FA480016T0003_Questions_and_Answers.pdf

PDF 67 KB Posted

Attached to
Inspection and Maintenance of Cranes & Hoists
Solicitation number
FA4800-16-T-0003
Issued by

About this file

Questions and Answers

View the file

Other files

File Type Posted
FA480016T0003_Questions_and_Answers.docx DOCX document
FA4800-16-T-0003_Conformed.docx DOCX document
FA4800-16-T-0003_Amendment_0001.pdf PDF
FA4800-16-T-0003_PWS_dated_3_Mar_16.docx DOCX document
MFR_-_Notice_to_Interested_Parties.pdf PDF
FA480016T0003_Questions_and_Answers.docx DOCX document
52.212-1_Full_Text.pdf PDF
RFQ_Cranes_ _Hoists_Inspection_and_Maintenance-signed.pdf PDF
WD_2015-4341.pdf PDF
FA4800-16-T-0003_Crane_and_Hoist_(PWS).docx DOCX document
RFQ_Feb_2016.docx DOCX document
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REFERENCE: Solicitation FA4800-16-T-0003 Ft Eustis Inspection/Maintenance of Cranes & Hoists

Questions and Answers

Question No: 1 - Request the "emergency Response” time be increased from 2 hours to a minimum of 4 hours to allow time to arrive on base.

ANSWER: This request was considered and PWS Paragraph 1.1.4.2 Emergency Calls is changed to read “The Contractor shall in turn respond to emergency service calls no later than three (3) hours upon notification and survey the scope of work involved and provide service.” Four (4) hours emergency response time is not feasible to support the mission and will not be considered.

Question No: 2 What is the small business size standard for this solicitation?

ANSWER: Solicitation is 100% Small Business Set-Aside under NAICS Code 811310 Size Standard 500 employees.

Question No: 3 Can there be a site visit to see the equipment to be inspected? A site visit will not be scheduled.

Question No: 4 More information was requested in regard to the following:

• Hoist height: Hoist heights range from 10—30 feet in large hangers at several locations on the installation.

• Lift accessibility: There are no on-site lifts. All lifts will need to be furnished by the contractor.

• Ladder access: There is no ladder access to any of the cranes or hoists. The contractor will need to provide ladder access.

• Test weight access door: Yes, there is a test weight access door.

• Security or escort requirements: One building will require an escort for access. All other buildings and hangars are training areas and will not require an escort. Refer to PWS paragraph

1.3 for installation and building access.

NOTE: Paragraph 1.0 Scope of Work reference to subsection 1.1.8.1 should read 1.1.6.2.

Paragraph 1.1.4.1 Repair Service Calls Reference to subsection 1.1.8.3 should read 1.1.6.4.

Paragraph 1.1.4.2 Emergency Calls Reference to subsection 1.1.8.3 should read 1.1.6.4.

Paragraph 1.1.6.2 Inspection Reports and Certificates Reference to subsection should read 1.1.6.3