SOR ANDERSON FIELD HOUSE REVISED.pdf
PDF 180 KB Posted
- Attached to
- FITNESS CENTER SECURITY CAMERAS
- Solicitation number
- FA480025QA080
About this file
This Statement of Requirement details a comprehensive security system installation for Anderson Field House at Fort Eustis. The project involves installing an All Access Control System and a 30-camera CCTV system (24 fixed cameras and 6 PTZ cameras) to enhance security and enable after-hours access capabilities. The system will be installed in compliance with DAFI 34-114 3.3.1.2, which mandates monitoring systems in areas without direct staff line of sight.
The detailed equipment list includes specific hardware such as an OnGuard 32ES 2 Door Server Software Entry package, HID smart card readers, multiple monitors, network switches, power supplies, and various installation components. The contract includes a 1-year initial warranty with options for 4 additional years of extended warranty maintenance. Key maintenance services include yearly site visits, equipment updates, camera cleaning and refocusing, help desk support, and on-site repairs. The solicitation is managed by the Department of the Air Force Air Combat Command, with quotes due by July 23, 2025, and an award to be made on a "Best Value" basis in accordance with FAR Part 13 procedures.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Requirement
Anderson Field House
OVERVIEW
Installation of All Access Control System and a 42 Camera CCTV System for security purposes and to enable after-hours access capabilities. DAFI 34-114 3.3.1.2 states that the Fitness and Sports manager must have a monitoring system (cameras or a duress alarm if a camera is not appropriate) installed in areas of the facility where staff or contractors do not have direct line of sight. There are currently no existing security cameras at Anderson Field House.
GENERAL REQUIREMENTS
Description/Part Number Quantity OG-32ES-2NCR2 OnGuard 32ES 2 Door Server Software Entry package - includes OnGuard Server software license [1] SWS-32ES; OnGuard Credential Center Client software [1] SWC-IDES; [1] LNL-2220 intelligent system controller; [1] LNL-OLS75ACTX power supply with cabinet and first year support plan for new systems
PC w/ 22" monitor and USAF Standard Desktop configuration 1 HID RP40 PIV Smart Card Reader, Black 2 USB dual frequency enrollment reader 1 TEG-S80G Gigabit Ethernet Switch 1
E750RTXL2U 750VA UPS 1
PS2BB Lock Power Supply 1 VLP-M-3327-360 Electric Latch Retraction surface vertical rod HW w Lever Trim( 36" IN
313 OR 626 FINISH)
DL-20 Door Cords 1 ABH-10812 Rod Protectors 1 IC-7 Cylinder Housing 1 WG-3206110 32061109 22/6 Shielded Plenum 1 WG-31141101 18/2 Plenum 1 DW-VAONE164T-L-VMAX A1 Universal High Definition 1080P via Coax, Records all HD Formats and All Analog to 960H, H.264, 16ch, 4 terabyte
DWC-V6263WTIR - Star-Light Universal HD Series, Vandal Dome 30 DWC-V1JUNC - Junction Box for select Dome Cameras / Not Compatible with Value Dome Cameras
P3AC24-16-8L Camera Power Supply 3 24” Monitor 4 32” Monitor 1 0E-40AM1337 Full Motion Monitor Wall Mount 3 SF-EM080735 Instrument Box 1 WG-65086108 Siamese Plenum Coax 16 GE-30100TP BNC Connector 90 HDMI Cable to Display Port 1
HDMI Cable 15' 4 Cat5 Plenum Cable 1
580015 1" EMT 10' 30
856320 1" EMT One Hole Strap (4pack) 10 150220 1" EMT 90 Pull Elbow Inside Corner 4 605840 1" EMT Set Screw Connector 60 605948 1" EMT Set Screw Coupler 30 330979 1" EMT Pull Elbow 8 100168807 1" EMT 45-Degree Elbow 5 12' Ladder Rental-Daily 14
Please Note:
• Please include all labor, parts, travel, and 1 Year “bumper to bumper” warranty to get system to normal operations
WARRANTY
In addition to purchasing the necessary products for the All Access Control System, an extended warranty for 4 additional year is needed. The scope of the extended warranty maintenance necessary are detailed below:
Preventative Maintenance Scope:
• Yearly site visit to perform required application updates to installed equipment
• Camera cleaning, refocusing, adjusting zoom levels
• Cleaning DVRs, Door hardware, and Computer
• Q&A session with management covering training and reporting
