DRAFT_Atch_2_AF_Form_103_Work__BCE_Clearance_Request_-_1_Aug_94.pdf

PDF 18 KB Posted

Attached to
Multiple Award Construction Contract (MACC) Federal contract opportunity
Solicitation number
FA469019RA003
Issued by
Department of the Air Force Air Combat Command

About this file

This document contains a draft base civil engineering work clearance request form and information about a related multiple award construction contract solicitation. The work clearance request form is used to coordinate any work that may disrupt base operations or utilities with key stakeholders, and details the type of work, requested clearance dates, required approvals, and safety precautions. The related solicitation will be for indefinite delivery indefinite quantity construction contracts at Ellsworth Air Force Base, set aside for Service Disabled Veteran Owned Small Businesses, SBA certified 8(a) Small Disadvantaged Businesses, and HUBZone businesses. The NAICS code is 237990 and annual revenue size standard is $36.5 million. The solicitation will provide for new construction, renovation, alteration, demolition, and repair work in a variety of trades. The contract period will be from date of award to June 2021 with a minimum guarantee of $500 per contract and maximum value of $18 million total. The solicitation will be issued via FBO and available on or around November 14, 2018.

DRAFT Atch 2 AF Form 103 BCE Clearance

View the file

Other files for this federal contract opportunity

Other files attached to Multiple Award Construction Contract (MACC), newest first.
File Type Posted
Atch_32_-_Follow_on_Q&A_Updated_1MAY19.pdf PDF
Solicitation_Amendment_FA469019RA0030013_SF_30.pdf PDF
Solicitation_Amendment_FA469019RA0030012_SF_30.pdf PDF
Atch_20f_Bid_Schedule-25_Apr_19.doc DOC document
Solicitation_Amendment_FA469019RA0030011_SF_30.pdf PDF
Atch_20a_GIPR_23APR19.pdf PDF
Solicitation_Amendment_FA469019RA0030010_SF_30.pdf PDF
Solicitation_Amendment_FA469019RA0030007_SF_30.pdf PDF
Attach_27_c_CE_Track_Manholes.pdf PDF
Attach_27_a_Site_Vist_QAs_as_of_6_Mar_19.pdf PDF
Solicitation_Amendment_FA469019RA0030006_SF_30.pdf PDF
Attach_27_bTrack_with_Contours_and_Utilities.pdf PDF
Solicitation_Amendment_FA469019RA0030004_SF_30.pdf PDF
Solicitation_Amendment_FA469019RA0030002_SF_30.pdf PDF
Atch_9_Submittal_Form_3000-1_Sep_03.pdf PDF
Atch_20a_GIPR_6NOV18.pdf PDF
Solicitation_-_FA469019RA003.pdf PDF
Atch_19_Past_Performance_Questionairre.docx DOCX document
Atch_2_AF_Form_103_Work__BCE_Clearance_Request_-_1_Aug_94.pdf PDF
Atch_16c_-_WD_SD180001_Heavy-Highway_6_Apr_18.pdf PDF
Atch_13_NAFGeneral_Provisions-21Jan15.pdf PDF
Atch_20e_6_Percent_Limit_on_Design_Fee_for_Contractors.pdf PDF
Atch_3_Submittal_Schedule_-20_Aug_15.pdf PDF
Atch_14_Contractor_Guide_-_16_Jun_15.pdf PDF
Atch_8_Exterior_Signs_-_10_Jun_05.pdf PDF
Atch_6_Design_CompatibilityStandards.pdf PDF
Atch_16d_-_WD_SD180033_Building-Meade_5_Jan_18.pdf PDF
Atch_21,_SECTION_L-_INSTRUCTIONS_TO_OFFERORS_18DEC18.pdf PDF
Atch_20f_Bid_Schedule-17_Oct_18.doc DOC document
Atch_16e_-_WD_SD180035_Building-Penn_5_Jan_18.pdf PDF
Atch_7_Ellsworth_Fire_Protection.pdf PDF
Atch_10_Electrical_Systems-15_Jan_15.pdf PDF
DRAFT_Atch_7_Ellsworth_Fire_Protection.pdf PDF
DRAFT_Atch_16d_-_WD_SD180033_Building-Meade_5_Jan_18.pdf PDF
DRAFT_Atch_20e_6_Percent_Limit_on_Design_Fee_for_Contractors.pdf PDF
DRAFT_Atch_20c_Drawing_1_Track_Utilities_Latrine_6NOV18.pdf PDF
DRAFT_Atch_5_Spec_Section_01800_-20_Aug_15.pdf PDF
DRAFT_Atch_11_Underground_Electrical_20Aug15.pdf PDF
DRAFT_Atch_20g_AF_Form_3052.xls XLS spreadsheet
DRAFT_Atch_3_Submittal_Schedule_-20_Aug_15.pdf PDF
DRAFT_Atch_14_Contractor_Guide_-_16_Jun_15.pdf PDF
DRAFT_Atch_9_Submittal_Form_3000-1_Sep_03.pdf PDF
DRAFT_Atch_20a_GIPR_6NOV18.pdf PDF
DRAFT_Atch_22_SECTION_M_Evaluation_Factors.pdf PDF
DRAFT_Atch_16a_-_WD_SD180002_Residental-Penn_5_Jan_18.pdf PDF
DRAFT_Atch_6_Design_CompatibilityStandards.pdf PDF
DRAFT_Atch_1_Utility_Outages.pdf PDF
DRAFT_Atch_10_Electrical_Systems-15_Jan_15.pdf PDF
DRAFT_Atch_15_Non-Nuclear_Intrusion_Det.pdf PDF
DRAFT_Atch_20f_Bid_Schedule-17_Oct_18.doc DOC document
Show all 50

