FA4800-10-R-0007
Attachment 7
PRICE EVALUATION SAMPLE
LANGLEY AFB COEFFICIENT SCHEDULE
(The values provided for coefficients and fees are provided as examples only)
NOTE 1: In instances where construction in high security areas is to be performed during standard hours and the Contractor can prove substantial increased costs due to access issues, the CO will consider approving use of the non-standard coefficient for the appropriate DO value.
CLIN
DESCRIPTION
CO-EFFICIENTS
Standard Non-Standard
0001AA
BASIC CONTRACT YEAR
.70
.75
1001AA
OPTION YEAR ONE
2001AA
OPTION YEAR TWO
3001AA
OPTION YEAR THREE
4001AA
OPTION YEAR FOUR
FT EUSTIS COEFFICIENT SCHEDULE
NOTE 1: In instances where construction in high security areas is to be performed during standard hours and the Contractor can prove substantial increased costs due to access issues, the CO will consider approving use of the non-standard coefficient for the appropriate DO value.
CLIN
DESCRIPTION
CO-EFFICIENTS
Standard Non-Standard
0001AB
BASIC CONTRACT YEAR
.72
.77
1001AB
2001AB
3001AB
4001AB
DESIGN FEES BY PROJECT MAGNITUDE (Langley AFB and Ft Eustis)
Project Magnitudes: LOW (L) = $2001 - $50,000
MEDIUM (M) = $50,001- $300,000
HIGH (H) = over $300,000
NOTE 1: Design fees are predominately for user agency funded projects, and are meant to reduce requests for proposal for projects that are not mission essential, and to compensate the contractor for his design effort. The contractor shall honor the pricing of awarded designs for one year from the date of award.
NOTE 2: Fiscal year end projects, straddle bid, and projects with advance contracting authority are not eligible for design fees as they have guaranteed construction funding.
NOTE 3: In rare instances an existing 100% designed project already in the government’s possession but requiring extensive changes will be submitted as a new requirement. In this case, the contractor will be paid 55% of rates indicated below applicable to the appropriate magnitude. The percentage will cover all costs required to revise the design.
NOTE 4: The following CLINS will not be incorporated as actual CLINs of the contract, but the pricing will be annotated in the extended description of the respective annual CLIN.
PROJECT MAGNITUDE
L M H
BASIC CONTRACT YEAR
0006AA
$100
0006AB
$2000
0006AC
$3000
0007AA
0007AB
0007AC
L M H
0008AA
0008AB
0008AC
0009AA
0009AB
0009AC
0010AA
0010AB
0010AC
Pricing Evaluation Matrix:
SUM OF COEFFICIENTS
Sum of Langley Coefficients
Base Year standard non standard
Total: .70 + .75 = 1.45 X $9M = $13,050,000 Option Yr 1 standard non standard
Total: .70 + .75 = 1.45 X $9M = $13,050,000
Option Yr 2 standard non standard
Total: .70 + .75 = 1.45 X $9M = $13,050,000
Option Yr 3 standard non standard
Total: .70 + .75 = 1.45 X $9M = $13,050,000
Option Yr 4 standard non standard
Total: .70 + .75 = 1.45 X $9M = $13,050,000
Langley Coefficient Total = $62,250,000 Sum of Ft Eustis Coefficients
Base Year standard non standard
Total: .72 + .77 = 1.49 X $9M = $13,410,000 Option Yr 1 standard non standard
Total: .72 + .77 = 1.49 X $9M = $13,410,000
Option Yr 2 standard non standard
Total: .72 + .77 = 1.49 X $9M = $13,410,000
Option Yr 3 standard non standard
Total: .72 + .77 = 1.49 X $9M = $13,410,000
Option Yr 4 standard non standard
Total: .72 + .77 = 1.49 X $9M = $13,410,000
Ft Eustis Coefficient Total=$67,050,000 Design Fees (Langley and Ft Eustis) :
CLIN Fee ($) X nominal # of projects = Extended cost
0011AA
$100 X 5
$500
0011AB
$2,000
X 10
$20,000
0011AC
$3,000
X 5
$15,000
0012AA
0012AB
$2,000
X 10
$20,000
0012AC
0013AA
0013AB
$2,000
X 10
$20,000
0013AC
0014AA
0014AB
$2,000
X 10
$20,000
0014AC
0015AA
0015AB
$2,000
X 10
$20,000
0015AC
Design Fee Total:
$177,500 Summary of pricing:
Langley AFB:
Sum of Design Fees $177,500 Coefficient Total
+ $62,250,000 LAFB Grand Total = $62,427,500 Fort Eustis:
Sum of Design Fees $177,500 Coefficient Total
+ $67,050,000 Ft Eustis Grand Total = $67,227,500 LAFB Total $62,427,500 Ft Eustis Total + $67,050,000
GRAND TOTAL $129,655,000
The $9M price used to calculate the coefficient cost is for evaluation purposes only