Attachment_21_-_Data_Request_Form__LIDAR.xls

XLS spreadsheet 57 KB Posted

Attached to
4 Bridges Federal contract opportunity
Solicitation number
FA468619RA002
Issued by
Department of the Air Force Air Combat Command

About this file

Attachment 21: Data Request Form LIDAR.

View the file

Other files for this federal contract opportunity

Other files attached to 4 Bridges, newest first.
File Type Posted
Sol-Conform-19RA002-Repair_4_Bridges.pdf PDF
Section_J-Atach_20-RFILog-19RA002-Repair_4_Bridges.xlsx XLSX spreadsheet
Section_J-Atach_20-RFILog-19RA002-Repair_4_Bridges.xlsx XLSX spreadsheet
Attachment_32.1-2014-02-10_4_Bridges_Updated_to_same_hort_vert_datum_as_AECOM.dwg DWG drawing
Attachment_31-4bridges.dwg DWG drawing
FA468619RA0020006_Conformed.pdf PDF
Attachments_32-2014-02-10_Modified_AECOM_Survey_Points_matches_4_bridges_NAVD29_dwg.csv CSV file
Attachment_19_-_Sign-In_Sheet-Site_Visit_19_Feb_2019.pdf PDF
Attachment_16_-_Riparian_Mitigation_Planting_Guidelines.pdf PDF
Attachment_24_-_C-03_.dwg DWG drawing
Attachment_23_-_C-02_.dwg DWG drawing
Attachment_26_-_G-02.dwg DWG drawing
Attachment_28_-_S-01_to_S-05.dwg DWG drawing
Attachment_29_-_BEALE_BRIDGES.CSV CSV file
Attachment_31_-_Xref_Beale_AFB__Four_Bridges_T.Blk_INFO.dwg DWG drawing
Attachment_17_-__Consultation_Summary.pdf PDF
Attachment_22_-_C-01.dwg DWG drawing
Attachment_20_-_RFI_Log_25_Feb_19.xlsx XLSX spreadsheet
Attachment_27_-_G-03.dwg DWG drawing
Attachment_32_-_1822_BealeAFB_GavinMandry_Bridge_X-sections.dwg DWG drawing
Attachment_9.1_Beale_AF_Basin-Wide_Comprehensive_Analysis.pdf PDF
Attachment_18_-_Gavin_Mandry_Bridge_Survey_Shots.pdf PDF
Attachment_25_-_G-01.dwg DWG drawing
Attachment_33_-_1822_BealeAFB_GavinMandry_Bridge_X-sections_REV.CSV CSV file
Attachment_30_-_BEALE_BRIDGES.DXF DXF file
Attachment_9.2_Beale_AF_Basin-Wide_Comprehensive_Analysis.pdf PDF
FA468619RA0020005_Conformed.pdf PDF
Attachment_1_-_Wage_Determination,_Dated_22_Feb_2019.pdf PDF
FA468619RA0020003_SF_30_.pdf PDF
Solicitation_Amendment_FA468619RA0020004_SF_30.pdf PDF
FA4686~2.PDF PDF
FA468619RA0020004_Conformed_Copy.pdf PDF
Atch_11_-_Amendment_01_Confirmation.pdf PDF
SOLICI~1.PDF PDF
Solicitation_-_FA468619RA002.pdf PDF
Atch_1_-_Wage_Determination.pdf PDF
Atch_2_-_AF_3064_-_Progress_Schedule.pdf PDF
Atch_6_-_Work_Site_Boundary.pdf PDF
Atch_3_-_AF_3065_-_Progress_Report.pdf PDF
Atch_4_-_AF66_Schedule_of_Material_Submittals.xls XLS spreadsheet
Atch_8_-_AECOM_Engineering_Assessment_Report.pdf PDF
Atch_7_-_AF_813.pdf PDF
Atach_10_-_Riparian_Mitigation_Planting_Guidelines.pdf PDF
Atch_5_-_AF3000.pdf PDF
Show all 44

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Work Request Form

Installation Geospatial Information & Services (IGI&S) OfficeInstallation Geospatial Information & Services (IGI&S) Office
GeoBase Data RequestGeoBase Data Disclaimer
9th Civil Engineer Squadron9th Civil Engineer Squadron
Requestor’s NameRank/GradeOrg/Office SymbolWork Phone
Mitch MonroeCivilian GS-129 CES/CEN634-2668Disclaimer to be signed before release of any electronic Beale GIS data.
Email AddressProject Manager:
mahasringha.monroe.1@us.af.milMitch Monroe
Request DateDue DateRequest Type
2/22/192/25/19Aerial PhotoCDMapOtherAlthough every effort has been made to ensure the accuracy of
information, errors and conditions originating from physical sources
Description: (please be as specific as possible so that your work may be processed expediently)used to develop the database maybe reflected in the data supplied.
LIDAR Data for 4 Bridges Project Area, where Gavin Mandery Drive crosses Best Slough and Dry Creek.The end user must be aware of the data conditions and ultimately
bear responsibility and the appropriate use of the information with
respect to possible errors, original map scale, collection methodology,
currency of data, and other conditions specific to certain data.
LIMITED DISTRIBUTION
Distribution authorized to DoD, IAW 10 U.S.C. §130 & 455. Release
authorized to U.S. DoD contractors IAW 48 C.F.R. §252.245-7000.
Justification: (include Project and/or Work Order Number request is in support of)Removal of this caveat is prohibited.
This data will be used as a basis for topography to generate conceptual design drawings and calculate quantities for bidding puposes.
This material is For Official Use Only. Unauthorized reproduction,
distribution, publication, or exhibition of this material is
STRICTLY PROHIBITED. Refer other requests to 9CES/CEP.
Destroy as For Official Use Only. 9CES/CEP shall not be liable
for any errors, omissions, or damages that result from noncompliance
*CONTRACTORS MUST READ AND SIGN REVERSE OF THIS PAGE*of this message.
Office Use OnlyUpon completion of the project, the data shall be returned
Project Assigned To:to the base or destroyed as For Official Use Only.
Project Approved By:Completed By:I have read and agree to abide by the above data disclaimer.
Completion Date/Project LengthDate Notified of StatusDelivery Date/TimeName of Company
NotesMethod
E-Mail PhoneUser Pick-upName of Contractor
SignedDate
Recipient's Signature at time of Pick-up (not required if emailed)
N/A
Date Returned or Destroyed

x xxxxxx mahasringha.monroe.1@us.af.mil

Disclaimer

Sheet3

File details come from the government source that posted it.