Multiple Award Construction Contract (MACC) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cass Shop

Geo Base

MXG (If in airfield area)- Maj Sullivan, CMSgt Long, SMSgt Darling; Bldg: 7270 Rm: 127; Ph: 5824

DATE PREPAREDBASE CIVIL ENGINEERING WORK CLEARANCE REQUEST

(See Instructions on Reverse)

1. Clearance is requested to proceed with work at on Work Order No. , Contract No. , involving excavation or utility disturbance per attached sketch. This area has has not been staked or clearly marked.

2. TYPE OF FACILITY/WORK INVOLVED

G. AIRCRAFT OR VEHICULAR TRAFFIC FLOWA. PAVEMENTS D. FIRE DETECTION & PROTECTION SYSTEMS

H. SECURITYB. DRAINAGE SYSTEMS E. UTILITY OVERHEAD UNDERGROUND

I. OTHERC. RAILROAD TRACKS F. COMM OVERHEAD UNDERGROUND

3. DATE CLEARANCE REQUIRED 4. DATE OF CLEARANCE

5. SIGNATURE OF REQUESTING OFFICIAL 6. TELEPHONE NO. 7. ORGANIZATION

ORGANIZATION REMARKS (Use Reverse for additional comments) REVIEWER'S NAME AND INITIALS

8.

A. ELECTRICAL DISTRIBUTION

B A

S B. STEAM DISTRIBUTION

E

C. WATER DISTRIBUTION

C I

D. POL DISTRIBUTIONV

I L

E. SEWER DISTRIBUTION

E N

F. ENVIRONMENTAL

G

I

G. PAVEMENTS/ GROUNDSN

E

E H. FIRE PROTECTION

R

I

I. ZONEN

G

J. OTHER (Specify)

9. SECURITY POLICE

10. SAFETY

11. COMMUNICATIONS

12. BASE OPERATIONS

13. CABLE TV

14. COMMERCIAL UTILITY COMPANY

TELEPHONE

GAS

ELECTRIC

15. OTHER (Specify)

16. REQUESTED CLEARANCE APPROVED DISAPPROVED

17. TYPED NAME AND SIGNATURE OF APPROVING OFFICER (Chief of Operations Flight or Chief of Engineering Flight) 17a. DATE SIGNED

PREVIOUS EDITIONS ARE OBSOLETE.AF FORM 103, 19940801 (IMT-V1)

To include Cathodic and WIMS cable: Ralph Dupres/Mark Butler Bldg 8210 Ph. 5538/5541

H/W & Chilled Water Lines & Ice Melt at 7502 Mr. Davis, Bldg 8210, Ph 2503

28 CES Utilities Shop (To include irrigation lines) Mr. Smith, Bldg 8210, Ph. 5395 or 6222

Mr. Spicer/Mr. Fairey Bldg 8210, Ph. 2507 or 5402

28 CES Utilities Shop Mr. Smith or Mr. Israel Bldg 8210, Ph. 5395 or 6222

Compliance - Mr. Johnson, Bldg 8225 Ph. 2692 Restoration - Ms. Jensen, Bldg 8225 Ph. 2685

Mr. Macy or Mr. Malone, Bldg 7612 Dock #52 Ph. 2209 This includes RIDS (R/W Ice Detection System)

Mr. Beck Bldg 7502, 385-7306 Mr. Hilton, Fire Dept., Ph. 385-7305

Bldg 8210 Ph. 385-5143 Mr. Davis

Mr.Pape (CEN) Bldg: 1st floor bldg 8225; Ph: 385-6420

SFS Desk 5-4001 (Resource Security office near south door) Bldg 4400 Lori Watson Ph# 5-2988

Mr. Smartt or Mr. Walter, Base Ops.

Bldg 7501 Ph. 385-7233

Bldg 4307 Ph. 385-8353

MSgt Martinez (If on Airfield, Call Before You Dig) Base Ops, Bldg 7501 Ph. 385-1052/4275/1065

Mid-Continent Cable Quest One Stop 800-781-7474 Confirmation #

Telephone Systems O & M Contractor 385-1543 Bldg #4307

Natural Gas Maint.Mr. Smith/Mr. Israel Bldg 8210 Ph. 6222 or 5395

INSTRUCTIONS

The BCE work clearance request is used for any work (contract or in-house) that may disrupt aircraft or vehicular traffic flow, base utility services, protection provided by fire and intrusion alarm system, or routine activities of the installation. This form is used to coordinate the required work with key base activities and keep customer inconvenience to a minimum. It is also used to identify potentially hazardous work conditions in an attempt to prevent accidents. The work clearance request is processed just prior to the start of work. If delays are encountered and the conditions at the job site change (or may have changed) this work clearance request must be reprocessed.

18. REMARKS. (This section must describe specific precautionary measure to be taken before and during work accomplishment. Specific comments concerning the approved method of excavation, hand or powered equipment, should be included.)

AF FORM 103, 19940801 (IMT-V1) (REVERSE)