the same or similar type contract, ISWM services, referenced in this solicitation. The Offeror may provide the amount of time the Offeror has been doing this type of work and a description of the work performed. In addition, explain corrective actions taken in the past, if any, for substandard performance and any current performance problems affecting performance (such as numerous incidences of re-performance of work, discrepancies, etc.). It is the Offeror's responsibility to ensure all past performance data submitted is current and correct so that the Government can perform a proper evaluation.
Past Performance section is limited to a maximum of the three (3) most recent/relevant contracts performed for federal agencies and commercial customers, with a page limit of two (2)pages per contract; therefore, an overall page limit of six (6) pages, Attachment 4, Past not including Performance Questionnaire.
Where a teaming arrangement (as defined at FAR Subpart 9.6) is proposed, an additional maximum of up to three(3) projects for partner(s) /subcontractor(s) shall be submitted. Thus a maximum of no more than six (6) projects(3 for the prime and 3 for the subs or other partners) shall be submitted in total. The page size shall be 81/2 x 11 inches.
Where a teaming arrangement is proposed, a narrative and/or the actual Teaming Agreement if one exists, shall be submitted as part of the proposal by the managing partner of the prime contractor. The Government is interested in the roles, responsibilities, and distribution of effort (by type and percentage) between the parties in performance of the Government's requirement and this narrative may enhance the Government's understanding of your proposal. This narrative and/or Teaming Agreement will not count against the stated page size limitation.
(18) Part III - Price Data (Factor 3):
This section of the proposal shall include only the following:
1. Complete blocks 17 (code & facility code = cage code #) and 30 of the RFQ (SF1449). In doing so, the offeror accedes to the contract terms and conditions as written in the RFQ.
2. Complete all blanks for unit and total prices for Base and Option Years.
3. Any, signed, solicitation amendments thereto.
(c) Period for acceptance of offers. The Offeror agrees to hold the prices in its offer firm through contract award. An award is estimated to be made by 1 September 2023, with a start date of 1 October 2023.
(d) Product samples. n/a
(e) Multiple offers. n/a
(h) Multiple awards. n/a
(m) Site Visit. n/a
(n) Questions.(added) Instructions, with date and time, shall be posted to SAM.gov in the Description block.
END Addendum to 52.212-1
Evaluation Factors for Award
The following clauses were modified:
52.212-2 - Evaluation-Commercial Products and Commercial Services. Nov 2021 hereby reads as follows:
Evaluation-Commercial Products and Commercial Services (Nov 2021)
The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will (a) be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers:
(i). Technical
(ii). Price
(iii). Past Performance
. The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic (b) Options requirement. The Government may determine that an offer is unacceptable if the option prices are significantly unbalanced. Evaluation of options shall not obligate the Government to exercise the option(s).
A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance (c) specified in the offer, shall result in a binding contract without further action by either party. Before the offer's specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.
(End of provision)
Addendum to 52.212-2, Evaluation--Commercial Products and Commercial Services (Nov 2021)
In addition to paragraph's (a) through (c), the following are added:
(d) : This acquisition will utilize the Lowest Price Technically Acceptable (LPTA) technique to make a best value award Basis for Award decision. The application of the LPTA technique in the contract award selection and approval process is as follows:
(1) The Government will review the two lowest priced offers and if both are deemed technically and performance acceptable, award will go to the lowest priced offeror and no further proposals shall be reviewed. If either of the two lowest priced offers are not deemed technically and performance acceptable, the next lowest priced offer shall be reviewed for technical and performance acceptability. If this offer is not deemed acceptable, this process shall continue until two offerors are deemed technically and performance acceptable if only one offerors is or of the deemed acceptable, a price analysis report shall be accomplished to determine price fair and reasonable. Note: In accordance with FAR 52.212-1 (g), as prescribed in FAR 12.301(b)(1), "The Government intends to evaluate proposals and award a contract without discussions with offerors" (except clarifications as described in FAR 15.306(a)). Therefore, each initial offer should contain the offeror's best terms from a price and technical standpoint. However, the Government reserves the right to conduct discussions if later determined by the Contracting Officer (CO) to be necessary. A competitive range will be established, and discussions will only be with those offerors in the competitive range. The CO may request offerors of marginal proposals to submit clarifications of areas identified by the technical proposal evaluation team. In initiating a request, the CO will set an appropriate time for submission of such information. Late submissions will be handled in accordance with FAR 52.212-1(f) "Late Submissions". The clarification information will be incorporated as part of the proposal.
