This is a Questions and Answers document relating to an air duct cleaning project for Building 763 at an Air Force facility. The Q&A clarifies that no cutting into hard surfaces (walls/ceilings) is required, as all ductwork is located in drop tile or open ceilings. There are no testing or air monitoring requirements beyond visual inspection, and the scope is limited to cleaning only, with no repairs or replacements required.

The document reveals there are no existing drawings for building 7634 and no records of previous duct cleaning at these locations. Regarding duct specifications, the ductwork inside the building with the drop tile ceiling is externally wrapped, while the ductwork at the main two units inside the mechanical room has interior lining. This contract opportunity is being managed by the Department of the Air Force Air Combat Command under solicitation number FA480025QA020.

View the file

Other files

File Type Posted
STATEMENT OF WORK- BLDG. 763 Updated 01 21 2025.pdf PDF
Questions and Answers.docx DOCX document
Base Form Template.pdf PDF
Combined Synopsis Solicitation.pdf PDF
STATEMENT OF WORK- BLDG. 763 Updated.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

0. Please confirm that hard surfaces (e.g. Walls/Ceilings) are not required to be cut into in order to facilitate cleaning.

All duct work is located in a drop tile ceiling or open ceiling

1. Please confirm there are no testing or air monitoring requirements.

Visual inspection only

1. Please confirm that repairs and/or replacements are not required.

Cleaning only

1. Has duct cleaning even been performed at these locations?

We do not have any information when or if its ever been cleaned

1. Are there any drawings?

No we have no drawings for building 7634

1. Are the ducts interior lined or exterior lined?

From my understanding all duct work inside the building with the drop tile ceiling is externally wrapped and the duct work at the main 2 units inside the mechanical room are interior.