FA480016T0003_Questions_and_Answers.pdf
PDF 67 KB Posted
- Attached to
- Inspection and Maintenance of Cranes & Hoists
- Solicitation number
- FA4800-16-T-0003
About this file
Questions and Answers
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FA480016T0003_Questions_and_Answers.docx | DOCX document | |
| FA4800-16-T-0003_Conformed.docx | DOCX document | |
| FA4800-16-T-0003_Amendment_0001.pdf | ||
| FA4800-16-T-0003_PWS_dated_3_Mar_16.docx | DOCX document | |
| MFR_-_Notice_to_Interested_Parties.pdf | ||
| FA480016T0003_Questions_and_Answers.docx | DOCX document | |
| 52.212-1_Full_Text.pdf | ||
| RFQ_Cranes_ _Hoists_Inspection_and_Maintenance-signed.pdf | ||
| WD_2015-4341.pdf | ||
| FA4800-16-T-0003_Crane_and_Hoist_(PWS).docx | DOCX document | |
| RFQ_Feb_2016.docx | DOCX document |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REFERENCE: Solicitation FA4800-16-T-0003 Ft Eustis Inspection/Maintenance of Cranes & Hoists
Questions and Answers
Question No: 1 - Request the "emergency Response” time be increased from 2 hours to a minimum of 4 hours to allow time to arrive on base.
ANSWER: This request was considered and PWS Paragraph 1.1.4.2 Emergency Calls is changed to read “The Contractor shall in turn respond to emergency service calls no later than three (3) hours upon notification and survey the scope of work involved and provide service.” Four (4) hours emergency response time is not feasible to support the mission and will not be considered.
Question No: 2 What is the small business size standard for this solicitation?
ANSWER: Solicitation is 100% Small Business Set-Aside under NAICS Code 811310 Size Standard 500 employees.
Question No: 3 Can there be a site visit to see the equipment to be inspected? A site visit will not be scheduled.
Question No: 4 More information was requested in regard to the following:
• Hoist height: Hoist heights range from 10—30 feet in large hangers at several locations on the installation.
• Lift accessibility: There are no on-site lifts. All lifts will need to be furnished by the contractor.
• Ladder access: There is no ladder access to any of the cranes or hoists. The contractor will need to provide ladder access.
• Test weight access door: Yes, there is a test weight access door.
• Security or escort requirements: One building will require an escort for access. All other buildings and hangars are training areas and will not require an escort. Refer to PWS paragraph
1.3 for installation and building access.
NOTE: Paragraph 1.0 Scope of Work reference to subsection 1.1.8.1 should read 1.1.6.2.
Paragraph 1.1.4.1 Repair Service Calls Reference to subsection 1.1.8.3 should read 1.1.6.4.
Paragraph 1.1.4.2 Emergency Calls Reference to subsection 1.1.8.3 should read 1.1.6.4.
Paragraph 1.1.6.2 Inspection Reports and Certificates Reference to subsection should read 1.1.6.3