• Door hardware equipment is limited to the electric door actuator only
• Help Desk Support
• All labor and travel expenses are included
Corrective Maintenance Scope:
• As needed Site Visit to replace parts to normal operations
• Does not include cameras installed by others
• Door hardware equipment is limited to the electric door actuator only
• Help Desk Support
• All labor and travel expenses are included
The CLIN structure will be outlined below:
0001 Installation of All Access Control System and a 42 Camera CCTV System, and 1 year warranty
1001 Year 2 Extended Warranty Maintenance
2001 Year 3 Extended Warranty Maintenance
3001 Year 4 Extended Warranty Maintenance
4001 Year 5 Extended Warranty Maintenance
1. DESCRIPTION OF SERVICE: The purpose of this contract is to install an All Access Control System and a 30 Camera (24 fixed cameras / 6 PTZ cameras) CCTV System for security purposes that can identify persons and to enable after-hours access capabilities. DAFI 34-114 3.3.1.2 states that the Fitness and Sports manager must have a monitoring system (cameras or a duress alarm if a camera is not appropriate) installed in areas of the facility where staff or contractors do not have direct line of sight. There are currently no existing security cameras at Anderson Field House. Central location for recording with 24/7 recording.
1.2 DEMOLITION AND REMOVAL: The Contractor is responsible for all demolition debris removed from the site and off of JBLE-Eustis. The Contractor shall be responsible for all disposal permits and regulation requirements. The Contractor shall coordinate with the Base Civil Engineer Group (CEG) or Squadron (CES) to confirm proposed haul route and access gate locations and transportation of any imported/exported demolition or borrow materials within and outside the Base.
1.3 INSTALLATION: The contractor shall install an All Access Control System and a 30 Camera (24 fixed cameras / 6 PTZ cameras) CCTV System for security purposes and to enable after-hours access capabilities. Diagram shows location of each camera.
2. HAZARDOUS CONDITIONS. During the course of performing work under this contract, should the contractor find conditions existing that prevent the performance of task specified; the Contracting Officer shall be immediately notified.
3. GOVERNMENT FURNISHED PROPERTY AND SERVICES. The Government will provide reasonable utilities and work space for the contractor to perform the requested duties. There are no covered or secure storage areas available. The contractor will provide all equipment and storage media necessary to perform tasks.
3.1. TOILET FACILITIES: Use of existing toilet facilities in the immediate work area only will be permitted. Contractor personnel will ensure facility cleanliness is maintained at all times.
3.2. SECURITY POLICE, FIRE PROTECTION AND FORCE PROTECTION: Forms of force protection may be required by the Base. The Contractor shall coordinate any placement of storage sheds (if required) with AT/FP criteria. The Contractor shall refer to UFC 4-010-01, DoD Minimum Antiterrorism Standards for Buildings, for additional requirements.
3.3. The government will provide general on-base security police and fire protection service.
3.4. TELEPHONE: The government shall not provide telephone services. If available, contractor may use government phones in a case of emergencies or during field and site work. No long distance telephone calls will be authorized.
3.5. HOURS OF OPERATION. Working hours for the contractor will normally be between the hours of 8:00 AM and 5:00 PM excluding Saturdays, Sundays, and Federal holidays. If the Contractor desires to work during periods other than above, additional government inspection forces may be required. The Contractor must make his/her request to the Contracting Officer five (5) calendar days in advance of his/her intention to work during other periods to allow assignment of additional inspection forces. If such force is reasonably available, the Contracting Officer may authorize the contractor to perform work during periods other than normal duty hours/days.
