Attachment 08 Combined As Builts.pdf

PDF 13 MB Posted

Attached to
B11177 HVAC Replacement
Solicitation number
FA468624R0027
Issued by

About this file

This document is the Attachment 08 Combined As Builts related to the federal contract opportunity for the B11177 Remove/Replace Tool Crib HVAC Project at Beale AFB, CA.

The key details are: This is a solicitation for a construction project to remove and replace the HVAC system for the Tool Crib at Beale AFB, CA. The range of magnitude for this requirement is between $250,000 and $500,000. The NAICS code is 238220 with a $19,000,000 size standard, and the requirement is 100% set aside for small businesses. The project base CLINs 0001 and 0002 must be completed within 180 calendar days, factoring in 0 weather day delays. A site visit is scheduled for August 13, 2024, and proposals are due by September 3, 2024 at 3:00 PM PT. The solicitation documents will be provided electronically at no charge, and the contracting agency is the Department of the Air Force Air Combat Command.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

001 - G-1 GENERAL PROJECT LOCATION PLAN AND INDEX

002 - G-2 GENERAL STRUCTURAL NOTES
003 - G-3 GENERAL MECHANICAL LEGEND
004 - G-4 FIRE PROTECTION LEGEND AND SPECIFICATIONS
005 - G-5 GENERAL ELECTRICAL LEGEND
006 - C-2 CIVIL DETAILS
007 - A-1 ARCHITECTURAL FLOOR PLAN
008 - A-2 ARCHITECTURAL ENLARGED PLAN
009 - A-3 ARCHITECTURAL AWNING SECTIONS
010 - A-3 ARCHITECTURAL AWNING ELEVATIONS
011 - S-1 STRUCTURAL AWNING ROOF FRAMING PLAN, SECTION, & DETAILS
012 - S-2 STRUCTURAL FOUNDATION PLAN FOR MEZZANINE
013 - M-1 MECHANICAL NEW PLUMBING PLAN
014 - M-2 MECHANICAL HVAC PLAN
015 - F-1 FIRE PROTECTION NEW PLAN
016 - F-3 FIRE PROTECTION DETAILS
017 - E-1 ELECTRICAL SITE PLAN - BUILDING 11177
018 - E-2 ELECTRICAL ENLARGED PLAN
019 - E-4 ELECTRICAL ONE LINE DIAGRAM AND SCHEDULES
020 - E-5 PANEL SCHEDULES
021 - E-6 ELECTRICAL DETAILS
050-055 - SHOP DRAWINGS - MEZZANINE
056 - FP-1 FIRE PROTECTION NOTES AND DETAILS
057 - FP-3 FIRE PROTECTION DETAILS
058 - B11177-2005-VP AWNING SHOP DRAWINGS

File details come from the government source that posted it. Updated .