This document is a Request for Information (RFI) related to the replacement of sunshades at the Youth Center and Child Development Center. The RFI contains questions and answers regarding the specifications and requirements for the new sunshades, including desired UV block, wind resistance, and any preferred materials or installation methods. The government is also adding replacement of the large center sunshade at the Youth Center to the scope of work. There are no specific dimensions, technical drawings, or cost estimate provided, as vendors are expected to determine the appropriate sunshade specifications. The related federal contract opportunity is a solicitation for the YC/CDC Sunshade Replacement, with a Solicitation Number of FA468624Q0506, issued by the Department of the Air Force Air Combat Command. The government is looking for interested vendors to submit proposals in response to the RFQ Combo or Amendment, though no specific formats or templates are required.

View the file

Other files

File Type Posted
Amendment01-RFQCombo-YCCDCSunshades.docx DOCX document
SON _ Rev 01 _ CYP Sunshade_ 2024_Redacted.pdf PDF
WD-CA20240007-24May24.pdf PDF
RFQCombo-YCCDCSunshades.docx DOCX document
SON _ CYP Sunshade_2024.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Request for Information - CYP Sunshades
QuestionAnswer
Can you provide the dimensions/shape of the sunshades?This information could not be located. Vendors must determine the dimensions/shape of the sunshades
Is there a preferred material for the sunshade?Shades must have UV Block of 90 or higher and have a wind resistance of at least 145 mph.
Is there a required level of UV/SPF that the new sunshades must provide?Shades must have UV Block of 90 or higher
Contractors identified wear on the large center sunshade at the Youth Center that was not included on original Statement of Need. Contractors highly recommend replacing the center one at the same time as the outer four. Would you like this to be included in their proposals?Yes, the government would like the large center sunshade at the youth center replaced. This sunshade will be added to the scope of work in the statement of need.
Would we Sandblast the poles remove paint and repainting if yes what type of painting or is it just rust removal ?The only paint removal that may be needed would be to address rust issues. The poles would need to be returned to a condition that would match the remaining poles and be protected against rust.
For installation of the shades apparently, they are old type of installation our new hardware would like to be installed in different more effective way would that be an issue ?This is not an issue.
Is there a cost estimate , budget or ballpark figure for the project listed?At this time, we are not willing to disclose this information.
Is there an actual start date for the project?The start date will depend on when award of the contract takes place, but will ultimately be up to the awardee. We require interested vendors to provide a period of performance that will start upon issuance of the award.
Are there any specific requirements for the removal and disposal of the existing sunshades?The items should be removed off property at the contractors expense.
What are the exact dimensions and specifications for the new sunshades?This information could not be located. Vendors must determine the dimensions/shape of the sunshades
Is there a preferred type of material or manufacturer for the sunshades?Shades must have UV Block of 90 or higher and have a wind resistance of at least 145 mph.
Are there detailed technical drawings or plans available for the installation of the new sunshades?This information is not available.
Are there any specific formats or templates we should use for the proposal submission?Proposal submissions must include the completed RFQ Combo (or Amendment). All other information can be provided in the vendor's preferred format.
Who was the past incumbent for this project?Unknown
What was the contract amount for the previous project?Unknown
Can you provide the solicitation number for the previous project?Unknown