Attachment__2__AF_3052_-_Construction_Cost_Estimate_Breakdown_PDF.PDF
PDF 92 KB Posted
- Attached to
- Handyman MACC Federal contract opportunity
- Solicitation number
- FA4686-15-R-0008
About this file
Construction Cost Estimate Breakdown
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment___5_Hold_Harmless_Agreement_-_Handyman.docx | DOCX document | |
| Attachment__6_Entry_Authorization_List_(EAL)_Template.xls | XLS spreadsheet | |
| Attachment__7 _Draft_Past_Performance_Questionnaire.docx | DOCX document | |
| TOPR_Attachment__1_Statement_of_Need_MCE_Turnstile.doc | DOC document | |
| TOPR_Attachment__2_Site_Picture.pdf | ||
| FA4686-15-R-0008 _Handyman_Solicitation.doc | DOC document | |
| Attachment__4_DBA_Wage_Determination_CA150009_14_Aug_2015_CA9.pdf | ||
| Attachment__1_SOW_Handyman_13_Aug.doc | DOC document | |
| Attachment__3_MCE_Turnstile_Task_Order_Proposal_Request.doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION: FA4686-15-R-0008
ATTACHMENT #2
DATE
ADDRESS
LINE
NO.
ITEM
(1)
UNIT OF
MEASURE
(2)
QUANTITY
(3)
UNIT
(4)
TOTAL
(5)
MANHOURS
MANDAYS
(6)
AVERAGE
RATE
(7)
TOTAL
(8)
OTHER
DIRECT
COSTS
(9)
LINE TOTAL
(10)
CONTRACTOR
PROPOSED TOTAL CONTRACT PRICECONTRACT FOR (Work to be performed)
LABOR COSTS MATERIAL COST
WORK LOCATIONPROJECT NUMBERPURCHASE REQUEST NUMBER
CONSTRUCTION COST ESTIMATE BREAKDOWN
AF 3052
SOLICITATION: FA4686-15-R-0008
ATTACHMENT #2
INSTRUCTIONS FOR COMPLETING AF FORM 3052
Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.
Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples -- square yards -- SY, cubic yards -- CY, square feet -- SF, linear feet -- LF, board feet -- BF, each -- EA, pound -- LB).
Col 3 Quantity. Contractor's estimate of quantity required in terms of unit of measure (column 2 ). Items and units of measure will be fur--nished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.
Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5 ) for item listed in column 1.
Col 6. 7, and 8 Labor Costs. Enter in Col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1.
Enter in Col 7 the average rate per mahour (manday ) and in Col 8 the total labor cost.
Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in Col 1 ) which are special to the contract and of significant dollar value. Identify Subcontractor costs here and include back-up documentation on how these costs were derived.
Col 10 Line Total. Self-explanatory.
NOTE: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:
1 TOTAL MATERIAL COSTS: $ _________________________ (Column 5 Total)
2 TOTAL LABOR COSTS: $ _________________________ (Column 8 Total)
3 TOTAL OTHER DIRECT COSTS: $ _________________________ (Column 9 Total)
4 TOTAL DIRECT COSTS: $ _________________________ (Column 10 Total, = Items 1 + 2 + 3)
5 OVERHEAD @ ____________% $ _________________________ (Item 4 x Item 5 %)
6 PROFIT @ ____________% $ _________________________ (Item 4 x Item 6 %)
7 SUBTOTAL: $ _________________________ (Item 4 + 5 + 6)
8 BOND @ ____________% $ _________________________ (Item 7 x Item 8 %)
9 TOTAL PRICE: $ _________________________ (Item 7 + 8))
INSTRUCTIONS TO OFFERORS
1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs (and attached supporting information ) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal the offeror shall, under the conditions stated in FAR 15.804-2, be required to submit a certificate of current cost or pricing data (see FAR 15.804 ).
2. In addition to the specific information required by this form, the offeror is expected, in good faith, to incorporate in and submit and submit with this form any additional data, supporting schedules, or substantiation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clear understanding of
a. The existing, verifiable data.
b. The judgmental factors applied in projecting from known data to the estimate, and
c. The contingencies used by the offeror in their proposed price.
In short, the offeror's estimating process itself needs to be disclosed.
3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate ), and made available to the contracting officer or his authorized representative upon request.
4. Submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such negotiations prior to contract award.
(Reverse of AF Form 3052, Jan 88) *U.S. GOVERNMENT PRINTING OFFICE: 1988-240-979:51349
File details come from the government source that posted it. Updated .