Attachment 06 RFI - Upgrade Electrical Overhead for 940 ARW SQ Ops AMU.pdf
PDF 317 KB Posted
- Attached to
- FA468624Q0024 Upgrade Electrical Overhead 940th
- Solicitation number
- FA468624Q0024
About this file
This document is a Request for Information (RFI) that contains questions and answers related to a federal contract opportunity for upgrading the electrical overhead for the 940th Air Refueling Wing Squadron Operations Aircraft Maintenance Unit at Beale Air Force Base.
The key details are:
- The project involves upgrading the electrical overhead, including the length, conductor size, and number of poles.
- The contract opportunity has a solicitation number of FA468624Q0024 and a value range between $25,000 and $100,000.
- The work is set aside for small businesses under NAICS code 238210.
- The project is to be completed within 60 calendar days, with a site visit scheduled for July 18, 2024 and proposals due by July 26, 2024.
- The contracting agency is the Department of the Air Force Air Combat Command.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment - FA468624Q00240001.pdf | ||
| Solicitation Amendment FA468624Q00240001 SF 30.pdf | ||
| Attachment 01 BAEY 1136627 - SON v1.docx | DOCX document | |
| Attachment 04 Wage Determination CA20230007.txt | TXT text file | |
| Attachment 02 BAEY 1136627 Electrical Site Plan.pptx | PPTX presentation | |
| Attachment 03 Schedule of Material Submittal.xlsx | XLSX spreadsheet | |
| Attachment 05 Contractor Entry Access List Form EAL.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BAEY 231056 / 1136627 – Upgrade Electrical Overhead for 940th
FA468624Q0024
RFI Questions and Answers
1. The It says class 2 poles but does not give the length Please provide length Answer: Length of Poles = 45 feet
2. What is the conductor size from pole 113 to 114 Answer: #4 Aluminum
3. What is the conductor size from pole from 118 to 114 Answer: Conductor size from D8-118 to D8-113 is 477 Aluminum.
4. What is the conductor size from pole 110 to 111 Answer: Pole 110 was demoed under another project.
5. Is there a requirement to provide generation for bldgs affected by the outage Answer: No
6. is there a time limit on the outage (duration) Answer: Would like to ensure minimal outage. Advice how long you think it would take to complete the work.