This document is a vendor questions and answers file for a federal contract opportunity to install a CCTV camera and access control system at Anderson Field House, Fort Eustis. The project requires installing 30 cameras (23 fixed, 7 PTZ), with key specifications including IP-based cameras, dome-style cameras, 24/7 recording, 12-day video retention, and an access control system supporting both CAC and proximity cards. The system will integrate with SmartNet VMS platform and require monitoring at the Field House front desk and an off-site base location.
Specific technical details include using Cat5e wiring strapped to existing conduit, removing old analog infrastructure, installing cameras to eliminate interior blind spots (excluding restrooms/locker rooms), and providing monitors. The contractor is responsible for the locksmith quote, access cables, and using NDAA-approved cameras. The solicitation is issued by the Department of the Air Force Air Combat Command, with quotes due July 23, 2025, and an expected contract validity through September 30, 2025. The award will be made on a "Best Value" basis in accordance with FAR Part 13 procedures.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUESTIONS FROM VENDORS- ANDERSON FIELD HOUSE CCTV CAMERAS.
1. What is the camera / NVR manufacture? In the SOR they mention analog, do we need to provide analog or IP solution? - IP
2. What type of cameras are they wanting (dome, bullet)? - DOME
3. Recording requirements? – 24/7
4. Are we providing the cable? - YES
5. Are we responsible for switches?
6. Do we need to provide monitors or workstations? - MONITORS
7. Do we need to provide a lift? - NO
8. What manufacture access control is required?
9. What type of readers?
10. Who is responsible for the locksmith quote? - CONTRACTOR
11. Are we responsible for the access cable? - YES
12. Proxy cards – can you please send us a picture from the box with the formats currently used and that they bought from Amazon, so we can provide you with the same format to be used on both buildings for compatibility?
13. Reader to be installed on the handy cap button access side and integrated to the vertical rod locking mechanism. - YES
14. VMS system:
15. What is the current VMS system platform used in the other building where cameras are monitored online? - SMARTNET
16. What will be/ or do you need specific brand name of cameras to replace the analog cameras posted in the BOM.
17. DWC-V6263WTIR - Star-Light Universal HD Series, Vandal Dome 18. 1
19. DWC-V1JUNC - Junction Box for select Dome Cameras / Not
Compatible with Value Dome Cameras
20. 1
21. Our count indicated current needed 19 cameras at the location. We can recommend you use NDAA approved cameras if needed. – IT’S 30 CAMERAS
22. Requested storage 24/7 recording was 12 days – please confirm that - YES
23. Client said that they will provide and install screen in the main entrance area for local view of cameras – please confirm that this is still the case? - YES
24. Client – do they need to demo all old coax wiring from old cameras? - YES
25. Client – as per conversations, they are OK with new Cat5e wiring strapped to the existing conduit – is that still the case? - YES
26. Pool area – 2 dome cameras – they need to be rated for outdoor use – do you have particular part needed for them or you need our recommendations ? – Need recommendations
27. It was mentioned during the site visit that no outdoor cameras are needed. Can the government please confirm that no external building cameras are required for this project? – THERE ARE NO OUTDOOR CAMERAS AT ANY FACILITY
28. Can the government confirm that the intent is to eliminate all interior "blind spots" within the Anderson Field House (excluding restrooms and locker rooms)? If so, will an updated floor plan with desired camera locations be provided, or is it the responsibility of the contractor to design a layout that meets this requirement?
29. The existing camera infrastructure appears to be analog-based. Can the government confirm that the new system is to be upgraded to an IP-based camera system, including infrastructure? – UPGRADED TO IP
30. Is there a preferred CCTV brand for integration purposes? If “or equal” products are accepted, must the system integrate with any existing base-wide platforms, or will it function as a standalone system exclusively for the Field House? It was mentioned that monitoring will be needed at the Field House front desk and at another off-site base location. Please confirm.
31. Should the existing analog power and coax cabling be fully removed and demoed as part of the new infrastructure installation? - YES
32. Can the government confirm that a lift is available on site for use by the contractor, with the understanding that the contractor must provide its own harnesses and safety equipment? - YES
33. It was stated during the site visit that new infrastructure does not require conduit installation. Please confirm that this is correct. – CONDUIT NOT REQUIRED
34. Regarding the front door access control reader, does this need to support CAC credentials and integrate with any Active Directory or base-wide system, or will it be a standalone proximity card reader managed locally by the Field House? – NEEDS
TO SUPPORT BOTH
35. Please confirm that no access control reader is required on the ADA-equipped doors. – CAC/CARD READER WILL BE ON ADA DOOR
36. What is the required frames-per-second (FPS) quality specification for the installed cameras?
37. What are the retention requirements for the video surveillance system? A YEAR IF
POSSIBLE, AT MINIMUM 6 MONTHS
38. What are the camera manufacturer and model requirement? – IP CAMERAS / NEED
TO IDENTIFY