Scissor lift will be accessible from Fitness Centers during these hours.
3.6. OSHA REQUIREMENTS: All Contractor operations shall be conducted and performed in accordance with Department of Labor, OSHA requirements found in 29 CFR 1910 and 29 CFR 1926, project identified national standards, military manuals, instructions, pamphlets, standards and handbooks, and with the Corps of Engineers (COE) Safety Manual 385-1-1, dated 03 Sep 96.
4. DISPOSITION OF WASTE, EXCESS, SCRAP, AND SALVAGE MATERIALS: The title to all waste, excess, scrap, and salvage materials generated as a direct result of this contract is vested in the Contractor -unless specifically excepted below. Further (unless listed below in exceptions), these materials shall be disposed of off the Base by the Contractor in accordance with all applicable Federal, State, and Local Regulations. Following is a list of materials (Exceptions) that will be generated as a result of this contract and shall be turned-into the Government at a location at JBLE-Eustis designated by the Contracting Officer:
EXCEPTIONS: None.
5. RADIATION PERMITS AND AUTHORIZATIONS. Contractors contemplating the use of devices containing radioactive materials (i.e., soil moisture/density probes) or non-ionizing radiation producing equipment (radio frequency radiation emitters or lasers) while performing work on this contract must obtain written authorization/permit from the Fort Eustis Radiation Safety Officer (RSO), X ADOS/SGGB. To obtain the required authorization permit, an application to bring a radioactive device on Fort Eustis must be forwarded to 78 ADOS/SGGB, (this is mailing address, physical address is 880 Third St.) or (915)696-2325/3289, at least 45 days prior to the anticipated use. Without the proper authorization, Contractors will not be allowed to bring these devices on base. Also, Contractor shall provide Bioenvironmental Engineering (78 ADOS/SGGB) a copy of contractor’s radioactive materials permit and training certificates, if radioactive material will be brought onto Fort Eustis.
6. SECURITY REQUIREMENTS.
6.1. LEVELS OF SECURITY. Fort Eustis security may be viewed as being one of three broad levels, the level in effect being dependent on the location or AREA of Fort Eustis in question.
6.1.1. The lowest level of security exists in “GENERAL ACCESS” areas. These areas are all of Fort Eustis outside of the "USAF Controlled" and "USAF Restricted" areas.
6.1.2. “USAF Controlled” access areas are the mid-level security areas. Presence within the CONTROLLED ACCESS AREA is by authorization; however, the movement of authorized personnel in and out of these AREAS is generally not impeded.
6.1.3. The highest level of security on Fort Eustis is that within the “USAF RESTRICTED AREAS”.
These areas are subdivided to be known as Protection Level 1, 2 or 3 AREAS. Work schedule requests or changes to existing schedules for work to be performed in a “USAF RESTRICTED AREA” shall be submitted at least 7 calendar days in advance for approval and coordination of Fort Eustis Security Forces.
6.1.4. Closed Base. Fort Eustis is considered a closed base. All personnel entering must have specific permission of the installation commander for entry. This permission is granted when a Contractor employee is issued an identification card. The Contracting Officer will provide information necessary to obtain identification cards. The contractor shall be responsible to ensure that all of its employees obtain, and keep on their person at all times while working on the base, a USAF identification card. Upon completion of the work or termination of an employee, the contractor shall be responsible for turn in of identification cards to the Contracting Officer or to the Pass and Registration Office of the Security Forces.
NOTE: Failure to turn in badges will result in WITHHOLDING OF FINAL PAYMENT and revocation of any future badges issued by Pass and Registration Office to the employee and the contractor.
7. IDENTIFICATION OF CONTRACTOR VEHICLES. Contractor vehicles must be marked on each side with company name with either permanent or semi-permanent/magnetic signage.
File details come from the government source that posted it. Updated .