(2) The lowest priced technically acceptable proposal will be deemed the successful offeror and award shall be made to this offeror, subject to a positive responsibility determination.
(e) Technical Area:
(1) A technical review team composed of key Government personnel will use their technical skill, knowledge and experience to thoroughly review the adequacy of proposals. Each proposal will be evaluated by application of the assessment criteria to each subfactor in the technical proposal. Only those proposals determined technically acceptable will be considered for award. Factor 1 and its subfactor will be considered acceptable or unacceptable as defined below:
- Acceptable: Proposal meets the minimum requirements of the solicitation.
- Unacceptable: Proposal does not meet the minimum requirements of the solicitation
(2) Offerors must pass all Technical subfactors in order to be deemed technically acceptable:
(f) : Part I - Technical Proposal (Factor 1)
(1) The review team will ensure the technical proposal does not make reference to price data. ALL subfactors must be deemed acceptable in order to be technically acceptable.
(2) The review team will ensure the technical proposal primarily describes the capability of offeror's organization to perform the requirements of the contract and is specific and complete. The proposal shall not merely offer to perform work in accordance with the Performance Work Statement but shall outline the actual method proposed as specifically as possible. Non-conformance with the instructions provided may result in an unacceptable technical evaluation.
(3) The proposal shall be clear, concise, and shall include sufficient detail for effective evaluation and for substantiating the validity of stated claims. The proposal should not simply rephrase or restate the Government's requirements but, rather, shall provide convincing rationale to address how the offeror intends to meet these requirements. Offerors shall assume that the Government has no prior knowledge of their facilities or experience and will base its evaluation on the information presented in the offeror's proposal.
(4) In addition to Factor 1, your technical proposal contained the information specified below:
Subfactor 1 - Continuation of Essential Contractor Services. This subfactor is met if the offeror provided a written plan describing how it will continue to perform the essential contractor services as described in DFARS 252.237-7024, Notice of Continuation of Essential Contractor Services.
(g) Part II - Past Performance (Factor 2):
(1) Past performance shall be evaluated in accordance with FAR 15.305 and DFARS 215.305. The comparative assessment in FAR 15.305(a)(2)
(i) does not apply. Therefore, past performance will be rated on an "acceptable" or "unacceptable" basis as defined below:
- Acceptable: Based on the offeror's performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort, or the offeror's performance record is unknown. (See note below.)
- Unacceptable: Based on the offeror's performance record, the Government has no reasonable expectation that the offeror will be able to successfully perform the required effort.
Offerors shall use the 2-page Attachment 4, Past Performance Questionnaire for the basic information of each contract and provide no more than three (3) of the most recent and `relevant (defined below) contracts performed for federal agencies and commercial customers.
- Recent is defined as within the last five (5) years (contract must be currently on-going or started no earlier than May 2018).
- Relevant is defined as contract work in the area of ISWM (Refuse Collection Services) as identified in the scope of work of the Performance Work Statement (Attachment 1to this solicitation).
The Government will determine relevance by analyzing the "scope", "magnitude" and "complexity" of the reference contracts and comparing them to the instant requirement. The Government reserves the right to evaluate submitted projects individually or in the aggregate in order to determine relevance and will do so consistently across all evaluated offers. The Government will also consider the quality of the Contractor's relevant past performance.
The Government reserves the right to obtain information for use in the evaluation of past performance from any and all sources including sources outside of the Government. The Government will consider the quality of an offeror's past performance. This consideration is separate and distinct from the Contracting Officer's responsibility determination. The assessment of the offeror's relevant past performance will be used as a means of evaluating the relative capability of the offeror to successfully meet the requirements of the RFQ.
Note: In the case of an offeror without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the offeror may not be evaluated favorably or unfavorably on past performance (see FAR 15.305 (a)(2)(iv)). Therefore, the offeror shall be determined to have unknown past performance. In the context of acceptability/unacceptability, "unknown" shall be considered "acceptable."
(h) Part III - Price Area/Data (Factor 3)
(1) Price Area - The offeror's proposal price will be determined by multiplying the quantity times the unit price for the CLIN (Contract Line Item Number) and totaling the product of that calculation for all priced CLINs, (Base and all Option periods) to arrive at a total estimated contract value. It is reiterated from FAR 52.212-2: "The total price of the proposal inclusive of all CLINs for the base period, all possible option periods to be exercised under FAR clause 52.217-9, and/or any possible extension under FAR clause 52.217-8 for six (6) months (using the last option's figures) will be evaluated" amongst the other proposals and the IGE for reasonable and realism. Unbalanced pricing or failure to include pricing for all CLINS (Base and Options periods), will render proposal pricing as non-responsive.
a. The offerors price evaluation criteria will not be rated but will be evaluated for reasonableness and will be used in determining the best value to the Government. For a price to be reasonable, it must represent a price to the Government that a prudent person would pay when consideration is given to prices in the market. Normally, price reasonableness is established through adequate price competition, but may also be determined through price analysis techniques as described in FAR 15.404.
b. Additionally, the price proposal may also undergo a price realism evaluation for the purpose of measuring the Contractor's understanding of the solicitation requirements and for assessing the performance risk inherent in the Contractor's price.
c. The Contractor is cautioned that its proposal may be rejected if it is found to be materially unbalanced in the base period or any option periods. Unbalanced pricing exists when, despite an acceptable total evaluated price, the price of one or more line items is significantly overstated or understated.
d. Unbalanced pricing or failure to include pricing for all CLINS (Base and option periods), will render proposal pricing as non-responsive.
(2) Price Data - This section of the proposal shall include only the following:
a. The signed Standard Form 1449, Solicitation/Contract, returned in its entirety along with all required fill-in documents, not in SAM (Do return attachments, ).not except Attachment 4, Past Performance Questionnaire
b. Complete all blanks for and /total prices for Base and Option Years.unit extended
c. Any, signed, solicitation amendments thereto.
END Addendum to 52.212-2, Evaluation--Commercial Products and Commercial Services (Nov 2021)
(End of provision)
| IDCode: |
| Page: 1 |
| Pages: 6 |
| AmendNo: 0001 |
| EffDate: 07 Jun 2023 |
| ReqNo: |
| ProjNo: |
| IssCode: FA4801 |
| AdmCode: |
| IssuedBy: FA4801 49 CONS LGCP |
490 1ST ST BLDG 29 STE 2160, CP 575 572 3047
HOLLOMAN AFB, NM 88330-8225
UNITED STATES
ERIK MONTGOMERY, Email: erik.montgomery.10@us.af.mil Telephone: 575-572-2203
| AdminBy: | |
| ContractorNameAdd: | |
| Code: | |
| FacCode: | |
| SolChg: 1 | |
| SolNo: FA480123Q0006 | |
| SolDate: 06 Jun 2023 | |
| AwardChg: Off | |
| AwardNo: | |
| AwardDate: | |
| Amended: 1 | |
| OffrExt: Off | |
| OffrNoEx: 1 | |
| NoCopies: 1 | |
| ApprData: See Section G - Contract Administration Data | |
| ChgeOrd: Off | |
| ChgeOrder: | |
| Modify: Off | |
| SuppAgre: Off | |
| SuppAuth: | |
| ModOthr: Off | |
| OthrSpec: | |
| NoReq: Off | |
| Require: 1 | |
| Copies: 1 | |
| Descript: See Schedule | |
| ContNameTitle: | |
| CoNameTitle: Joshua D. Moody | |
| ContDate: | |
| 2023-06-07T10:55:17-0600 | |
| MOODY.JOSHUA.DEAN.1127447264 |
CODate: 07 Jun 2023
File details come from the government source that posted it. Updated .